Reference no: EM133204666
Risk assessment
Organisation - ABC
Part 1: Background
This is only for Practice/ demo for training purposes and never be copied in your final submission.
Topic
Name of organisation*
Site location*
Number of workers
General description of the organisation
Description of the area to be included in the risk assessment
Any other relevant information
You should aim to complete this section in 100 - 200 words.
Note: this section can be completed after you have completed your risk assessment.
Outline how the risk assessment was carried out this should include:
• sources of information consulted;
• who you spoke to; and
• how you identified:
- the hazards;
- what is already being done; and
- any additional controls/actions that may be required.
Part 2: Risk Assessment
Hazard category and hazard
1. Electrical Hazard
Observed a plumber using an electric drill to make a hole in the wall of the washroom and the drill is having damaged insulation on the wire.
3. Manual Handling
Observed Helper carrying 50 Kg Cement bag on their back from ground floor to the second floor of the construction site.
6. Fire Hazard
Observed lots of Cigarette buds lying near the flammable material storage
15. Noise hazard
Observed the diesel generator used for power generation in the site is producing noise
Part 3: Prioritise 3 actions with justification for the selection
Moral and financial arguments for ALL actions
Moral, general legal and financial arguments
Justification for action 1
Action
Specific legal arguments
Consideration of likelihood AND the severity
How effective the action is likely to be in controlling the risk. This should include:
• the intended impact of the action;
• justification for the timescale that you indicated in your risk assessment; and
• whether you think the action will fully control the risk.
Justification for action 2
Action
Specific legal arguments
Consideration of likelihood AND the severity
How effective the action is likely to be in controlling the risk. This should include:
• the intended impact of the action;
• justification for the timescale that you indicated in your risk assessment; and
• whether you think the action will fully control the risk.
Justification for action 3
Action
Specific legal arguments
Consideration of likelihood AND the severity
How effective the action is likely to be in controlling the risk. This should include:
• the intended impact of the action;
• justification for the timescale that you indicated in your risk assessment; and
• whether you think the action will fully control the risk.
Part 4: Review, communicate and check
Suggested word counts for each section:
• Planned review date or period and reasoning for this: 50 - 100 words
• How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
• Follow up on the risk assessment: 100 - 150 words.
Planned review date/period with reasoning
How the risk assessment findings will be communicated AND who do you need to tell
How you will follow up on the risk assessment to check that the actions have been carried out
Attachment:- forms-assignment.rar