Indicate what controlling measures should be taken during the planning phase. Then provide a generic method for creating a project schedule starting with the creation of the work breakdown structure. Integrate the control measures you surveyed initially in the recommended framework and discuss resource leveling.
:The project planning ensures that the plan envisaged at the start is an effective management tool throughout the project and it does not take a wrong path. For this purpose a group, called Monitoring and controlling group is formed which overlooks the entire project to monitor and control it. The responsibilities of the group entail monitoring and controlling project work, perform integrated change control, verify scope, control: scope, schedule and costs, Perform quality control, report performance, monitor and control risks and administer procurements.The objective is that the project may meet the constraints of quality, cost and schedule in time.
Project schedule lists the elements detailing the start up to finishing date of the project. It attempts to forecast the approximate tenure of the completion and closure of the project and if there is deviation from the set course the areas where it is lagging accelerated, necessary changes are made by modifying the approaches.The Work Breakdown Structure is a list of project's phases and milestones. The best way to solve any problem is to break it down to small pieces or tasks within each of the major tasks until each of them become manageable. Status of task can be reported by the Team Members responsible for them and in turn allow the Project Manager take corrective measures to avoid any lurking problem. At the same time it is equally important to identify the tasks dependent on each other.
What controlling measures should be taken during the planning phase.
What are the four alternatives a project organization can adopt in deciding how to address and respond to its risks?
What are the pros and cons to the systems view approach?
Justify the influence of stakeholders in the project management plan and their role in communication planning.
What factors need to be considered when balancing productivity with quality in a service organization? What are the consequences of focusing on only one factor?
Use the CPI to calculate the estimate at completion (EAC) for this project. Is the project performing better or worse than planned?
Calculate the annual holding cost rate for FFF?
Each of the tasks needs an estimate of how long it will take.
Calculate company's profit at each level of production. Assume that the company will sell all of its output. At what production level is profit maximized?
Why is this method better for some projects than risk mapping, FMEA, the gut-feeling method, and the Delphi method?
Whose advice would you seek regarding the pipeline projects? How would you evaluate them to see if they add value under your new "vision" of portfolio management?
Design an online system for the human resources department to manage available job positions.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd