Toshiba’s Notebook Computer Assembly Line Toshihiro Nakamura, manufacturing engineering section manager, is examining the prototype assembly process sheet (shown in Exhibit 6.8) for the newest subnotebook computer model. With every new model introduced, management felt that the assembly line had to increase productivity and lower costs, usually resulting in changes to the assembly process. When a new model is designed, considerable attention is directed toward reducing the number of components and simplifying parts production and assembly requirements. This new computer was a marvel of high-tech, low-cost innovation and should give Toshiba an advantage during the upcoming fall/winter selling season. Production of the subnotebook is scheduled to begin in 10 days. Initial production for the new model is to be 150 units per day, increasing to 257 units per day the following week (management thought that eventually production would reach 309 units per day). Assembly lines at the plant normally are staffed by 10 operators who work at a 14.4-meter-long assembly line. The line is organized in a straight line with workers shoulder to shoulder on one side. The line can accommodate up to 12 operators if there is a need. The line normally operates for 7.5 hours a day (employees work from 8:15 A.M. to 5:00 P.M. and regular hours includes one hour of unpaid lunch and 15 minutes of scheduled breaks). It is possible to run one, two, or three hours of overtime, but employees need at least three days’ notice for planning purposes. The Assembly Line At the head of the assembly line, a computer displays the daily production schedule, consisting of a list of model types and corresponding lot sizes scheduled to be assembled on the line. The models are simple variations of hard disk size, memory, and battery power. A typical production schedule includes seven or eight model types in lot sizes varying from 10 to 100 units. The models are assembled sequentially: All the units of the first model are assembled, followed by all the units of the second, and so on. This computer screen also indicates how far along the assembly line is in completing its daily schedule, which serves as a guide for the material handlers who supply parts to the assembly lines. Exhibit 6.8: Notebook Computer Assembly Process Sheet TASK TASK TIME (SECONDS) TASKS THAT MUST PRECEDE 1. Assemble Cover 82 None 2. Install LCD in Cover 50 Task 1 3. Prepare Base Assembly 25 None 4. Install M-PCB in Base 32 Task 3 5. Install CPU 25 Task 4 6. Install Backup Batteries and Test 40 Task 4 7. Install Accupoint Pointing Device and Wrist Rest 32 Task 4 8. Install Speaker and Microphone 47 Task 4 9. Install Auxiliary Printed Circuit Board (A-PCB) on M-PCB 28 Task 4 10. Prepare and Install Keyboard 25 Task 9 11. Prepare and Install Digital VideoDrive (DVD) and Hard Disk Drive (HDD) 46 Task 10 12. Install Battery Pack 10 Task 11 13. Insert Memory Card 4 Task 12 14. Start Software Load 9 Tasks 2, 5, 6, 7, 8, 13 15. Software Load 282 Task 14 16. Test Video Display 62 Task 15 17. Test Keyboard 58 Task 16 The daily schedules are shared with the nearby Fujihashi Parts Collection and Distribution Center. Parts are brought from Fujihashi to the plant within two hours of when they are needed. The material supply system is very tightly coordinated and works well. The assembly line consists of a 14.4-meter conveyor belt that carries the computers, separated at 1.2-meter intervals by white stripes on the belt. Workers stand shoulder to shoulder on one side of the conveyor and work on the units as they move by. In addition to the assembly workers, a highly skilled worker, called a “supporter,” is assigned to each line. The supporter moves along the line, assisting workers who are falling behind and replacing workers who need to take a break. Supporters also make decisions about what to do when problems are encountered during the assembly process (such as a defective part). The line speed and the number of workers vary from day to day, depending on production demand and the workers’ skills and availability. Although the assembly line has 12 positions, often they are not all used. Exhibit 6.9 provides details of how the engineers who designed the new subnotebook computer felt that the new line should be organized. These engineers designed the line assuming that one notebook would be assembled every two minutes by six line workers. Exhibit 6.9: Engineers' initial design of the assembly line ASSEMBLY LINE POSTION TASKS WORKSTATION NUMBER LABOR TIME (SECONDS) 1 1. Assemble Cover (82) 1 82 2 2. Install LCD in cover (50) 2 50 + 25 = 75 3. Prepare Base Assembly (25) 3 4. Install Main Printed Circuit Board (M-PCB) in Base (32) 3 32 + 25 + 40 = 97 5. Install CPU (25) 6. Install Backup Batteries and Test (40) 4 7. Install Accupoint Pointing Device and Wrist Rest (32) 4 32 + 47 + 28 = 107 8. Install Speaker and Microphone (47) 9. Install Auxiliary Printed Circuit Board (A-PCB) on M-PCB 5 10. Prepare and Install Keyboard (25) 5 25 + 46 + 10 + 4 + 9 = 94 11. Prepare and Install Digital Video Drive (DVD) and Hard Disk Drive (HDD) (46) 12. Install Battery Pack (10) 13. Insert Memory Card (4) 14. Start Software Load (9) 15. Software Load (26) 6 Software Load (120) 7 Software Load (120) 8 Software Load (16) 9 16. Test Video Display (62) 6 120 17. Test Keyboard (58) 10 Empty 11 Empty 12 Empty In words, the following is a brief description of what is done at each workstation: Workstation 1: The first operator lays out the major components of a computer between two white lines on the conveyor. The operator then prepares the cover for accepting the LCD screen by installing fasteners and securing a cable. Workstation 2: The second operator performs two different tasks. First, the LCD screen is installed in the cover. This task needs to be done after the cover is assembled (task 1). A second independent task done by the operator is the preparation of the base so that the Main Printed Circuit Board (M-PCB) can be installed. Workstation 3: Here the M-PCB is installed in the base. After this is done, the Central Processing Unit (CPU) and backup batteries are installed and tested. Workstation 4: The Accupoint Pointing Device (touch pad) and wrist rest are installed, the speaker and microphone installed, and the Auxiliary Printed Circuit Board (A-PCB) installed. These are all independent tasks that can be done after the M-PCB is installed. Workstation 5: Here tasks are performed in a sequence. First, the keyboard is installed, followed by the DVD and Hard Disk Drive (HDD). The battery pack is then installed, followed by the memory card. The computer is then powered up and a program started that loads software that can be used to test the computer. Actually loading the software takes 282 seconds, and this is done while the computer travels through positions 6, 7, and 8 on the assembly line. Computers that do not work are sent to a rework area where they are fixed. Only about 1% of the computers fail to start, and these are usually quickly repaired by the “supporter.” Workstation 6: The video display and keyboard are tested in this workstation. After assembly, the computers are moved to a separate burn-in area that is separate from the assembly line. Here computers are put in racks for a 24-hour, 25°C “burn-in” of the circuit components. After burn-in, the computer is tested again, software is installed, and the finished notebook computer is packaged and placed on pallets for shipment to Toshiba distribution centers around the world. Tweaking the Initial Assembly-Line Design From past experience Toshihiro has found that the initial assembly-line design supplied by the engineers often needs to be tweaked. a. If the assembly line is to be redesigned to operate at 309 units per day without using overtime, what is the maximum cycle time to meet this production rate? (Round DOWN "maximum cycle time" values to the next smallest integer) Cycle time seconds per unit b. Develop an assembly line layout with the fewest possible assembly line positions and the fewest possible workstations with labor to produce 309 units per day without using overtime. What is the efficiency of this new assembly line layout? (Round Efficiency to 2 decimal places.) Efficiency % In your new layout, how many workstations include labor? Number of workstations with labor workstations. Can this assembly line layout fit on the existing 12-position conveyor belt system? Yes No

Reference no: EM132223686

Questions Cloud

Municipal officials in emergency or disaster management : Provide short- and long-term recommendations for improving the collaboration between public health, public safety, and municipal officials in emergency
Draw a graph of the effective stress at the mid-layer : ENEC20003 - Numerical Analysis - CQ university - Create one analysis for each day and set the new analysis as a child of the previous analysis
By articulating strategic vision-statement of future course : By articulating a strategic vision, a statement of the future course and direction of the company, management:
Analyze the changes in healthcare management field : Analyze the changes in healthcare management field to determine if there have been periods of time in which leaders in the field,
Notebook computer assembly line : Toshiba’s Notebook Computer Assembly Line Toshihiro Nakamura, manufacturing engineering section manager, is examining the prototype assembly process sheet
Data driven decisions within quality management project : Discuss the importance of making data driven decisions within a quality management project,
Evaluation of a foster parent training program : For this Discussion, you evaluate group research design methods that can be used for an outcome evaluation of a foster parent training program
Six sigma tools used for improving patient safety : What are 3 Six Sigma tools used for improving patient safety, quality and overall patient satisfaction in a hospital?
Emergency responders and public health and public safety : Discuss the primary weaknesses of the collaboration between emergency responders and public health, public safety, and municipal officials.

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd