Needed from specialized heavy equipment suppliers

Assignment Help Operation Management
Reference no: EM132139926

Buildit is a construction company specialized in public works (roads, bridges, pipelines, tunnels, railroads, etc.). Within Buildit, it often occurs that engineers working at a construction site (called “site engineers”) need a special type of equipment, such as a truck, an excavator, a bulldozer, a water pump, etc. Buildit has some heavy equipment available in its depot, but very often, it hires equipment when needed from specialized heavy equipment suppliers.

A piece of heavy equipment is called a “plant” in the construction jargon. When a site engineer needs to hire a plant, he/she sends a Plant Hire Request to one of the clerks at the depot. This request takes the form of a PDF document that the site engineer has to fill in. It takes on average 15 minutes for the site engineer to fill in and send the PDF file. Incoming plant hire requests usually stay about 15 minutes in the clerk’s mailbox before being processed.

The clerk at the depot first checks if an appropriate plant (owned by BuildIt) is available at the depot for the required period of time. If it is, the request is filled within one hour and the plant is delivered to the construction site usually in 4 hours. This happens in 10% of the cases. Otherwise, the clerk checks an information system that lists all equipment offered by the suppliers and selects the most cost-effective plant that complies with the request. She then checks the availability of the selected plant with the plant’s supplier via phone or e-mail. This availability enquiry takes on average one hour. Sometimes (about 20% of the times), the selected plant is not available and the clerk has to select another plant and check its availability with its supplier, and so on.

Once the clerk has found a suitable plant available for hire, she recommends that it be engaged (to “engage a plant” is the term used to say that the plant will be hired). The engagement of every plant has to be approved by a “works engineer” who also works at the depot. The works engineer usually approves plant engagement requests twice per day. Because of that, a plant engagement approval takes on average 3 hours. In 10% of the cases, the works engineer rejects the plant engagement request. Half of the rejections lead to the cancellation of the Plant Hire Request (no plant is hired at all). The other 50% of rejections are resolved by replacing the selected plant with another plant (a cheaper plant or a more appropriate for the job). In this latter case, the clerk needs to perform another availability enquiry (or several enquiries). Once the works engineer has approved the engagement, the clerk sends a confirmation to the supplier (including a Purchase Order for hiring the plant) and she records the engagement in an Excel spreadsheet that she maintains in order to keep track of all the approved plant engagements. The clerk generates the Purchase Order using the company’s financial information system (the “Finance Module” of an ERP system). It takes about 1 hour for the clerk to prepare and send the confirmation and purchase order. Most of this one hour is “waiting time”.

During the process, it may happen (about 10% of the times) that the site engineer decides that the plant is no longer needed. In this case, he/she asks the clerk to cancel the request for hiring the plant.

When the plant is hired, the supplier delivers it to the construction site at the required date (or in about 6 working hours if the request is urgent). The site engineer inspects the plant and if everything is in order, he/she accepts the engagement and the plant is put into use. In 10% of the cases, the plant is sent back because the plant does not comply with the original specifications of the site engineer. In this case, the site engineer has to start the process all over again.

When the period of engagement is concluded, the supplier comes to pick up the plant. Sometimes (20% of the cases), the site engineer asks that the period of engagement to be extended. In this case, the site engineer requests an extension directly to the plant’s supplier by e-mail or phone.

On average, a plant is hired for a total period of 8 days (including extensions). Each plant hiring costs on average EUR 200 per day, but there is a lot of variation: some types of plant (e.g. submersible water pump) costs EUR 60 per day, while others (e.g. a large excavator) can cost up to EUR 400 per day.

Five working days after the plant is picked up, the plant’s supplier sends an invoice to the clerk by e-mail. After checking that the engagement corresponding to the invoice was fulfilled (by contacting the site engineer), the clerk forwards it to the financial department. It takes on average 10 days for an approved invoice to be paid. The approval of the invoice takes on average 5 days, oftentimes because site engineers are very busy and do not take the time to do their part of the approval. In about 10% of cases, the invoice is not approved, either because the site engineer states that the plant was not used to the stated period, or because the amounts in the invoice do not match the prices initially quoted, or because the invoice includes amounts for damages to the plant and the site engineer does not agree that those damages took place. These rejection cases take about 5 days to resolve. In some cases, the problem comes from an error of the clerk or the site's engineer and the issue is resolved internally. In other cases, the problem is resolved when the supplier sends a revised invoice. This revised invoice is then approved (100% of cases) and forwarded to the financial department.

Model the "as is" process in BPMN?

Reference no: EM132139926

Questions Cloud

Discuss the four broad categories of development methods : Discuss the four broad categories of development methods. Discuss why it might be beneficial to combine all of these methods into a formal development program.
Designed for selecting engineers in their facility : Atlas Industries uses a test that was designed for selecting Engineers in their facility.
Who participated in your brainstorming activities : Describe the brainstorming method/approach you used in this Workshop and identify those who participated in your brainstorming activities:
Discuss home depot international strategy : Discuss Home Depot’s international strategy? Outline the risks it faces as it begins operations in China.
Needed from specialized heavy equipment suppliers : Buildit has some heavy equipment available in its depot, but very often, it hires equipment when needed from specialized heavy equipment suppliers.
The home depot considers entering china : Which industry characteristics should Home Depot Asia's strategy should be influenced by? What is your conclusion regarding the Competitive Analysis.
Influence inter-industry wage-salary differentials : Discuss at least two (2) factors that you believe influence inter-industry wage/salary differentials.
Find the reorder point and service probability be : Find the reorder point necessary to provide a 95 percent service probability. what will the new service probability be?
Evaluated to determine sensitivities and interactions : What market-mix considerations need to be evaluated to determine sensitivities and interactions?

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd