Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Transpower is asking for anyone with ideas that could delay the need for new power lines into Auckland to come forward.
As owner and operator of the national electricity grid, Transpower is planning up to $1.5 billion of new investment. But before it can be approved, it needs to assure the Electricity Commission there is not a better way of doing the job. So it has publicly asked for possible "non-transmission" alternatives for meeting the rapidly increasing demand in Auckland and Northland. This could include new power stations or ways of reducing peak demand. Instead of big power stations and long transmission lines, there is an increasing trend towards smaller generators, built closer to where the electricity is actually needed.
Transpower chief executive Ralph Craven said the company had been "of the view for some time that significant investment in the national grid into Auckland is needed by 2010".
The above extract from the NZ HERALD indicates the need for radical future plans to alleviate the very real problem we are faced with in New Zealand. Address this problem, by providing an answer to Transpower, to complete this assignment.
Verified Expert
Give three advantages of a three-phase system over a single-phase system There are two basic three-phase connections, the wye connection and the delta connection. Draw a labelled diagram showing the wye connection
A process worker received an electric shock when she attempted to turn off a conveyer control. The toggle switch controlled the power to a variable speed drive. An examination found that dust had accumulated on the toggle switch. Moisture on the ..
Write a short technical report on Frequency Division Multiplexing
Define static electricity and State five sources of static electricity and Describe three methods used to reduce hazards due to static electricity
Interpret manufacturer's data sheet to select appropriate combinational logic devices for specific purposes
Utilizing the rat stereotaxic atlas in the course materials, devise a surgical plan for implanting a Michigan type array
Briefly discuss the impact of electron energy, electron current and target on the Bremsstrahlung generated.
How a transformer works and apply those rules to a transformer where the primary core cross-sectional area is twice.
Derive the dynamic model and average value circuit of a buck converter assuming the ESRs of the inductor and capacitor are not equal to zero.
Implement a multiple mode counter
Analyzing the Blink Alive code - Embedded Systems Design
Explain the operation of sequential logic devices and evaluate the output waveform in relation to the clock for QA, QB and QC in the subsequent circuit and show the binary sequence represented by these waveforms
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd