?nd the necessary planned order releases for all components

Assignment Help Mathematics
Reference no: EM13192257

One unit of A is made of two units of B and one unit of C. B is made of three units of D and one unit of F. C is composed of three units of B, one unit of D, and four units of E. D is made of one unit of E. Item C has a lead time of one week; Items A, B, E, and F have two-week lead times; and Item D has a lead time of three weeks. Lot-for-lot lot sizing is used for Items C, E, and F; lots of size 20, 40, and 160 are used for Items A, B, and D, respectively. Items A, B, D, and E have on-hand (beginning) inventories of 5, 10, 100, and 100, respectively; all other items have zero beginning inventories. We are scheduled to receive 10 units of A in Week 3, 20 units of B in Week 7, 40 units of F in Week 5, and 60 units of E in Week 2; there are no other scheduled receipts. If 20 units of A are required in Week 10, use the low-level-coded bill of materials (product structure tree) to ?nd the necessary planned order releases for all components.

Reference no: EM13192257

Questions Cloud

How factoring a trinomial with a leading coefficient : Explain how factoring a trinomial with a leading coefficient of one is related to the FOIL method of multiplication. Give an example of this relationship.
What is the missing dimension of the square pyramid : what is the missing dimension of the square pyramid s=14yd, V=489yd3
What will happen to the m1 money supply : Refer to the simplified balance sheet for a bank and answer the following questions. Assets Liabilities Reserves $10,000 Deposits $70,000 Loans $66,000 Stockholder's equity $6,000 a. If the required reserve ratio is 5 percent, how much in excess rese..
How long will it take for the two trains to meet : Two trains leave stations 448 miles apart at the same time and travel toward each other. One train travels at 85 miles per hour while the other travels at 75 miles per hour. How long will it take for the two trains to meet?
?nd the necessary planned order releases for all components : If 20 units of A are required in Week 10, use the low-level-coded bill of materials (product structure tree) to ?nd the necessary planned order releases for all components.
Compute the net future worth of each project : Given: Period Project cash flows (n) A B C D 0 $(5,000.00) $(2,000.00) $4,500.00 $(3,500.00) 1 $5,800.00 $(4,400.00) $(6,000.00) $1,000.00 2 $12,400.00 $7,000.00 $2,000.00 $5,000.00 3 $8,200.00 $3,000.00 $4,000.00 $6,000.00  Compute the net future wo..
How tall is the tree : a tree leans at an angle of 8 degrees from the vertical. from a point 7m from th bottom of the tree, the anglr of elevation to the top of the tree is 68 degrees. how tall is the tree?
Developing domain model class diagrams : The stock levels of each item are changed by the system with each purchase. However these levels need to be manually updated by a clerk in certain cases such as shipments of items from manufacturers, refunds, exchanges, etc.
What is the length of each side : The perimeter of a square garden is 248 metres. What is the length of each side?

Reviews

Write a Review

Mathematics Questions & Answers

  Questions on ferris wheel

Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.

  Logistic map

This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.

  Finding the probability of cards

This assignment has questions related to probabiltiy.

  Systems of ode

Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.

  Derive the boolean expression

Derive the Boolean Expression and construct the switching circuit for the truth table stated

  System of equations

Evaluate which equations are under-identified, just-identified, and over-identified.

  Linear programming problem

Linear programming problem consisting of only two constraints with one objective function.

  Find the natural domain

Find the natural domain of the given functions.

  Introduction to numerical methods

Compute the coecients of the polynomials using the term recurrence relation.

  Chart of the topological manifold

De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.

  Mathematics in computing

Questions related on mathematics in computing.

  Complex problems

Complex problems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd