In March 1964, the Ecuadorian government invited Texaco, Inc. (Texaco) and Gulf oil corporation (gulf) to conduct exploratory activities in the Oriente, an area that includes the eastern lowlands and slopes of the Andes and a portion of the Amazon River basin. Texaco and Gulf formed a consortium (Consortium) with equal ownership rights through their Ecuadorian subsidiaries to conduct this exploration. The Consortium discovered oil in commercial quantities in 1967 and began export operations in 1972 after completion of a pipeline to Ecuador’s Pacific coast. Texaco served as the operator on behalf of the Consortium throughout this period of time. The Consortium underwent significant changes in the 1970s. The state-owned oil company-Compania Estatal Petrolera Ecuadorian (CEPE; later reorganized as Petroecuador)-assumed a stake in the Consortium in June 1974 and purchased Gulf’s stake in December 1976. From 1977 to 1990, the Consortium operated with Texaco and CEPE/ Petroecuador as the only participants and Texaco as the operator. On July 1, 1990, Petroamazonas, a subsidiary of Petroecuador, replaced Texaco as the operator. The concession agreement expired on June 6, 1992. Ecuador elected not to renew the agreement and assumed complete control of the concession area. At the time of the terminator of Texaco’s interest, the Consortium had operations on more than one million acres; had 339 wells, 18 production stations, and 1500 kilometers of pipelines; and had extracted more than 1.4 billion barrels of oil.

The consortium’s operations exacted a heavy toll on the environment. Oil production and pipeline operations were alleged to have resulted in the discharge of 26 millions gallons of crude oil and toxic wastewater into the surrounding environment. Approximately 2.5 million acres were impacted by oil-related discharges into wetlands, streams, and rivers and leeching into soil and groundwater. The Consortium dug and operated hundreds of unlined pits, which were used to store toxic chemicals utilized in drilling operations as well as other runoff. Additional sources of environmental contamination included the burning of crude oil, the flaring of approximately 235 billion cubic feet of natural gas and spraying of roads with crude oil for maintenance and dust control.

Ecuador threatened to sue Texaco for environmental injuries. As a result, in May 1995, Texaco, Ecuador, and Petroecuador entered into a contract (Remediation Agreement) wherein Texaco agreed to perform work on designated sites in return for a release of claims form Ecuador and Petroecuador. The Remediation agreement released Texaco and all related companies from claims arising from environmental degradation associated with the Consortium’s activities other than those arising from remediation Texaco was obligated to perform. texaco began remediation in 1995 and completed this work in 1998. Texaco spent $40 million in this effort, which included closing and remediating 161 waste pits and 7 overflow areas, plugging and abandoning 18 wells, and cleaning soil at 36 sites. texaco also installed three produced water treatment and reinfection systems, provided Petroecuador with equipment for ten additional systems, designed three oil containment systems, and conducted extensive replanting of native vegetation at the remediated sites. texaco also made two payments of $1 million each for socioeconomic projects and made payments totaling $4.6 million to affected municipalities in the region. In September 1998, the Ecuadorian government and Petroecuador signed a document (final act) in which they recognized that Texaco had fulfilled its obligations pursuant to the 1995 agreement and released it from current and future liability.

In November 1993, 74 Ecuadorians filed a class action lawsuit against Texaco in the U.S district court for the southern district of new york. The plaintiffs purported to represent more than 30,000 persons residing in the Oriente who had suffered damages from hydrocarbon contamination as a result of the consortium’s operations. The claims were ultimately dismissed on Texaco's motion on the basis of forum nonconveniens, which dismissal was upheld on appeal.

In May 2003, 46 Ecuadorian residents filed a lawsuit against Chevron Corporation (Chevron) in the superior court of justice of Nueva loa in the sucum-bios province. the plaintiffs based their lawsuit on provisions of the Ecuadorian constitution guaranteeing citizens the right to live in a healthy environment and the environmental management law of 1999 that recognized a ”popular action” to obtain damages for environmental injuries. The amount of damages was not initially specified but was later calculated at $27.3 billion.

Chevron asserted numerous defenses. chevron initially contended that there was no valid claim against it or Texaco as the environmental management law could not be applied retroactively pursuant to Ecuador's constitution, civil code, and applicable case law. Furthermore, it asserted that the claims were barred by the remediation agreement and final act. additionally, Chevron claimed that the plaintiffs sued the wrong entity by failing to assert claims against Texaco. specifically, Chevron contended that it did not acquire Texaco in 2001 and thus were not responsible for its liabilities, including responsibilities for environmental injury in Ecuador. rather, Texaco was merged with a wholly owned subsidiary of Chevron called keeper, Inc. chevron also alleged that the superior court lacked personal jurisdiction as chevron had never operated in Ecuador, that the plaintiffs’ claims were barred by Ecuador's four-year statute of limitations, and that the plaintiffs lacked standing as they failed to plead individualized personal injury or property damage.

The superior court deferred ruling on these defenses and commenced trial in October 2003. the conduct of the trial stirred considerable controversy and provided chevron with additional defenses. these controversies include procedural anomalies relating to evidence collection, the testing of soil and water samples, the use of expert witnesses, and the methods utilized to calculate damages. chevron also claimed that the superior court was influenced by political pressure exerted primarily by Ecuadorian president Rafael Correa and that the trial judge lacked integrity.

Although Texaco and chevron’s defense of u.s and Ecuadorian litigations is within the procedural rules in both jurisdictions, is it the appropriate moral response to environmental contamination in Ecuador? Is chevron’s conduct consistent with teleological frameworks for ethical thinking? did chevron’s response to the litigation promote its self-interest to the greatest degree possible as set forth in ethical egoism? what might become of environmental protection in the developing world if chevron successfully defends the litigation? was Texaco's behavior ethical based on the time and place of its occurrence? did Texaco's conduct and chevron’s litigation strategy produce the greatest overall good for affected persons as set forth in utilitarianism? Does the potential outcome to the Ecuadorian litigation demonstrate the difficulties inherent in utilitarianism with respect to measuring outcomes and predicting the success, failure, or utility of certain behaviors?

Is chevrons conduct consistent with deontological frameworks for ethical thinking? Is chevron setting an example by which other multinational corporations may conduct their operations in the developing world? Did Texaco's conduct treat Ecuadorians as means to the end of exploiting oil and gas resources? is chevron’s decision to vigorously defend the Ecuadorian litigation and resist settlement the fairest and most equitable resolution as anticipated by contractarianism?

Reference no: EM131785714

Questions Cloud

Computing basic earnings per share and diluted : computing basic earnings per share and diluted earnings per share on December
Understanding cultural differences can play a major role : Understanding cultural differences can play a major role in the success of a GIS.How would you resolve such differences?
Determine the expected values e : A sine wave with a steady component has the equation.Determine the expected values E(x) and E(x2).
Determine the departmental factory overhead rates : Problem - Multiple production department overhead rates. Determine the departmental factory overhead rates for both departments
Moral response to environmental contamination in ecuador : Ecuadorian litigations is within the procedural rules in both jurisdictions, is it the appropriate moral response to environmental contamination in Ecuador?
What adjustment would be applied to cogs : Total manufacturing overhead in COGS was $49,800. If an overhead misallocation of $17,000 was deemed material, what adjustment would be applied to COGS?
Provide bequest in jonathan will for the land to go to jill : Jonathan purchased land many years ago for $100,000, which is rented to tenant farmer. Provide a bequest in his will for the land to go to Jill after his death?
What must its projected cash disbursements be : If Whetzel Corporation. estimates an ending cash balance of $30,000 forNovember, what must its projected cash disbursements be?
Design a control strategy for the process : In some plants, incentives exist to supply heat to the process via one (or a few) large, efficient fired heaters. The energy is transferred to consumers.

Reviews

Write a Review

Operation Management Questions & Answers

  The final stage in a bicultural audit usually involves

The final stage in a bicultural audit usually involves:

  What is the free-market theory of corporate responsibility

What is the free-market theory of corporate responsibility? What are some of the problems associated with this view? Compare this view with the social contract and stakeholder perspectives of corporate social responsibility. What would be likely cons..

  Explain the essence of the break-even analysis

Explain the essence of the break-even analysis.

  Were the defendants constituional rights violated

Four separate cases involving similar fact situations were consolidated because-Were the defendant's constituional rights violated? Discuss

  Activity students will create oral research proposal

In this activity students will create an oral research proposal. A proposal is a formulated plan to suggest a way to solve a problem or address a situation.

  Show to recover damages from express delivery

Dixie, a driver for Express Delivery Company, leaves the truck's motor running in neutral and carelessly forgets to set the parking brake while she makes a delivery. The truck rolls and crashes into a nearby gas station pump, igniting a fire that spr..

  Advantage without implementation of strategic management

Is it possible to achieve competitive advantage without the implementation of strategic management? If yes, describe how and explain your rationale. If no, then explain why and provide at least one example. Your response should be at least 150 words ..

  What are diseconomies of scale

What are economies of scale in a manufacturing plant? Do they continue forever? What are diseconomies of scale? How might you decide the optimal size of a plant?

  What are advantages-disadvantages of her leadership style

What leadership concept best describes Swan’s leadership style? What are the advantages and disadvantages of her leadership style? What are Swan’s bases of power? Which are strongest; which are weakest? Identify AND describe two influence tactics tha..

  Discuss implementation activities that positively impacted

Discuss implementation activities that positively impacted customer satisfaction? Describe three advantages and three disadvantages of standardizing the marketing mix worldwide?

  What is the average utilization of each machine

Consider two machines that operate in parallel. Each machine processes jobs at a rate of 5 jobs per hour (i.e., µ = 5 jobs/hour). Jobs arrive to the machines at a rate of 8 jobs per hour (i.e., λ = 8 jobs/hour). What is the average utilization of eac..

  Would it influence the approach you would take

What value would it be to know that you were going to be training a class of persons between the ages of 20 to 35? Would it influence the approach you would take? How?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd