Reference no: EM13963020
1. A hospital is trying how many RN's to hire to provide the 24-hour-day coverage it needs on the floor. The hospital is concerned with both costs for wages of RN's hired and level of care provided. As a start to this process of hiring, a minimum number of RN's required for different times has been estimated and is shown below. The 24-hour day has been divided into 7 segments of length 2, 4, or 8 hours. The minimum number of RN's required differs by time of day due to many factors; the minimum numbers of RN's required for each of the seven time segments are:
Time minimum # RNs required
6 am - 10 am 30
10 am - noon 25
noon - 2 pm 28
2 pm - 4 pm 20
4 pm - 8 pm 22
8 pm - 10 pm 17
10 pm - 6 am 15
Though the economy in the region served by this hospital is weak, the region has the same nursing shortage the rest of the country has. The hospital is trying to compete by offering a set of work times that is flexible and competitive wages that include extra compensation for hours worked after 5:00 pm. There are five possible work schedules or shifts:
1) 8 hours from 6 am to 2 pm
2) 6 hours at 10 am to 4 pm
3) 8 hours at noon to 8 pm
4) 8 hours at 2 pm to 10 pm
5) 8 hours at 10 pm to 6 am
Usual wage, for hours worked between 6 am and 5 pm is $25 per hour. Work beginning at 5 pm through 10 pm is paid $30 per hour, and work between 10 pm and 6 am is paid $33 per hour. For example, an RN who works from 2 pm to 10 pm is paid 3 hours * $25/hour + 5 hours*$30/hr = $225 per day.
a. Formulate an algebraic linear programming model to find the minimum cost per day set of RN's to provide at least minimal coverage during the 24 hours.
b. Enter the parameters of your model into excel. Use excel solver to find the solution to your model. What are the solution and its total cost per day? Please include in your answer file your excel and Solver setup with the optimal solution, as instructed in the answer file instructions for question 26. What is the solution?
c. Which of the seven time segments are only minimally covered in your solution?
d. For each of the time segments indicated in part c (those that are only minimally covered), how much would total cost increase per unit increase of that segment's minimum number of RN's? Answer for each segment separately so that only one value changes at a time. For each answer, indicate by how much the minimum # can be increased (if it is the only one being changed) before the total increase in cost rate is no longer valid.
e. Do your answers in part d remain valid if the minimum number of RN's for all the time segments indicated in part c (those that are only minimally covered) are increased by 1 simultaneously? Please show work to justify and explain your answer. Hint: use 100% Rule.
f. Do your answers in part d remain valid if the minimum number of RN's for all seven of the time segments are increased by 1 simultaneously? Please show work to justify and explain your answer. Hint: use 100% Rule.
Objective function and the inequations of system
: Establish the objective function and the inequations of this system. Use x1; x2; x3 instead of P1; P2; P3. Create the system of equations and out of it a table for usage of the Simplex Method (just the table no evaluation!)
|
What is this distance in the laboratory frame
: The proper mean lifetime of subnuclear particles called pions is 2.6 × 10 ^-8 seconds. A beam of pions has a speed of 0.72 c in a laboratory. The speed of light is 2.998 × 10 ^8 m/s. In the reference frame of the pion, how far does the pion travel ..
|
Find the electric field at a point (0, +5x10^-10m)
: Consider a dipole where there is a charge of -6 uC at the point (2X10^-10 m,0) and a charge of +6 uC at the point (+2X10^-10 m,0).
|
What is total travel time of pulse as measured by observers
: The mirror is stationary with respect to S. A light pulse emitted by the rocket travels toward the mirror and is reflected back to the rocket. The front of the rocket is a distance 1.88 × 10 ^12 m from the mirror (as measured by observers in S) at..
|
Minimum numbers of rn required
: The 24-hour day has been divided into 7 segments of length 2, 4, or 8 hours. The minimum number of RN's required differs by time of day due to many factors; the minimum numbers of RN's required for each of the seven time segments are:
|
Compute the new capacitance, the potential difference
: The charging battery remains connected and the space between the plates is filled with a material of dielectric constant 5. Compute the new capacitance, the charge, the field strength and the energy stored.
|
Develop and implement a business plan
: Develop and implement a business plan - business plan for Qantas airlines and manage finances within Qantas airlines.
|
Explain why the traditional and activity based cost
: Using Exhibit 7-13 as a guide, prepare a quantitative comparison of the traditional and activity-based cost assignments. Explain why the traditional and activity-based cost assignmentsdiffer.
|
Derive an exact expression for the three dimensional
: Consider a dipole consisting of two charged particles on the x axis, one with positive charge q+ located at x=+1/2d and one with negative q- charge located at x=-1/2d
|