Operator Assignment

Oxford University maintains a powerful mainframe computer research use by its faculty, Ph.D. students, and research associates. During all working hours, an operator must be available to operate and maintain the computer, as well as to perform some programming services. Beryl Ingram, the director of the computer facility, oversees the operation.

It is now the beginning of the fall semester and Beryl is confronted with the problem of assigning different working hours to her operators. Because all the operators are currently enrolled in the university, they are available to work only a limited number of hours each day.

There are six operators (four undergraduate students and two graduate students). They all have different wage rates because of differences in their experience with computers and in their programming ability. The following table shows their wage rates, along with the maximum number of hours that each can work each day.

1968_Farmer Joness Planting Problem1.png

Each operator is guaranteed a certain minimum number of hours per week that will maintain an adequate knowledge of the operation. This level is set arbitrarily at 8 hours per week for the undergraduate students (KC, DH, HB, and SC) and 7 hours per week for the graduate students (KS and NK).

The computer facility is to be open for operation from 8am to 10pm Monday through Friday with exactly one operator on duty during these hours. Therefore, for each weekday, the total number of operator hours available should be exactly equal to 14 hours. On Saturdays and Sundays, the computer is to be operated by other stuff. It is assumed that operators can work their hours during any period of time in a given day (that is, for instance, Beryl decides to have KC work 6 hours on Monday and HB for 3.2 hours on Monday and SC for 4.8 hours on Monday, scheduling them is not of interest because they can work anytime during 8am-10pm on Monday given that their time is not exceeding their available time on Monday).

Because of a tight budget, Beryl has to minimize the total operating cost. She wishes to determine the number of hours she should assign to each operator on each day.

a) Mathematically formulate a linear programming model for this problem. Define decision variables, and then define your constraints and objective function accordingly. Combine everything to get the final model.

b) Formulate and solve this problem on a spreadsheet using Excel.

Reference no: EM13500718

Questions Cloud

What are the forbes plant''s three biggest problems in rank : What are the Forbes plant's three biggest problems in rank order? Are they interrelated or mostly independent? Discuss.
Calculate the angular momentum of the disc : A child of mass 50.0 kg stands 2.00 m from the center of a horizontal circular disc of radius 4.00 m and mass 200 kg. The disc is mounted on a frictionless, vertical axis. Calculate the angular momentum of the disc
Explain how to develop a scheme to separate ag+ and mg2+ : Develop a scheme to separate Ag+, Mg2+, and Pb2+ cations in solution and draw a flow chart that depicts your scheme.
Find to what distance should the camera be focused : You are 3.20 m from a plane mirror, holding a camera, and you want to take a photograph of your image in the mirror. find To what distance should the camera be focused
Minimize the total operating cost : formulate a linear programming model for this problem. Define decision variables, and then define your constraints and objective function accordingly. Combine everything to get the final model.
How can the lessons of operations management : How can the lessons of operations management be used to increase the efficiency and effectiveness of service delivery to the customer?
How the above matters should be treated : On 25 April 2010, the board of directors proposed a final dividend of €1 per ordinary share be paid for the year ended 31 March 2010, subject to approval at the shareholders' AGM.  The company had 2 million ordinary shares in issue at 31 March 201..
Explain how many moles of nh4cl must be added to solution : How many moles of NH4Cl must be added to 1.0 L of 1.0 M solution of NH3 to prepare a buffer solution with a pH of 9.00 ? of 9.50 ? Kb = 1.8 x 10 -5
Compute how much work must be done to move the satellite : A 769-kg satellite is in circular orbit around the Earth and moving at a speed of 1.11 km/s. How much work must be done to move the satellite

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd