Minimize the total cost of weekly steel pipe

Assignment Help Other Engineering
Reference no: EM13500712

Outsourcing Decisions

Suppose that you are the Manager of the Purchasing Department in a manufacturing company. Currently, you are trying to outsource one of the raw materials (a steel pipe) required for manufacturing your product. Specifically, you know that you need to purchase and ship exactly 5,000 units of steel pipe each week to the manufacturing plant. There are four possible suppliers that you can purchase and ship the steel pipes from. Each supplier has different purchase costs per unit of steel pipe and different shipping costs due to their distances. Furthermore, each supplier has limited weekly supply of steel pipes. The table below summarizes the following data:

- The distance of each supplier to the manufacturing plant (in miles)

- The purchase cost charged by each supplier per steel pipe ($ per unit of steel pipe)

- The weekly supply capacity of each supplier (units of steel pipe)

- The transportation cost charged by the supplier for shipping one unit of steel pipe per mile ($ per steel pipe per mile)

655_Farmer Joness Planting Problem.png

As the purchasing manager, you want to minimize the total cost of weekly steel pipe supply to the manufacturing plant, which includes weekly purchase costs and weekly transportation costs. To do so, you need to determine how many units of steel pipe to ship weekly from each supplier (assume that you can purchase and ship fractional number of steel pipes from the suppliers). While doing so, you need to consider the following:

- Weekly transportation cost should not exceed 80% of the total weekly cost

- Since suppliers 3 and 4 are closer to the manufacturing plant, you want the total steel pipes purchased and shipped weekly from suppliers 3 and 4 to be more than or equal the total steel pipes purchased and supplied weekly from suppliers 1 and 2

- Since you want to build good relations with your suppliers, you want to purchase and ship at least 250 units of steel pipe from each supplier each week

- You want to purchase and ship at least 2 units of steel pipe from supplier 1 for each unit of steel pipe you purchase and ship from supplier 4

In this problem, you are asked to formulate the above outsourcing problem mathematically as a linear model. To do so, define your decision variables, objective and express your objective function and constraints in terms of your decision variables, and combine everything to get the final formulation.

Reference no: EM13500712

Questions Cloud

How the above matters should be treated : On 25 April 2010, the board of directors proposed a final dividend of €1 per ordinary share be paid for the year ended 31 March 2010, subject to approval at the shareholders' AGM.  The company had 2 million ordinary shares in issue at 31 March 201..
Explain how many moles of nh4cl must be added to solution : How many moles of NH4Cl must be added to 1.0 L of 1.0 M solution of NH3 to prepare a buffer solution with a pH of 9.00 ? of 9.50 ? Kb = 1.8 x 10 -5
Compute how much work must be done to move the satellite : A 769-kg satellite is in circular orbit around the Earth and moving at a speed of 1.11 km/s. How much work must be done to move the satellite
Demonstrate an understanding of terms : 1. Demonstrate an understanding of terms and title transfer for the ownership of inventories or assets, and who pays for the freight under each term.
Minimize the total cost of weekly steel pipe : Purchase and ship at least 2 units of steel pipe from supplier 1 for each unit of steel pipe you purchase and ship from supplier 4
Describe the key features of each method : During the year to 30 September 2009, a production line was purchased for €250,000. However, the amount remained outstanding at the year end, and is included in the trade and other payables figure on the balance sheet. There were no other payables..
Evaluate the raduis of a cu atom in the fcc structure : Precision calipers were used to measure a face-centered unit cell of Cu. The dimension of the unit cell is 0.3616nm. Calculate the raduis of a Cu atom in the FCC structure.
A duvet : A duvet
Define potassium permaganate is standardized with iron metal : A solution of potassium permaganate is standardized with iron metal, a primary standard. The iron is dissolved in acid, reduced to Fe(II), and titrated with permanganate.

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd