Minimize the flow time of the assembly line

Assignment Help Operation Management
Reference no: EM13500593

Problem 1: Process Analysis

You manage an assembly line consisting of 6 work stations (referred to as Work Station 1, Work Station 2, ... , Work Station 6) in series, each manned by a single worker (Alex, Barbara, Chuck, Donna, Ed, and Fran). Each unit of product is processed first at Work Station 1, then at Work Station 2, and onward through the six work stations in numerical order. For reasons not completely understood, the amount of time required to complete the work at each work station depends on which worker is assigned to that station. The following table gives the number of minutes each worker requires to complete the tasks associated with each work station.

 

Workers

  Work Stations

1

2

3

4

5

  6

Alex

  10

  35

  41

  45

  15

23

Barbara

  33

  40

  24

  19

  49

13

  Chuck

  16

  20

  39

  32

  18

48

  Donna

  47

  12

  14

  26

  44

33

Ed

  25

  43

  37

  31

  27

21

  Fran

  50

  28

  22

  11

  38

42

Therefore, if Alex is assigned to Work Station 1, he will require a total of 10 minutes to complete the tasks at that work station for every unit of product. In contrast, he will require 45 minutes if assigned to Work Station 4. Similarly, Donna will require 47 minutes if assigned to Work Station 1, but only 12 minutes if assigned to Work Station 2. Clearly, one worker must be assigned to each work station, and these assignments are considered permanent for the foreseeable future.

Assume that the system is always busy (i.e., there is always demand for this product), and there is no transient state (so, e.g., workers can stop work on a unit of product at the end of a shift and resume work at precisely the same point the next day). Also assume that no inventory is allowed between work stations; instead, workers who complete their tasks faster than the bottleneck work station accumulate idle time.

a. To which work station should each worker be assigned in order to minimize the flow time of the assembly line? What is the associated flow time?

Alex _10____ Barbara 19_ Chuck 18_ Donna 12_ Ed _21 Fran _22

Flow Time (minutes)   _81

Reference no: EM13500593

Questions Cloud

What are the effective bandwidths of the two devices : a. What are the effective bandwidths of the two devices?
Estimate how fast is the river flowing : A boat takes 3.2 hours to travel 50 km down a river, then 4.6 hours to return. How fast is the river flowing
What is the expected return of the put option : Harbin Manufacturing has 10 million shares outstanding with a current share price of $20 per share. In one year, the share price is equally likely to be $30 or $18. The risk-free interest rate is 5%
With what speed does the laser beam approach the earth : A starship blasts past the earth at 2.0\times 10^8\;{\rm{ {\rm m}/{\rm s}}}. With what speed does the laser beam approach the earth
Minimize the flow time of the assembly line : which work station should each worker be assigned in order to minimize the flow time of the assembly line? What is the associated flow time?
Design an iir band stop butterworth filter : Design an IIR BAND STOP Butterworth filter with the following characteristic
How many rr and bb cones should be stocked : which work station should each worker be assigned in order to minimize the flow time of the assembly line?  What is the associated flow time - How many units of Product 1 and Product 2 should be ordered at a time in order to minimize total holding +..
Design a resistive circuit with 3 or 4 nodes : Design a resistive circuit with 3 or 4 nodes, or meshes that includes one 0.1μF capacitor.
How long does the journey take according to the cosmic ray : A cosmic ray travels 60 {\rm km} through the earth's atmosphere in 420 \mu s, as measured by experimenters on the ground

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade