A timber beam 6 in. wide by 12 in. deep is loaded and supported as shown below. The modulus of  elasticity of the timber is 1200 ksi. A pointer is attached to the right end of the beam. Determine the deflection of the right end of the pointer and the maximum deflection of the beam.

Reference no: EM1385381

Questions Cloud

Discuss the process you would apply to determine : Discuss the process you would apply to determine whether the procedure falls within the RN scope of practice and how you would go about introducing the new procedure with physicians and fellow nurses.
Find out the speed of the block : An ideal spring with a stiffness of 379N/m is attached to a wall, and its other end is attached to a block that has a mass of 16-kg. The spring/block system is then stretched away from the spring's relaxed position until 59J of mechanical potentia..
What is the optimal interval : What is Office Supreme's optimal ordering quantity and optimal associated cost? What is the optimal interval (in working days) between orders?
Compute the frequency of the dampened oscillation : The scale of a spring balance reading from 0 to 230 N has a length of 15.0cm. A fish hanging from the bottom of the spring oscillates vertically at a frequency of 2.40 Hz. What is the mass of the fish ignoring the mass of the spring.
Maximum deflection of the beam : Determine the deflection of the right end of the pointer and the maximum deflection of the beam.
Postmodern theory of urbanization : I am doing paper on the emerging theory of postmodern urbanization and how this theory differs from the traditional urban theory.
Calculate the change in the boxs kinetic energy : One average force F1 has a magnitude that is three times as large as that of another force F2. Both forces produce the similar impulse. The average force F1 acts for a time interval of 1.77ms. for what time interval does the average force F2 act.
Determine the level production rate if a level strategy : Determine the level production rate if a level strategy is selected with the goal of ending Period 4 with 100 units in inventory.
Explain a bloody fingerprint of the apparent victim : Use the Scientific technique, evaluate a crime scene to explain a bloody fingerprint of the apparent victim in one room and the body of the victim in a different room.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Elevation of the road at station

Given the following data for a vertical curve of a road; G1=-2.5%, G2=+5.5% and station of PVI=250+50.At station 252+50, the vertical curve must intersect an existing road at elevation 48.48ft. the elevation on the tangent section at station 256+5..

  Parabolic trajectory of the falling prey

A hawk flying at 2 m/s at an altitude of 45 m accidentally drops its prey. The parabolic trajectory of the falling prey is described by the equation below until it hits the ground, where y is its height above the ground and x is its horizontal dis..

  Problem related to aerial photograph

The distance covered by an aerial photograph is determined by both the focal length of the camera and the tilt of the camera. Although the tilt is usually small, both archaeological and Canadian photographs often use larger tilts.

  Determining the pumping rate

Determine the required pumping rate. the aquifer has T= 1600 m 2 /day and the wells each have radius of influence of 600m.

  Dimensions of symmetrical trapezoid plate

The plate is submerged in a liquid is a vertical position with the parallel sides horizontal and the shorter parallel side at the top and exactly in the surface of the liquid.

  Engineering ethics concepts and cases

Engineering ethics concepts and cases

  Ehermal conductivity of the radioactive wastes

The outer surface of the tank is cooled by air at 300 K with a heat transfer coefficient of 100 W/m2K. Determine the maximum temperature in the tank. Take the thermal conductivity of the wastes as 2.0 W/mK.

  Percent by weight of limestone

A slurry containing 20 percent by weight of limestone (CaCO 3 ) is processes to separate pure dry limestone from water. If feed rate is 2000kg/h, how much CaCO 3 is produced per hour?

  Comparative analysis of the types of safeguards

Provide a comparative analysis of the types of safeguards would you suggest for the company's information system.

  Perception-reaction time on a roadway

An engineering student is driving on a level roadway and sees a construction sign 180 m ahead in the middle of the roadway. The student strikes the sign at 56 kph. If the student was traveling at 90 kph when the sign was first spotted, what was th..

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Tightness of skid along with pump-motor

What is the solution if foundation bolt cut by some way from their bottom of skid, i mean skid base than how to keep another bolt etc for tightness of skid along with pump-motor already fittied with pipe and other fitting's too..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd