Mathematically determine the breakeven number of visitors

Assignment Help Civil Engineering
Reference no: EM13549243

Two new rides are being compared by a local amusement park in terms of their annual operating costs. The two rides are assumed to be able to generate the same level of revenue (and thus the focus on costs). The Tummy Tugger has fixed costs of $10,000 per year and variable costs of $2.50 per visitor. The Head Buzzer has fixed costs of $4000 per year, and variable costs of $4 per visitor. Provide answers to the following questions so the amusement park can make the needed comparison.

(a) Mathematically determine the breakeven number of visitors per year for the two rides to have equal annual costs.

(b) Develop a graph that illustrates the following: (Note: Put visitors per year on the horizontal axis and costs on the vertical axis.)

•Accurate total cost lines for the two alternatives (show line, slopes, and equations).

•The breakeven point for the two rides in terms of number of visitors.

•The ranges of visitors per year where each alternative is preferred.

Reference no: EM13549243

Questions Cloud

Determine the rate of return that the company will make : Five years ago, GSI, an oil services company headquartered in Texas, issued $10 million worth of 12% 30-year bond with the dividend payable quarterly.
What will be the time-mean speed and space-mean speed for : Assume you are an observer standing at a point along a three-lane roadway. All vehicles in lane 1 are travelling at 30 mi/h, all vehicles in lane 2 are travelling at 45 mi/h, and all vehicles in lane 3 are travelling at 60 mi/h. There is also a const..
Determine space mean speed : Data obtained from aerial photography showed six vehicles on a 600 ft long section of road. Traffic data collected at the same time indicated an average time headway of 4 sec. Determine the (a) density on the highway (b) flow on the road (c) space me..
How much energy is stored in an isolated spherical capacitor : How much energy is stored in an isolated spherical capacitor of radius ,R=25 cm, if it is charged to a potential of 5000V?
Mathematically determine the breakeven number of visitors : Two new rides are being compared by a local amusement park in terms of their annual operating costs. The two rides are assumed to be able to generate the same level of revenue (and thus the focus on costs). The Tummy Tugger has fixed costs of $10,000..
Draw a neat and clearly annotated sketch of the curve : Given the stationing in meters as (4+56) for the PC of a horizontal curve of radius R=1200 meters and angle I=22°. The azimuth of the line PC to PI as AzPC-PI = 155° 30'. A point P is to be located on the curve at stationing of 7+00. Do the following
Determine the required size of new schedule 40 steel pipe : Determine the required size of new Schedule 40 steel pipe to carry 0.5 cfs (Q = 0.5 cfs) of water at 160o F with a maximum pressure drop of 10 psi per 1,000 ft.
Write the matlab statements required to calculate and print : A belt is wrapped around a pulley for 180 degrees. The loose-side belt tension is 100 lb and the coefficient of static friction is 0.30. Calculate the maximum belt tension if motion is impending. Assume A) a flat belt and B) a V-belt with a groobe an..
What are the expected value and standard deviation : What are the expected value and standard deviation of the difference between morning and evening waiting times on any single day? E. What are the expected value and standard deviation of the difference between total morning waiting time and total eve..

Reviews

Write a Review

Civil Engineering Questions & Answers

  An open rectangular channel is 50 feet wide flowing at a

an open rectangular channel is 50 feet wide flowing at a depth of 5 feet and is carrying 1000 cubic feet per second.

  What is the estimated collection efficiency at 250degree f

Our ESP is collecting 95% of the particles in our exhaust stream. We are under pressure to improve its performance. It has been suggested that if we were to cool the inlet gas from the present 600°F to 250°F

  Determine how many buses needed to provide service on route

Determine how many buses needed to provide service on the following route with the indicated characteristics: -Route length: 16 miles (one way) -Headway: 15 minutes -Average number of stops made during run, one direction: 22

  Determine what is the concentration in lake water with ph

What is the concentration (M) of Al3+ in lake water with pH = 4 assuming the equilibrium below with excess Al(OH)3 (s) The reaction is Al(OH)3 (s) --> Al3+ + 3OH-. pKsp = 32.9.

  Find the flow rate that can be delivered in the tube

The water line to a house is usually 3'4" copper tube. Find the flow rate that can be delivered and still maintain laminar flow in the tube

  A file of student records contains name sex m or f age in

a file of student records contains name sex m or f age in years and marital status single or married for each student.

  Find concentration of acetone in river due to pulse release

The water velocity is estimated to be 3.0 m/sec. Acetone has a density of 0.786 gm/mL and a half-life in water of 20.0 hr. Determine the concentration of acetone in the river due to this pulse release at distance of 2, 4, and 7 km from the site at..

  Determine the final density of the gas-carbon dioxide

Carbon dioxide at 30 C and 320 kPa absolute pressure expands isothermally to an absolute pressure of 170 kPa. Determine the final density of the gas.

  Determine the angle theta which the 6-lb

uniform rod makes with the vertical during the roll, and (b) the speed of the roller after it moves 4 ft., starting from rest. The roller rolls without slipping, and the rod hangs vertically (theta = 0) when the system is at rest.

  Is the head loss too great for the design to work

The design parameters are: • Q = 65 m3/d, • Wetland area (A) = 0.23 hectares (2,300 m2) (including the safety factor), • Aspect ratio = 8:1 • Average water depth (d) = 0.5 m • Bed slope = 1% (0.01 m/m) Given that the Manning's resistance factor

  Maximum volume of treated wastewater

Roughly what is the maximum Volume of treated wastewater should you put in the bottle if you want to have at least 2.0mg/l of DO at the test (filling the rest of the bottle with the water

  How long did take for the rocket to reach that max height

At that time, there is no more fuel in the rocket engine and the rocket continues upwards in free fall (g=0 ft/sec/sec). (a) How high will the rocket reach before it begins to fall back to the campus

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd