Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A car manufacturer is considering one of two systems for its windshield assembly line.
The first is a robotic system that should save money due to a reduction in labor and materials costs. The robotic system will cost $400,000, and requires 1 full-time technician and 1 full-time material handler will be needed with this system. The full-time technician costs $60,000 per year and the material handler costs $52,000 per year. The expectation is to recover the cost of the robotic system over the first two years.
The second option is to select the manual system. The manual system requires 4 full-time material handlers at a cost of $52,000 each per year. If the manual system is selected, the company will incur additional costs of $0.50 per windshield installed.
Assume that only one windshield is installed per automobile.
1. How many automobiles are needed to be produced over the next two years to make the manufacturer indifferent economically between the two systems? Ignore the time value money and assume that the entire cost of the robotic system will be recovered during the first two years.
Explain why both internal and external factors should be stated in specific terms (that is, using numbers, percents, money ratios, and comparisons over time) to the extent possible.
Compare the costs of moving a traditional, paper-based performance management system to an online system in economic, technical, and human terms.
Identify a particular challenge that may apply to the industries your business operates and describe the disruption this challenge may bring.
Name four strategies for “reversing the brain drain” from the Off-Ramps and On-Ramps essay that you feel would be effective and explain why you think so.
A detailed feasibility study is an essential element in the process of diligently assessing any new health services business venture.
Why is it important for project managers to resist changes to the project baseline? Under what conditions would a project manager make changes to a baseline? when would a project manager not allow changes to a baseline?
Identify one organization that could be considered creative, based on definitions in Mastering Leadership.
Describe what you think would be an effective new business model for Dell, explaining the roles played in it by operations and financial, strategic
What is the significance of designing a production system that has "robust" behavior? Provide an example of both robust and non-robust performance.
Takeo Miura of Hitachi was quoted as saying: " We (Japan) are going to win and the industrial West is going to lose: there is nothing much you can do about it. because the reasons of your failure are within yourselves. Today´s environment is so compe..
Discuss the five principles that govern the arbitration of grievances under collective bargaining. What measures are utilized in non-union environments?
Your U.S. home town is considering building a new public airport in an effort to attract industry and jobs to the area. You have been hired as a consultant on the project. How can we prevent developers from building tall structures that could obstruc..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd