An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle. The saturation flow rate of the approach is 1500veh/h, total delay for the cycle is 5.78 vehicle-minutes, and at the end of the effective green therea re 2 vehicles left in the queue. Determine the arrival rate assuming that it is unchanged over the duration of the observation period assume d/d/1 queueing.
Compare the total reactor volume required for 90% removal of the same pollutant in a CSTR system that contains a single reactor against a system that contains three CSTR reactors of equal volume in series.
In year one, a pharmaceutical mixing tank had a market price of $120,000. It replaced an older smaller mixing tank that had a BV of $15,000.
Determine the factors of safety against sliding and against overturning, and also the soil pressure at the heel and toe. Assume hydrostatic uplift varies uniformly from full hydrostatic head at the heel of the dam to zero at the toe. consider 1m l..
Calculate the undrained shear strength at a depth of 120 ft below the mudline. Calculate the undrained shear strength at a depth of 120 ft below the mudline if the soil has an OCR of 2.5 .
The section of the plywood in the 3rd quadrant is sawed off and the resulting piece is then glued squarely over the 4th quadrant portion of the plywood with glue of negligible weight.What are the x- and y-coordinates of the resulting center of gra..
Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas
Include immediate and consolidation settlements, but ignore secondary compression. In your calculation, use three sublayers with thicknesses of 4 ft, 8 ft and 16 ft for the top, middle and bottom layers. Ignore any settlement caused by the dense s..
This material is related Geotechnical Engineering, please only answer if you are certain and sure of your answer. An undisturbed soil sample has a dry unit weight of 112 pcf with a specific gravity of solids equals to 2.68.
The company would like to distribute the songs between the two CDs such that the used space on each CD is about the same. Formulate the problem as an IP, and find the optimal solution.
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
A conical tube of length 8 m fixed vertically with its smaller end upwards. The velocity head and pressure head at upper ends are 1.27 m and 2.50 m respectively.
A direct shear test is performed on a saturated specimen of loose sand. A normal stress equal to 100 kPa is applied and a maximum shear stress of 75 kPa is measured in the shear test. Determine the principal stresses and the orientation of these p..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd