Management scientist software

Assignment Help Engineering Mathematics
Reference no: EM13962867

The Goliath Tool and Machine Shop produces a single product consisting of three sub-components that are assembled to form the product. The three components are manufactured in an operation involving two lathes and three presses. The production time for each machine for the three components is as follows:

Production Time (minutes)

 

Component 1

Component 2

Component 3

Lathe

10

8

6

Press

9

21

15

The shop splits the lathe workload evenly between the two lathes, and the press workload evenly among the three presses. Additionally, the firm wishes to produce quantities of components that will balance the daily loading among lathes and presses so that, on average, no machine is operated more than one hour per day longer than any other machine. Each machine is available for eight hours per day.  The shop wishes to produce the maximum quantity of assembled products each day, without partial assemblies (in-process inventories).

a. Formulate a linear programming model that can be used to determine the daily production schedule.

b. Determine the optimal production schedule using the Management Scientist software.

c. The production policies established by Goliath are relatively restrictive. If the company relaxed either its machine balancing requirement or its restriction on in-process inventory, determine which would have the greatest impact on production output. Determine the impact if both requirements were relaxed.

Reference no: EM13962867

Questions Cloud

What is the spot rate for the british pound : What is the spot rate for the British pound (GBP) on Wednesday in terms of the U.S. dollar (USD)? Or, from the U.S. perspective, what is the direct quote on pounds?)
Prepare the company planning budget for august : The company's planning budget for August is based on 58 cruises and 3,200 passengers.
Determine the floor space : Formulate a linear programming model that can be used to determine the floor space that should be devoted to each department in order to maximize profit contribution.
Calculate the work done needed to move a 1.5 micro c test : In the figure, find the magnitude and direction of the electric field at the points A, B, C and D.
Management scientist software : Formulate a linear programming model that can be used to determine the daily production schedule. Determine the optimal production schedule using the Management Scientist software.
Is the above variance report useful for evaluating : Is the above variance report useful for evaluating how well revenues and costs were controlled during May? Why or why not?
Determine the new optimal solution : Assume the overall utility of the current favorite cereal for children 1-4 is 70, and the overall utility of the current favorite cereal for children 5-7 is 80. Modify the linear programming model used to determine the product design that will max..
What is the electric field magnitude for points r>r : What is the total charge inside a shpere of radius 1 and center in the origin.
How a change in each sphere will affect : Explain, with examples, how a change in each sphere will affect each of the other three spheres.  Need 200 words

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  Prime number theorem

Dirichlet series

  Proof of bolzano-weierstrass to prove the intermediate value

Every convergent sequence contains either an increasing, or a decreasing subsequence.

  Antisymmetric relations

How many relations on A are both symmetric and antisymmetric?

  Distributed random variables

Daily Airlines fies from Amsterdam to London every day. The price of a ticket for this extremely popular flight route is $75. The aircraft has a passenger capacity of 150.

  Prepare a system of equations

How much money will Dave and Jane raise for charity

  Managing ashland multicomm services

This question is asking you to compare the likelihood of your getting 4 or more subscribers in a sample of 50 when the probability of a subscription has risen from 0.02 to 0.06.]  Talk about the comparison of probabilities in your explanation.

  Skew-symmetric matrices

Skew-symmetric matrices

  Type of taxes and rates in spokane wa

Describe the different type of taxes and their rates in Spokane WA.

  Stratified random sample

Suppose that in the four player game, the person who rolls the smallest number pays $5.00 to the person who rolls the largest number. Calculate each player's expected gain after one round.

  Find the probability density function

Find the probability density function.

  Develop a new linear programming for an aggregate production

Linear programming applied to Aggregate Production Planning of Flat Screen Monitor

  Discrete-time model for an economy

Discrete-time model for an economy

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd