Make an mrp for space age furniture company by using the

Assignment Help Operation Management
Reference no: EM13391129

Space Age Furniture Company The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products-the Saturn microwave stand and the Gemini TV stand-have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age's shop. Once set up and started, the lathe can run nearly unattended. How- ever, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been neces- sary to schedule frequent overtime for him in order to finish the necessary parts on time.

Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed's experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule

Week      1        2         3        4           5          6

Gemini    600    400     700     500     400     600

Saturn      300    400     400    600      300     300

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products.

Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies are produced using the same equip- ment. To minimize change over time, Space Age has decided that these subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassem- bly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory of part 3079, and there are no orders in process.

Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. When- ever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week

Respond to the following and include any Materials Requirement Planning (MRP) calculations:

  1. Develop an MRP for Space Age Furniture Company using the information in the case including the production of sub-assemblies in lot sizes of 1,000.
  2. The lot size of 1,000 for sub-assemblies has produced a lumpy demand for part 3079. Suggest ways for improvements over sub-assemblies in lot sizes of 1,000.
  3. Analyze the trade-off between overtime costs and inventory costs.
  4. Calculate a new MRP that improves the base MRP.
  5. Compare and contrast the types of production processing-job shop, batch, repetitive, or continuous-and determine which the primary mode of operation is and why.
  6. Describe ways that management can keep track of job status and location during production.
  7. Recommend any changes that might be beneficial to the company and/or add value for the customer.

Reference no: EM13391129

Questions Cloud

Find profit-maximizing price and quantity if seller sells : the individual demand for a slice of pizza is given by qd 6 - p. assume the marginal cost of a slice of pizza is
How is it that people working in their own self-interest : 1 john writes a memo to his employees. putting his thoughts onto paper is an example ofa.nbspnbsp
Determine the supply chain for your prospective : based on the organization you selected write an operational plan of 300-500 words that addresses the following
Estimate what would happen to volume of services and : you are the administrator for a medical practice. assume all of your practices patients are covered by insurance.
Make an mrp for space age furniture company by using the : space age furniture company the space age furniture company manufactures tables and cabinets to hold microwave ovens
How does n the number of firms in the market affect each : consider a monopolistically competitive market with n firms. each firms business opportunities are described by the
Company x is considering changing its capital structure in : company x is considering changing its capital structure in light of the tough business environment. currently company
The company operates deep mines as well as strip mines most : the company operates deep mines as well as strip mines. most of the coal mined is sold under contract with excess
Complete the table and find out the most efficient number : nbspthe time has come for you to go to college and move from your parents home. you are moving approximately 300 boxes

Reviews

Write a Review

Operation Management Questions & Answers

  Analyze the steps involved in the night audit

Analyze the steps involved in the night audit and make at least one recommendation for improving the process.

  What is the theoretical minimum number of workstations

what is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?

  Now suppose he says that if he is optimistic about success

Now suppose he says that if he is optimistic about the success of one project, he is likely to be optimistic about the others as well. For you simulation, this means that if on probability increases

  Relationship between perceptions, attitudes and behaviors

What are the relationships between perceptions, attitudes, behaviors, and job performance. Why are unions exploring new collaboration solutions in the face of economic/work adversity

  Design a normalized order management database

Design a normalized order management database with the requirements provided in the MS Excel worksheet.

  Computing the composite rating

A location analysis for Temponi Controls, a small manufacturer of parts for high-technology cable systems, has been narrowed down to 4 locations.

  Compare internal vs external recruiting

Compare internal vs external recruiting. When would you want to use each option? what are some advantages and disadvantages of each?

  Identifying the key alternative distribution channels

D-Magic is a new company that has developed a revolutionary 3D television. It uses a new technology that provides a much sharper and realistic 3D experience than their competitors.

  Compare and contrast the contingency and path goal

Compare and contrast the Contingency, Path-Goal, and Leader Member Exchange Theories. Describe the similarities and differences of each leadership theory.

  Analyze key elements of training and development geared

Analyze key elements of training and development geared toward improving the performance of the specific small business for which you are consulting.

  Compute mad and made for management''s technique

Compute MAD and MADE for management's technique, Do management's results outperform (ex have smaller MAD and MAPE than) a naive forecast?

  Determine the estimated loss

suppose that the specifications for a part (in inches) are 6.00 ± 0.15, and that the taguchi loss function is estimated to be l(x) = 6,500(x-t)(squared). determine the estimated loss if the quality characteristic under study takes on a value of 6...

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd