Reference no: EM132567312
Bolan Engineering limited produces Camp shaft for Millat Tractors limited. The standard production is 40 units per hour with a Base wage of Rs. 300 per hour for the payment of wages to their workers for their Camp shaft plant. The company employs 5 workers in Camp shaft plant.
Each worker worked 25 days @8 hours per day in the month of March, 2020.
The each worker produced the following actual production during the month of March, 2020:
Name of workers Actual Outputs
of each worker "Units"
Muhammad Hassan 8,800
Muhammad Tayab 8,600
Zafar Junaid 9,000
Muhammad Ayuab 8,000
Marium khalid 7,500
Required:
Question 1: A schedule showing total labor cost for each worker, labor cost per unit for each worker, and total labor cost for Camp shaft Plant in the month of March, 2020 , if Company uses 80% Time saved., i.e., 80% Bonus Plan.
Question 2: From the three popular methods of labor remunerations. i.e., time rate system, pieces rate system and incentive schemes, which system would you recommend to management of Bolan engineering limited as a Cost and Management accountant? Give in support of recommended system with proper justifications and advantages to management.
Describe the effect on individual learners
: An argument against the use of single-sex classrooms. Justify your position. Consider the effect on individual learners (educationally, psychologically).
|
Prepare the journal entries that cullumber should make
: The leased building has a cost of $4,500,000 and was purchased for cash on January 1, 2020. Prepare the journal entries that Cullumber should make in 2020
|
Define joint products and by-products
: Define joint products and by-products. Also give logical justification to treat any one of joint products as a By-product. Compute total cost and unit cost
|
Question in geometric optics
: Please answer the following parts of the question in geometric optics. Please show all your work, diagrams, labels, explain reasoning for all parts (a-d)
|
Make a schedule showing total labor cost for each worker
: Make A schedule showing total labor cost for each worker, labor cost per unit for each worker, and total labor cost for Camp shaft Plant in the month of March
|
Find the current flowing through zener
: If reverse saturation current Ix of a diode is 0.1µA at 25°C, find its current at VD=-5V using diode current equation - Find the current flowing through zener
|
Determine the economic order quantities
: Determine Safety stock maximum. Determine the Economic order quantities. Imtiaz Super Store sells Blue Band Margarines. Its annual demand is 108,500 units.
|
Write complete and systematic solutions
: Write COMPLETE and SYSTEMATIC solutions. Express all final answers in TWO decimal places. ENCLOSE all final answers in a BOX.
|
Create the cost of production report for department
: Create the Cost of Production Report for Department: 1 for the month of May, 2020, if company uses "Weighted Average costing system".
|