Major process flow structure

Assignment Help Operation Management
Reference no: EM13806407

1. Which of the following is considered a major process flow structure?

  • Lead Time
  • Fabrication
  • Lean Manufacturing
  • Project

2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?

  • Certification is sought by any firm assuming they pay annual dues.
  • 2nd Party - where a customer audits its supplier
  • 3rd Party - where a qualified national or international standards/certifying agency serves as an auditor
  • 1st Party - where a firm audits itself against ISO standards

3. Which of the following is ISO 14000 primarily concerned with?

  • Quality management
  • Time management
  • Continuous improvement management
  • Environmental management

4. Which is the one correct value stream principle?

  • Look for efficiencies in the factory, office, physical, procedural, and technical operations.
  • Eliminate waste that stops, slows down, or diverts the value stream.
  • Concentrate on speeding up value-adding operations rather than removing waste.
  • Keep the value stream moving at minimum velocity.

5. What is the starting point in developing a capacity plan for a health care operation?

  • Determining the effective capacity over time
  • Estimating design capacity
  • Forecasting patient demand for a reasonable length of time
  • Discovery of the bottleneck operation

6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?

  • MRP (Material Requirements Plan)
  • ERP (Enterprise Resource Planning)
  • MPS (Master Production Schedule)
  • WBS (Work Breakdown Structure)

7. Which of the following is an element that addresses elimination of waste under lean production?

  • Kanban production control system
  • Production ahead of demand
  • Minimized run times
  • Group plant loading technology

8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?

  • Level elements
  • Future elements
  • Past elements
  • Cyclical elements

9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:

  • Reducing product quality during the assembly process
  • Designing products so they can be manufactured by a virtual factory
  • Reducing equipment in the production process
  • Simplification of the product by reducing the number of separate parts

10. Which of the following is one of the principles of reengineering?

  • Quality at the source
  • Do not select suppliers on the basis of price alone.
  • Have those who use the output of a process perform the process.
  • Leverage high cost employees with lower cost employees.

11. Which of the following is a characteristic that can be used to guide the design of service systems?

  • Services are all similar.
  • Services businesses are inherently entrepreneurial.
  • Quality work means quality service.
  • Services cannot be inventoried.

12. Considering Hau Lee's uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products?

  • Risk hedging
  • Forward looking
  • Efficient
  • Agile

13. There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T's used to classify poka-yokes?

  • Trust
  • Teamwork
  • Task
  • Time

14. Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?

  • The service package has the same legal protection available to manufactured goods.
  • Manufacturing is far more capital intensive than services.
  • The service process and service product can be developed independently.
  • The service package is the major output of the development process.

15. A project can be segmented into which of the following? 

  • Events
  • Sub-jobs
  • Work packages
  • Success markers

16. Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?

  • Statistical tools
  • Decision trees
  • Work sampling
  • Gap analysis

17. According to the theory of constraints, which of the following can be a capacity-constrained resource (CCR)?

  • Product design
  • Inoperable equipment
  • An employee
  • A customer

18. The ability to rapidly and inexpensively switch production from one product to another enables which of the following:

  • Economies of shape
  • Economies of size
  • Economies of scale
  • Economies of scope

19. According to the theory of constraints, which of the following financial measurements can be used to measure the firm's ability to make money?

  • Operating expenses
  • Dividends
  • Sales
  • Return on investment

20. Deming's PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?

  • Continuous improvement
  • Control charting
  • Standard deviation
  • Project management

21. Which of the following is usually included as an inventory holding cost?

  • Order placing
  • Quantity discounts
  • Breakage
  • Typing up an order

22. Which production process term best describes the situation when activities in a stage of production must stop because there is no work?

  • Blocking
  • Starving
  • Staging
  • Buffering

23. In a Gantt chart the vertical axis represents which of the following?

  • Time
  • Revenue
  • Tasks
  • Cost

24. The Shingo system states that the way to prevent defects from coming out at the end of a process is to do which of the following:

  • Redesign the process in order to mitigate the bottlenecks.
  • Utilize SQC (statistical quality control).
  • Introduce controls within the process.
  • Slow down production rates until the process is in control.

25. Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?

  • Flow time
  • Build time
  • Cycle time
  • Run time

26. Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for optimized production technology?

  • An hour saved at a bottleneck operation does not increase the process flow.
  • If you lose an hour at a bottleneck it is better than making scrap.
  • Do not allow bottlenecks to govern the flow of the line.
  • Utilization and activation of a resource are not the same.

27. During the implementation of a project, which of the following should be the primary focus of a consulting firm?

  • The correct project software
  • Application of the learning curve theory
  • Tools and materials availability
  • People management skills

28. Which of the following is an analytical tool used in Six-Sigma quality improvement programs?

  • Gantt charts
  • Pareto charts
  • Tree charts
  • Pedigree charts

29. A project manager must consider several components when overseeing the planning process of aggregate operations; specifically, whether such components are factors that are internal or external to the organization. Which of the following factors would be classified as an internal component for an organization?

  • Inventory levels and economic conditions
  • Market demand and subcontractor capacity
  • Current physical capacity and current workforce
  • Competitor behavior and current workforce

30. Which of the following is the net requirement using an MRP program if the gross requirement is 10,000 and the inventory on hand is 4,000?

  • 10,000
  • 14,000
  • 6,000
  • 4,000

Reference no: EM13806407

Questions Cloud

Evaluation of a member : Please complete an evaluation of a member of your team based on the Goals established during class.
Explain the dramaturgical approach : Explain the dramaturgical approach
Write paper on article the singer solution to world poverty : Write an analysis paper about the article The Singer Solution To World Poverty" by Peter Singer.
The necessary statistical analysis as a part of the assignm : In approximately 1500 words answer the following question examine the proposition that there exists a correlation between the amount of gross fixed capital formulation and the rate of economic growth , explain the significance of your result (Please ..
Major process flow structure : 1. Which of the following is considered a major process flow structure?
Explain what happens to price and quantity of milk : Explain what happens to price and quantity of milk when the following events occur (you do not need to analyze the event itself but rather determine the effect of the event on supply and demand of milk):A scientific study shows that consumption of mi..
Research in careers brochure : Research in Careers Brochure
How role of money and marriage affect novel sensibility : Is the author presenting a clear-cut preference for sense over sensibility? Explain. How does the role of money and marriage affect the novel Sense and Sensibility?
The sample standard deviation for cell phone users : On the basis of the results in (a), which t test defined should you use to compare the means of the two groups of cell phone users? Discuss.

Reviews

Write a Review

Operation Management Questions & Answers

  In this condition lionel must have an ability to in

lionel tucker has been asked to lead a virtual team on a project with a tight time schedule. while allocating the

  How does bakers performance compare to arrow distrubuting

how does bakers performance compare to Arrow distrubuting?

  Explain the difference between mission and vision statement

Explain the difference between a mission and vision statement. Discuss why mission statements are important in performance improvement and why a solid mission statement (describing your goals) should be in place.

  Describe main subject areas the uaw can negotiate with ford

The United Auto Workers union enters into contract negotiations with the Ford Motor Company in Michigan. What are the three main subject areas the UAW can negotiate with Ford?

  What is the maximum acceptable price for the type y filter

The proposed filter (Type Y) has to be replaced every 5,000 miles (along with 5 quarts of oil) but does not require any additional oil between filter changes. If the oil costs $1.08 per quarts, what is the maximum acceptable price for the Type Y f..

  Identify and describe key concepts of emerging technologies

you have been asked to create a powerpoint presentation to train a group of new employees for future trends financial

  Team leader under your supervision has made a mistake

You're a manager in Japan, and you've just discovered that a team leader under your supervision has made a mistake that will result in a quality problem. How will you handle this mistake?

  The key organizational behavior issues evident in the case

Identification and summary of the key organizational behavior issues evident in the case. Reflection on the identified issues along with recommendations or potential solutions to identified issues

  Best ways risk compliance strategies assist firms

Indentify the 5 major components of scope planning in a WBS process and outline how risk management is then integrated during the cartooning of the means and methods.

  Steady-state probabilities-transition matrix algebrically

A city is served by two newspapers the Tribune and the Daily News. Each Sunday reader purchases one of the newspapers at a stand. The following transition matrix contains the probabilities of a customer’s buying a particular newspaper in a week, give..

  What is the reorder point equal to

Given that unit cost = $25, annual carrying charge = 10%, annual demand = 4000 units and ordering cost = $15 per order. Assume that there are 50 weeks in the work year and 5 working days per week. The lead-time for the product is 2 weeks.

  Understanding yourself

Analyze three ways in which your personality attributes, gender, and communication style influence the way you prepare for and perform in negotiations. Provide support for your assertions with examples.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd