Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Consider a production system consisting of 2 resources M1 and M2. These resources are used to manufacture two different products A and B. Product A requires a standard time of 4 minutes on resource M1 and 3 minutes on resource M2. Product B requires a standard time of 2 minutes on resource M1 and 8 minutes on resource M2.
Assume that the resources are operated for 8 hours per day and that each resource requires a setup time of half an hour every day.
a. Assume that the daily demand for A is 90 units and the daily demand for B is 60 units. Can the daily demand be met by the current resources?
b. Assume that the firm would like to maximize its flow rate while maintaining a daily production mix of 3A's for 2B's. What is the bottleneck resource? What is the maximum flow rate?
c. What would be the flow rate if the capacity of resource 2 were doubled?
Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.
This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.
This assignment has questions related to probabiltiy.
Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.
Derive the Boolean Expression and construct the switching circuit for the truth table stated
Evaluate which equations are under-identified, just-identified, and over-identified.
Linear programming problem consisting of only two constraints with one objective function.
Find the natural domain of the given functions.
Compute the coecients of the polynomials using the term recurrence relation.
De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.
Questions related on mathematics in computing.
Complex problems
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd