M32064 Manufacturing System Design Assignment

Assignment Help Other Subject
Reference no: EM132770335

M32064 Manufacturing System Design - University of Portsmouth

Aims of this work

1. To develop a systematic understanding and critical awareness of sustainable manufacturing systems, system design approaches and planning techniques applied to industry.
2. To enhance the acquisition of analytical knowledge and practical skills gained for analysing a complex manufacturing process or system and their integration using advanced computer design and modelling simulation tools.
3. To explore modelling simulation techniques to help create rapidly and turn innovative ideas timely into systems design, analysis and improvement particularly for a constraint-based production system in a virtual environment.
4. To become an expert in coping with the system uncertainty, examining the system random behaviour, refining the system design, and developing alternative operational management strategies based on the developed virtual prototyping system to a real industrial case study.

Learning outcome 1: Critically appraise a systematic approach with lean thinking and apply it into analysis, planning, design and performance evaluation of a complex production system.

Learning outcome 2: Examine modelling techniques and mathematical approaches for capturing the deterministic and stochastic behaviours of manufacturing and prototyping systems

Assessment strategies
The overall assessment strategy is designed to test problem solving capabilities through a case study in a virtual environment using computer-aided design and modelling simulation tools to satisfy LO1 and LO2, with solutions developed and submitted in a report. Each student is expected to develop their own computer models, which will be checked and questioned by the supervisor as part of the overall assessment.

1) Introduction/Background (refers to page 2-3 and your own research work)
2) Main work (refers to page 3-4)
3) Discussions and conclusions References (if applicable) Appendix (if applicable)

Assignment

Background

In order to be competitive, modern products must be designed with a view to production methods in which a production system should to be designed in a cost-effective way and the system is able to operate at optimal or near-optimal conditions. Nevertheless, design of a production system can be a complex process and any small change of the system design often makes a significant impact on the overall system performance. In the real-world industry, implementation of the entire production system is often very expensive and the cost of ‘getting it wrong' can be very high. For these reasons, both system and product designers need to work together to ensure a ‘right first time' scenario. Virtual prototyping techniques offer a potential solution to the major difficulties involved in design, analysis and performance evaluation of a product and a production system providing a fast delivery of alternative solutions at a minimum of cost. Nowadays, virtual prototyping techniques are commonly used in manufacturing sectors involving some form of computer-aided design and modelling simulation activities.

Assignment & Tasks

This assignment is based on a case study of assembling loudspeakers on a production line that needs to be investigated. A loudspeaker manufacturer has just upgraded its loudspeaker design by incorporating some forged parts with improved magnetic characteristics for the unit, which has additional benefits of reduced part count and part features to facilitate automatic feeding as well as ease of manual assembly. Figure 1 shows the basic structure of a loudspeaker and Figure 2 illustrates what is known as the motor unit assembly together with the voice coil. Figure 3 shows a cross-section through a typical loudspeaker. The assembly of an entire loudspeaker is illustrated in Figure 4 and 5, respectively. The parts in the whole assembly can be grouped into two different types namely:
1. "Soft" parts:
• dust cap, the diaphragm, the spider and the coil
2. "Hards" parts (These are all in the ‘motor unit' sub-assembly)
• pole piece, the magnet and the top plate together with the frame

The proposed manufacturing facilities should as far as possible incorporate automation, however, it is still anticipated that some of the ‘soft' parts may be assembled manually. The aim is to produce one loudspeaker every 20s over an 8hr working day and a 5-day week (1440 units/day, 7200 units/week). The speakers can be sold at £5/unit, giving a potential turnover of £36000/week and £1800000/year.
After an initial investigation of the system, data collection and analysis, the following system parameters have been identified and determined:

• Conveyors will be used and it may be 5, 10, 15 or 20 m long.
• Each frame arrives randomly and is loaded in position (manually) in NegExp 18s.
• Each pole plate can be fed/assembled in LogNormal 17s, STD: 5-15%.
• The magnet can be fed/assembled in LogNormal 19s, STD: 5-15%.
• The top plate can be fed/assembled between 15-18s in a uniform distribution.
• Manual assembly of the spider and coil by a worker takes a time of 35-45s in a uniform distribution.
• Assembly of the diaphragm takes an average time of 18s.
• Manual assembly of the dust cap takes an average time of 16s.
• At the magnetisation station: 20s.
• At the automated test machine (ATM): 10s.
• Fork-lift trucks may be used at the end of the production line and it may travel at 2m/s.

In addition, the following system elements, operational activities and relevant information are suggested below:

1. Each finished loudspeaker will be individually bagged by a worker (s) after the ATM (automated test machine). A robot might be used to pack the finish products into a container. Each container should hold 36 loudspeakers and filled containers should be stacked and wrapped together in groups of 4 before being taken away by a fork-lift truck (s) to the warehouse.

2. Feeders/hoppers can be replenished automatically inside/outside the normal working hours (you decide this). This process involves unpacking parts manually and placing them on a single long conveyor that runs to a centrally located robot which can intelligently pick up correct parts and place these parts on short conveyors running to each feeder. The robot can run with a cycle time of 1.2s. Each worker can place individual parts on the conveyor in NegExp 4s; it needs to keep the number of workers to a minimum. The operating time of this conveyor must also be kept to a minimum since it involves the additional cost of overtime and/or part-time workers.

3. Fully assembled loudspeakers are passed through an automated test machine (ATM) where 1% of inspected units do not comply with specifications and are removed for rework - rework is not part of the study.

4. An eco-friendly and safe shop floor/workshop design is encouraged.

TASK

You should attempt to complete the following tasks:

1. Provide a background/knowledge of the loudspeaker-related product and production through a literature study.

2. Create a process plan for assembly of a loudspeaker using ‘pre-manufactured components'. Suggest suitable assembly sequences that would benefit from automated and/or manual operational processes.

3. Produce a drawing incorporating your proposed facility layout design based on the logic sequences of assembly within a boundary (with assumptions in Note) and justify your design by considering such as space utilisation; ease of operations and services; reduction of temporary storage areas or buffer zones, transport/human operator motions; safety; costs etc.

4. Build a full system model using Enterprise Dynamics (ED) software by incorporating 3D objects (if applicable) and all the necessary statistical values; test and verify the functionality of the developed ED models.

5. Design and run suitable experiments with the developed ED models; collect, analyse and interpret the generated simulation data including graphical simulation results to be presented in the report.

6. Evaluate system performance making any improvement that would be most beneficial to the system design and explain why you consider these changes, which may be advantageous.

Attachment:- Manufacturing System Design.rar

Verified Expert

The solution is based on description, design and implementation of a Loud SPeaker system. The Loud Speaker comprises different components and these can be simulated on the Dynamics Enterprise Software. We have done a thorough analysis on the Loud Speaker including the Assembly process. At last we performed the simulation of the loud speaker and made an evaluation on it.

Reference no: EM132770335

Questions Cloud

Why do we need an automated tool for sql injection : Write an essay discussing sqlmap, an automated tool for sql injection and database takeover in 500 words or more. Why do we need an automated tool.
Implications of the efficient market hypothesis : What are the implications of the efficient market hypothesis?
What are the projected total operating assets : Assuming no change in operations from this year to next year, what are the projected total operating assets? Do not round intermediate calculations.
Implicit interest rates for project : Should the equipment be bought or rented based on NPV? What are the implicit interest rates for this project?
M32064 Manufacturing System Design Assignment : M32064 Manufacturing System Design Assignment Help and Solution, University of Portsmouth - Assessment Writing Service
Can culture be seen as a constraint on leadership : Discuss what power in the context of leadership is and how it relates to bullying within organizations. Also note how this impacts productivity.
Find what is the yield to maturity on the? bond : What is the yield to maturity on this? bond? Should you purchase the bond if the yield to maturity on a? comparable-risk bond is 5 ?percent?
Which case study in the paper was most interesting to you : Which case study in the paper was most interesting to you and why? Do you think that ERM is necessary in the contemporary organization and why?
Find what should be overall effect on the company monthly : Sales incentive would increase monthly sales by 400 units. What should be the overall effect on the company's monthly net operating income of this change?

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd