Lowest ratio mixed assembly planningfor that mixture what

Assignment Help Project Management
Reference no: EM13363654

Lowest Ratio Mixed Assembly Planning

For that mixture what is the lowest ratio mixed model assembly sequence?

In September 1981, a Japanese management team replaces the American plant manager at the Kawasaki motorcycle plant in Lincoln, Nebraska. One goal of the new managers was to convert the main motorcycle assembly line to mixed model production. The line had been running production lots of at least 200 of each model between line changeovers.

The conversion was expected to take about three months. It required two kinds of exacting preparation:

1. Identification: All parts, tools, cartons, racks, and so forth, had to he clearly labeled so that an assembler would be able instantaneously to identify and select the right one. With a different motorcycle model next on the conveyor, delay in identifying it and all of the parts and tools to go with it would be intolerable. A color-coding system was devised so that, for example, all items related to a KZ6SO motorcycle would he labeled with a gummed red dot. Even the position of the colored dot on the carton, part, or tool had to be precisely designed.

2. Placement. Engineers, material controllers, foremen, and assemblers all pitched in to devise exact locations for all parts and tools at work stations along the assembly line. The assembler, on seeing what the next model of motorcycle is, should be able to reach for the correct parts and tools blindfolded. Better racks, containers, and holding fixtures were designed to feed parts and hold tools in the right positions.

The preparations (which today we would refer to as preautomation) were successful. On January 1, 1983, the main assembly line fully converted to mixed-model production.

At that time, the production volume was at about 200 motorcycles per day. That 200 might consist of the following models: 101) KZ44Os, 60 KZ65Os, and 40 KZ1000s.

Reference no: EM13363654

Questions Cloud

End-of-period push and channel-stuffingsuch demand : end-of-period push and channel-stuffingsuch demand phenomena as the end-of-period push and channel-stuffinga. are
Materials requirements planning mrp systems are : materials requirements planning mrp systems are advantageous in that theya - provide for purchasing most component
Planned order releasewhen should planned order releases : planned order releasewhen should planned order releases take place for the material requirements planning mrp data
Master schedulinggrade a architects inc has a happy problem : master schedulinggrade a architects inc has a happy problem too much business. its master scheduling team sales finance
Lowest ratio mixed assembly planningfor that mixture what : lowest ratio mixed assembly planningfor that mixture what is the lowest ratio mixed model assembly sequence?in
Choose an organization in which you analyze the : choose an organization in which you analyze the relationships among organizational culture project structure and
Pokayoke systemfail safing or pokayoke carries with it an : pokayoke systemfail safing or pokayoke carries with it an altered view of people and their performancea - humans are
Mixed model sequencea production line assembles 2 models of : mixed model sequencea production line assembles 2 models of hair dryer standard s and deluxe d. each s requires 4
Assessing and regulating healthcareyou are being asked to : assessing and regulating healthcareyou are being asked to consider quality of care and performance measures.1. what is

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd