Locate the existing building confirmation

Assignment Help Civil Engineering
Reference no: EM133183473

Determine Fire Protection Requirements

Secure Access to Existing Buildings

This task requires you to secure access to existing buildings for you to inspect. Specifically, you are required to:
• Secure access to at least one existing class 2, 3, or 9 building
• Secure access to at least one existing class 5, 6, 7, or 8 building
The buildings whose access are secured in this task will be used in future tasks.
Steps to take:
1. Locate the Existing Building Confirmation form provided for you on the following pages.
The Existing Building Confirmation form will be used to confirm the buildings you will be accessing whose fire protection requirements you will be inspecting.
Review the instructions here and in the Existing Building Confirmation form with your supervisor before starting so you can prepare for the tasks.
2. Seek assistance from your supervisor to do the following:
i. Secure access to three buildings, at least one of each must be:
a. A Class 2, 3, or 9 building, and
b. A Class 5, 6, 7, or 8 building
You will need access to these three buildings so that you can assess each building's compliance with the fire protection requirements in your state or territory, which will be done in Task 3.2.
All three buildings must be a Class 2, 3, or 9 building and a Class 5, 6, 7, or
8 building.
ii. Schedule a visit to the identified buildings.
3. Visit each building to take a picture of the exterior of each building.
The exterior must include the building's entrance.
4. Using the Existing Building Confirmation form, document the following information:
i. The classification of each building
ii. One picture of the exterior of each building

5. Have your supervisor review your completed Existing Building Confirmation form. Your supervisor must also complete and sign the Supervisor Declaration at the end of the form. Their signature must be handwritten.

Reference no: EM133183473

Questions Cloud

Find report for retained earnings : Kelty Company's year-end financial statements reported the following (in millions):
What could be the effect on the loan amount to be borrowed : Holding the interest rate constant and increasing the amortization period of the loan, what could be the effect on the loan amount to be borrowed by Christina
Explain the differences between the PV and the NPV : Evaluate the factors that you should consider in your investment decision. Explain the differences between the PV and the NPV
Calculate a breakeven point : Marie is now launching her own business called, "Brand You", a small boutique logo and marketing company that can help small businesses with their marketing.
Locate the existing building confirmation : The Existing Building Confirmation form will be used to confirm the buildings you will be accessing whose fire protection requirements you will be inspecting
Explain entry-exit theory : Nissan built its factory in Indonesia at the beginning of the New Order period. However, in the early 1990s, Nissan moved its factories from Indonesia to other
Identify the transaction-related audit objective : Identify the transaction-related audit objective(s) and discuss an audit test that could discover misstatements if the controls do not work effectively
How materials and products used in the building project : Identify any one product and one material from each building project plan. The products and materials between the building project plans must be different
What is the inventory turnover period for Sphinx : Sphinx Ltd has provided the following information for the year ended 30 June 2015. What is the inventory turnover period for Sphinx in 2015

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd