Reference no: EM131275695
A small manufacturing plant is considering their aggregate plan for the next fiscal year. They are limited to a maximum number of 32 FTEs each quarter. Their forecasted demand for next year is: Quarter 1 2 3 4 Demand 12000 14200 15400 13200 They do not consider hiring or firing costs but have the following production parameters.
Labor Standard = 1.3 hours/item
Regular Time Labor Cost = $22/hour
Beginning Annual Inventory Level = 1000
Ending Annual Inventory Level = 1000 Unit
Inventory Carrying Cost = $4/item/quarter
Any overtime labor in a quarter is time and a half. (Assume 40 hours/week, 52 weeks/year, and 4 quarters/year.)
1. For next fiscal year, find their annual regular time direct labor cost and overtime direct labor cost for a level capacity aggregate planning strategy.
2. For next fiscal year, find their annual regular time direct labor cost and overtime direct labor cost for a chase demand aggregate planning strategy.
What will the average total cost be to complete third order
: Atkinson Research Association (ARA) had received a contract to produce five units of new cruise missile guidance control. The first unit took 9000 hours to complete and cost $425000 in materials and equipment usage. What will the total cost to build ..
|
Hired to lead a project
: You have been hired to lead a project (the project of your choice). As the project manager, you know it is important to get the project off to a good start. Using the tools provided in the required readings, provide a quick summary of your project, i..
|
Employers exclude older employees from safety-sensitive jobs
: May employers exclude older employees from safety-sensitive jobs based on assumptions about health status? Explain. Non-medical tests used for making employment selection decisions must be scored in some way. Discuss the various legal and illegal met..
|
What methodologies and metrics
: You are evaluating a relocation project for a manufacturing company that is deciding if it will move operations another U.S. state, Mexico, or Canada. What risks need to be considered and will factor into your decision? What methodologies and metrics..
|
Labor cost for level capacity aggregate planning strategy
: A small manufacturing plant is considering their aggregate plan for the next fiscal year. They are limited to a maximum number of 32 FTEs each quarter. For next fiscal year, find their annual regular time direct labor cost and overtime direct labor c..
|
Discuss and summarize the affordable care act
: Discuss and summarize the Affordable Care Act of 2010 (ACA) by including mention of all these terms:
|
Integrated marketing communication strategy
: What is Apple's integrated marketing communication (Promotion) Strategy?
|
Levels of flexibility inherent in their design
: The PMLC models (TPM, APM, MPx, xPM) have levels of flexibility inherent in their design. Projects change and PMs need to adapt to these changes. In this chapter the author is showing how a TPM project is already rigid and without flexibility by desi..
|
What functions do perceptual positioning maps serve
: What is a 3PL provider (give an example) and what role does one play in the movement of goods? What is product position? What functions do perceptual positioning maps serve? Give an example of a time when you encountered bias, or overcame your own.
|