Consider the classical power system discussed in the lectures where one generator is connected to the infinite bus through two transmission lines. We want to study the transient stability for a fault on one of the two lines. The generator parameters are as follows: Pm = 1. H = 6. KD = 5. x'd = 0.25, E' = 1.5 The transmission line where the fault occurs has a line reactance of 0.7 pm The other transmission line that remains in service has a line reactance of 0.8 pu.
a) Suppose the fault occurs at the middle of the line. Mite out the swing equations for the pre-fault, fault-on and post-fault systems.
b) Suppose the clearing time is stated as 4 cycles. Use the Euler algorithm with a step size of one millisecond to compute the trajectory during the fault-on period and compute the clearing state. Carry out the Euler algorithm for 20 seconds into the post-fault period assuming an integration step size of one millisecond. Is the system transient stable or not'?
c) Repeat Part b) after changing the fault clearing time to be 5 cycles. Is the system transient stable? Repeat the study by increasing the clearing time in steps of one cycle. The largest value of the clearing time when the system is still transient stable is known as the critical clearing time. Keep repeating the simulation while increasing the clearing time by one cycle at a time till the system becomes transient unstable. What is the critical clearing time?
d) Apply the equal area criterion to check for the transient stability of the system for part (a) the instantaneous clearing case.
The paper includes Lithium ion battery technology with its advantages and disadvantages. The paper discusses about the Lithium air battery in which detailed reactions of Lithium with air including nonaqueous as well as aqueous are given.
Construction of different types of power transformer, significant energy savings
This document is shown a paper on Orthogonal frequency-division multiplexing with advantages, disadvantages and uses.
This assignment contains electronics engineering questions like State the commonly found components of a SCADA (Supervisory control and data acquisition) system. and decribe the function of the HMI in a SCADA system.
Prepare an Excel graph showing the individual components and summated resultant waveform of the odd harmonic series resulting in an approximate square wave.
Explain the function of the HMI in a SCADA system.
Design a 2-digit 24 second "shot-clock" countdown timer with pushbutton controller.
To understand dierent signal models To be able to model a discrete-time system and design simple signal processing algorithms.
Draw a relay construction diagram and briefly explain the operation of a relay.
Write a short technical report on Frequency Division Multiplexing
Briefly discuss the impact of electron energy, electron current and target on the Bremsstrahlung generated.
The schematic of the traffic light controller
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd