Two towns, located directly across from each other, operate municipal wastewater treatment plants situated along a river. The river flow is 50 million gal. per day (50 MGD). Coliform counts are used as a measure to determine a water%u2019s ability to transmit disease to humans. The coliform count in the river upstream of the two treatment plants is 3 coliforms/100 mL. Town 1 discharges 3 MGD of wastewater with a coliform count of 50 coliforms/100 mL, and town 2 discharges 10 MGD of wastewater with a coliform count of 20 coliforms/100 mL. Assume the state requires the downstream coliform count not exceed 5 coliforms/100 mL.

a) Is the state water-quality standard being met downstream? (Assume coliforms do not die by the time they are measured downstream.)

b) If the state standard downstream is not met, the state has informed town 1 that it must treat its sewage further so the downstream standard is met. Use a mass balance approach to show that the state's request is unfeasible.

Reference no: EM13307514

Questions Cloud

Write a segment of java code that will rotate the elements : Write a segment of Java code that will rotate the elements of an array by one position, moving the initial element to the end, like.
What is the speed of light in diamond : Light is refracted through diamond from air. If the angle of incidence is 30 °, what is the speed of light in diamond
What is the equivalent concentration at temperature : The concentration of CO2 is 400ppm what is the equivalent concentration in ug/m^3 at temperature of 22C & pressure of 103.198 kPa.
What is the mass of the clas : a 5kg Potter's wheel (model as a disk) with radius 0.3m is spinning at 5 rad/s. what is the mass of the clas
Is the state water-quality standard being met downstream : If the state standard downstream is not met, the state has informed town 1 that it must treat its sewage further so the downstream standard is met. Use a mass balance approach to show that the state's request is unfeasible.
Write a boolean method : A random walk begins at a point and repeatedly takes a step in a randomly chosen direction. In our version, the random walk will start at the center of a circle and continue until it goes outside the circle.
Explain what aspects of the system should be evaluated : What aspects of the system do you think should be evaluated. Are those aspects considered in the evaluation. What is the experimental testbed used. What experiments were performed. Details of experimental results. What aspects of the system were n..
How thick is the wall of my sphere : If i have a hollow copper sphere that has an outer diameter of 20.00 cm that is floating so that everything is just submerged in a bucket of water
What is the value of the test statistic and the chi-square : What is the value of the test statistic and the chi-square table, the most accurate statement that can be made about the p-value

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the effect of temperature on compressive strength

what is the effect of temperature on compressive strength of concrete?

  Illustrate and annotate the lever system

a wheel barrow is used to lift a 200lb load. the lenght from the wheel axle to the center of the load is 2ft. the length from the wheel and axle to the effort is 5 ft. illustrate and annotate the lever system.

  Find the force that these gas generates on the top

the circular top of a can has a radius of .0320m. the pull-tab has an area of 3.8x10^-4 m^2. the absolute pressure of the carbon dioxide in the can is 1.40x10^5Pa. find the force that these gas generates on the top of a can?

  What is the allowable minimum length of the ramp

Using the ADA code, what is the allowable minimum length of the ramp base if base if it is 2 ft high and the code is 1:12

  How will alum floc described in part d need to enter basin

A water treatment plant with a maximum daily flow of 4.4 m3/s is treating surface water with a minimum ambient temperature of -1°C (30°F). The water is coagulated with alum and the alum floc was measured to have a settling velocity of 1.6 m/h at 1..

  Ensure that the maximum tractive effort developed for front

how far back from the front axle would the center of gravity have to be to ensure that the maximum tractive effort developed for front- and rear- wheel-drive options is equal (assume that all other variables are unchanged)

  Determine the power output of the engine in each cycle

If it absorbs 100 Joules each cycle from the hot reservoir, how much work does it do. How much heat is given off in each cycle If each cycle takes 0.5 seconds, find the power output of the engine.

  Problem related to skaters with masses

Physics two skaters with masses of 65 kg and 45 kg, respectively stand 8.0 m apart each holding one end of a rope.

  Discuss the advantages and disadvantages of attached growth

Biological treatment processes for wastewater can be catogarised as dispersed growth and attached growth systems. Discuss the advantages and disadvantages of attached growth systems over dispersed growth systems.

  Design a rectangular reinforced concrete beam for the span

design a rectangular reinforced concrete beam (tension steel only) for the span and superimposed service loads shown. use f'c=5000psi and A615 grade 60 steel. LL=3.5 k/ft over the first 12 feet of the beam

  Determine the specifc energy of water in the channel

A rectangular channel is 25ft wide and has a flow of 500 cfs at a velocity of 5ft/s. (a) Determine the specifc energy of water in the channel. (b) What is the criticl depth of water in the channel (c) What is the critical velocity

  Determine the service rate for six vehicles per minute

Vehicles begin to arrive at a toll booth at eight vehicles per minute from 9 A.M. to 10 A.M. The booth opens at 9:10 A.M. and services at a rate of ten vehicles per minute until 9:40 A.M. From 9:40 A.M. until 10 A.M.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd