Investigate a project management scenario

Assignment Help Project Management
Reference no: EM131827920 , Length: word count:1700

Principles of Project Management Minor Case Study Assignment

Assignment objective - Working in your syndicate groups, you will investigate a Project Management scenario, using information given to develop a written report and presentation to answer questions about the scenario. The Report is to be 1500 words, plus a reflection (max 200 words).

Aim - This assignment aims to improve and demonstrate your understanding of:

• Project Tracking and Reporting
• Presentation Skills
• Team Behaviour and Team Building
• Learning and Reflection

Scenario -

You are working for ProCon Services Australia, a Project Management consultancy. Your company has been engaged by Vella IT Office Fitouts, who are currently undertaking the fitout of a medium-rise office building in a Sydney suburb. A team of company staff and contractors, led by a Project Manager, have been performing the work. The fitout is partcompleted, and the Project Manager, Tony Faultier, has just left the company abruptly, moving overseas to take up a position in another company.

You have been put in charge of working with Vella IT Office Fitouts to investigate the current status of the project and determine any corrective action required, including providing advice on replacing the project manager, and improving the performance of the project team. You are to report your findings to the board of Vella IT Office Fitouts, including Jim Vella, the business owner and chairman.

The building comprises four levels, and is designed to house 200 people, with 50 on each floor. Each floor provides 500 m2 of office space. Vella Office Fitouts are in charge of the entire fitout, including furnishings, plumbing, electrical and data and telecom infrastructure. 200 staff of Ferrari Software, a computer software company, are to be relocated into the building at the end of the fitout.

Information gathering -

As you begin your investigation, you find that Tony Faultier has left very little in the way of reliable records of the project. As you interview other staff and stakeholders, you are able to build up the following picture:

The Project

• The total fitout budget is $1.2M.

• The original schedule was for completion in a total of four months, commencing on 1 March, and completing on 30 June. It is now 1 May. At this point, the schedule states that work on the ground floor should be completed, the first floor 50% completed and the second floor 50% completed. Work on the top floor is not yet due to commence.

• On investigation, it is found that the work on the ground floor is only 75% complete, the first floor is 25% complete and the second floor is 25% complete. Also, the top floor is 50% complete, ahead of schedule.

• So far, $675K has been spent on the fitout.

The People

• You are told that Tony Faultier was seen as a belligerent, even bullying, project manager; but the team also saw him as being somewhat lazy in his own work, while being impatient and intolerant of others.

• Tony's style was quite autocratic, and he was unwilling to listen to advice from members of the team.

• Vella Office Fitouts have a strict policy of performance-based salary for all staff, where bonuses are paid for performing beyond work targets.

• Some of the team members were aware that work should not have commenced on the top floor, and attempted to tell Tony that this was causing problems, with one case of accidental leakage from the plumbing causing damage to the first-floor fitout, delaying work; however, Tony advised them to continue with the work. It was found that he was being paid a commission by a former senior manager at Vella for completing the Board Room on the top floor early for a personal celebration.

• A number of the Vella Office Fitouts staff complained that some of the contract staff did not seem to have received adequate training on the specialised data cabling required for this fitout, leading to costly rework in the cable terminations.

Your Presentation and Report -

You and your team are to produce a full report, which you will present to the Board of Vella Office Fitouts. Your report should include the following details:

• A brief summary of the current status of the project, including the Cost Variance and the Schedule Variance. This should also include an overview scorecard or chart of the project, comparing the scheduled tasks to the actual.

• A list of any additional information the new Project Manager will need to source in order to produce regular, detailed status reports on the project.

• An overview of the leadership behaviour on the project. This should use the Organizational Zoo model to represent Tony Faultier's observed behaviour, and should also make recommendations for the preferred leadership behaviour to be targeted in the recruitment of a new Project Manager, including support and justification.

• An overview of the existing team environment, with recommendations for changes to work processes and policies to establish a more cooperative environment, where team members will feel more able to share their knowledge of project risks or problems, and contribute to improvements in project performance. This should also be supported with some analysis.

Report -

The written report should be 1,500 words, and include relevant diagrams, charts and images. You should also include a brief reflection as an appendix (maximum 200 words), The report should include the following items:

• An Executive Summary (half page)
• A Table of Contents
• An introduction outlining the contents of the Report
• Discussion of the four key elements to be presented, with relevant citations
• A summary of recommendations and a conclusion summarising the report
• A reference list, using Harvard referencing style
• Reflection

Reference no: EM131827920

Questions Cloud

What is the state of music sharing over the internet : What is the state of music sharing over the Internet at the time you are reading this question? If you were an artist which side of the argument would you take?
How is the population changing in texas : How is the population changing in Texas? What are some of the possible political implications of the changing population in Texas?
What is the speed of propagation of waves : a) What is the speed of propagation of waves in the string? b) What is the maximum transverse speed of this point A on a string?
How long is the solenoid : A solenoid with air core has a magnetic induction of 0.08Weber/m2 at its center when a current of 40A flows through the wires having 500 turns.
Investigate a project management scenario : EPM 5600 - Principles of Project Management Minor Case Study Assignment. You will investigate a Project Management scenario
What was the source of the article : No financial decision-maker should ever rely solely on the financial information reported in the annual report to make decisions.
Determine the magnetic induction midway : An N- pole of 100 A-m pole strength and an S-pole with 50 A-m pole strength are 50 cm apart. Determine the magnetic induction midway between the two magnets.
Distinguish between a gate and a circuit : Distinguish between a gate and a circuit. What are the three notational methods for describing the behavior of gates and circuits?
Find the pole strength of each magnet : The pole strength of one magnet is four times the pole strength of the other magnet. Find the pole strength of each magnet.

Reviews

len1827920

1/23/2018 4:02:43 AM

Australian student, Word limit - 1500 + 200 words (appendix). The Report will be assessed using the following criteria: Accurate presentation of current project position and reporting requirements, Understanding of individual and team behaviour and interpersonal dynamics, Writing mechanics (structure and flow), Layout and writing quality, Effective use of images and multimedia, Recommendations and conclusions, Referencing and Team planning and reflection.

len1827920

1/23/2018 4:02:37 AM

Rich understanding of the project, clearly and professionally displayed, with detailed, professional plan for future direction. Rich understanding of the scenario environment with compelling case for the future direction. Creative and innovative approach. Overall style and use of language encourages ease of comprehension and insightful conclusions. Professional formatting, overall appearance and style. Supported by creative, innovative graphics and charts used well. Insightful recommendations and conclusion, inspiring the reader and supporting the overall report well. Comprehensive coverage with wide range of high quality sources, thoroughly referenced. Professional project plan, with reflection showing deep insight.

Write a Review

Project Management Questions & Answers

  Inclusion of a sound culture and adoption

Do you think the inclusion of a sound culture and adoption of tried and tested methodologies and standards can improve this process and Or is this too idealistic or simplistic

  Alternative solutions to project management problemscan

alternative solutions to project management problemscan anyone please help me with some ideas on the

  How might the information in the given article help you

How might the information in this article help you be an effective project manager? What did you learn from this that you can apply to your work as a PM?

  Project manager and unforeseen risks - planning

Explain how should the project manager expand for the enterprise-level project and plan for these factors accordingly

  Why it projects are less likely to be delivered on time

Explain why IT projects are less likely to be delivered on time and within budget than large building construction projects. ?Include a discussion of how project management software can help IT project managers achieve their goals.

  Investment and performance analysis

Evaluate the usefulness of ROCE

  The modal preference or the median preference

Auto manufacturers are sensitive to the color preferences of consumers. Would they like to know the modal preference or the median preference?

  Find two numbers whose difference is 21

Find two numbers whose difference is 21 and whose product is a minimum.-  Find two positive numbers whose product is 15 and whose sum is a minimum.

  Which is the better investment

If both the bond and the continuous income stream earn 3.75%, compounded continuously, which is the better investment?

  Describe the taguchi methods for experimental

Describe the Taguchi Methods for experimental design and how the concepts of robustness and design for quality are integrated into this method of experimental.

  Problem regarding the women movement

Make an argument about how power impacts the use of violence by men. Then discuss how the women's movement impacted both men and women in crime rates.

  Arranged marriage with free­choice marriage

Compare and contrast arranged marriage with "free­choice" marriage. Analyze the similarities and differences between arranged marriages and modern "free choice"

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd