Investigate a network diagram of distribution sub-station

Assignment Help Electrical Engineering
Reference no: EM132371924

Electrical Systems Protection Assignment - Project task description

Investigation of Network Protection in a Substation:

In this project, you will investigate a network diagram of a practical distribution sub-station and its different protection schemes. After detailed investigation, you will write a report based on your understanding of different protection schemes in various section of the substation network. You will also need to find out the standard relay settings of overcurrent relays used in the power network.

Your task here are to:

(a) Identify different protection schemes in the network (See the attached single line diagram of Berserker substation in Attachment-1). You will write a report based on your understanding of protection systems used in distribution substation. Your task is to list installed protection schemes (please see the attached file: Protection connection diagram in Attachment-2) and discuss which protections you are now familiar with and how they are working in this network from the incoming to the outgoing lines in the sub-station. In order to identify the protection schemes used in the network, please see the data table (please see the attached file: Protection function data in Attachment-3).

(b) Make comment on the relay settings and coordination of overcurrent earth fault relays used in the radial portion of the distribution network (please see the attached file: Radial portion of the Berserker distribution network in Attachment-4). A separate single line diagram of a simple test network is provided (please see the attached file: Attachment-5) in order to help understanding what you will need to do.

Network description:

The given network is the single line diagram of a 66/11kV Berserker Sub-station in Rockhampton. The attached single line diagram of Berserker substation (Attachment-1) is the operating diagram of the sub-station that shows how it is working. Two 66kV line coming from two different sources, named 66 kV Glenmore and 66 kV Lakes Creek sub-transmission Feeder to the sub-station and finally it distributes the line to a total of sixteen 11kV distribution Feeder that goes to the end loads.

The attached file (Protection connection diagram- Attachment-2) shows the details of the protection schemes installed at different sections of the sub-station network. A list of all installed protection relay names and numbers are listed in the attached file - Protection function data-Attachment-3.

The attached file (Attachment-5) is a testbed of a typical radial distribution network which has two relays connected to the system to protect it from the faults. This file will help you to understand how the overcurrent earth fault protection relays are working in terms of relay settings and coordination in the network presented in the file- Radial portion of the Berserker distribution network-Attachment-4.

Guideline to prepare your Project Report:

Your report should contain the following points -

1. Cover page (indicate title, student name and ID, Unit name and Unit code. Include the following declaration at the bottom of cover page.

2. Introduction (indicate a general introduction of the project. It should be no more than 2-3 paragraphs)

3. Objective (write about the learning Objective of this project. This should be in few bullet points)

4. Background or Network description (Describe about a substation and design consideration of a substation. This should be no more than 2-3 paragraphs)

5. Redundancy in Network design (cover redundancy, it's use, advantage and how it is applied in the given network schematics. You can choose some bullet points in this section)

6. Protection Equipment (describe electrical protection in power network, list the protection schemes used in the given network schematics, briefly describe each protection systems used in the network. For each relay, please write 3-4 sentences)

7. Protection (Overcurrent) relay setting and coordination: (Follow the instructions and additional radial distribution network diagram. See the attached reference file)

8. Conclusion (indicate the benefit of redundancy and protection systems in the power network)

9. Reference (include relevant references with standard IEEE format)

10. Appendix (include supporting documents in the appendix part).

Attachment:- Electrical Systems Protection Assignment Files.rar

Reference no: EM132371924

Questions Cloud

How you use knowledge and skills to support professional : After addressing the problems, conclude your paper with details on how you will use this knowledge and skills to support your professional and or academic goals
Explain the aesthetic principles expressed in visual arts : Describe the historical development of the humanities from the prehistoric era to the present. Explain the aesthetic principles expressed in the visual arts.
How research methods have to be adapted when used : CHI2018 – MONTREAL, CA- Understand how research methods have to be adapted when used with children and know how to apply several commonly used methods in CCI.
Differentiate between symptoms and root causes : Summarize your diagnosis of organizational problems, being sure to differentiate between symptoms and root causes. Focus on individual OB themes.
Investigate a network diagram of distribution sub-station : SEE716 - Electrical Systems Protection Assignment, Deakin University, Australia. Investigate a network diagram of a practical distribution sub-station
How will these systems benefit staff and work environment : What activities and problem-solving systems can be utilized, and how will these systems benefit the staff and work environment?
Find out the difference in response between years : You need to find out The most common response for each item on every academic year and Difference in response between years.
Discuss Vision and Mission Development for Enterprises : Summarise the given article - The Significance of Vision and Mission Development for Enterprises in Slovak Republic
Construct a histogram for both types of restaurants : HA1011 Applied Quantitative Methods-Holmes Institute-Australia-Construct a frequency distribution for both type of restaurants using 10 classes.

Reviews

len2371924

9/17/2019 3:09:51 AM

Note: assessment marking Rubric will be based on above 10 points and portfolio structure. Note: Acknowledgement to Ergon Energy for the network diagram of one of the substation in Rockhampton, Queesnland. Assessment marks: 20% of total (This is a part of Assessment Task-3).

Write a Review

Electrical Engineering Questions & Answers

  Lithium ion battery technology

The paper includes Lithium ion battery technology with its advantages and disadvantages. The paper discusses about the Lithium air battery in which detailed reactions of Lithium with air including nonaqueous as well as aqueous are given.

  Power transformers and tariffs

Construction of different types of power transformer, significant energy savings

  Paper on orthogonal frequency-division multiplexing

This document is shown a paper on Orthogonal frequency-division multiplexing with advantages, disadvantages and uses.

  Function of the hmi in a scada system

This assignment contains electronics engineering questions like State the commonly found components of a SCADA (Supervisory control and data acquisition) system. and decribe the function of the HMI in a SCADA system.

  Resultant waveform of the odd harmonic series

Prepare an Excel graph showing the individual components and summated resultant waveform of the odd harmonic series resulting in an approximate square wave.

  Explain scada system

Explain the function of the HMI in a SCADA system.

  Design a 2-digit 24 second shot-clock

Design a 2-digit 24 second "shot-clock" countdown timer with pushbutton controller.

  Model a discrete-time system

To understand di erent signal models To be able to model a discrete-time system and design simple signal processing algorithms.

  Draw a relay construction diagram

Draw a relay construction diagram and briefly explain the operation of a relay.

  Frequency division multiplexing

Write a short technical report on Frequency Division Multiplexing

  Impact of electron energy

Briefly discuss the impact of electron energy, electron current and target on the Bremsstrahlung generated.

  Traffic light controller

The schematic of the traffic light controller

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd