Reference no: EM1380161
The aim of the course is to give fundamental knowledge of supply chain management and establish understanding of logistics terminology and concepts and thereby be able to apply the most important methods for analyzing, developing, monitoring, controlling and implementing material flows in industrial and commercial supply chains.
The aim is realized by theoretical studies but as well by working on a project that gives insights into specific areas of logistics and supply chain management, preferably in the context of the Gulf region.
a deeper knowledge and understanding of a selected topic or approach related to logistics and supply chain management in the Gulf region context, practice in the creation and dispersion of logistics and SCM knowledge through search and evaluation of existing knowledge /literature as well as the formulation, organization and presentation of new knowledge.
The paper should be based on a literature review, taking its starting point in a conceptual or empirical research question related to the selected topic. The paper should be analytical.
The literature is subject to critical evaluation and that there is a clear logic argumentation. The own contributions should be clearly stated and motivated. Apr)Itc the concept to logistics in the Gulf region or to one of the companies the students rem preferred.
The literature is used to analyze the defined problem. The analysis is logical, structured and the conclusions drawn follow clearly from the analysts.
Examples of issues that can be studied:
Procurement and Supplier Relations Management
Inventory Management including Warehouse Management
Track and Trace of items (including ID, mobile and supporting technology
Lean supply chains and the effects on various characteristics of logistics
SCM and the implementation challenges
Information systems and role in supporting logistics activities
Effects of globalization on procurement, manufacturing and distribution
Production setup designs and effects on specific characteristics like time, etc.
Risk management in supply chains
Functional deliveries to construction sites (finished modules instead of
Centralized distribution system vs decentralized
Inbound flow of items through terminals for construction sites (call-oi
Design and effects of VMI solutions
Product design implications from transportation operation
Environmental issues related to transportation
Environmental issues related to logistics solutions
Discussion on clustering and data mining
: Clustering is generally used along with classification in some applications. In such a case, typically clustering is applied to a dataset to recognize natural grouping of the objects in the dataset,
|
Understanding planning stage of the audit process
: Prepare a memo to the audit partner on the ‘state of the company's industry' and associated risk factors and prepare a list of three useful sources and perform overall analytical procedures
|
Design a control unit for simple hand held video game
: Create a control unit for a simple hand held video game in which a character on the display catches objects. Only demonstrate the transition diagram
|
Calculate a three quarter moving average forecast
: The Fastgro Fertilizer Corporation distributes fertilizer to various lawn and garden shops. Calculate a three-quarter moving average forecast for quarters 4 through 13 and calculate the forecast for each quarter.
|
Inventory management including warehouse management
: The aim of the course is to give fundamental knowledge of supply chain management and establish understanding of logistics terminology and concepts
|
Question about pure aloha
: A group of N stations share a 56-kbps pure ALOHA channel. Every station outputs a 1000-bit frame on an average of once every one-hundred secs, even if the previous one has not yet been sent.
|
Creating a chart for it system
: Make a chart that demonstrate the breakdown of the overall IT systems at a big corporation or breakdown a particular aspect of the IT systems such as the network or the business applications systems.
|
Interchange contents of working registers
: Make a stack at 1000h and use the stack to interchange the contents of all of working registers. Exchange AX with DX, BX with CX, and DI with SI.
|
Explain an application level protocol
: Create and explain an application level protocol to be used in an automatic teller machine and a bank's centralized computer. Your protocol should permit a user's card and password to be verified,
|