Reference no: EM132524118
MTH203 Business Statistics - Emirates College of Technology
Project Task
Choose one topic from the list of topics below. You have to respect the working guidelines given below and the submission date.
List of topics
Each project must include: Description of the method, purpose of the method, statistical tools used, and a real-world application.
Topic 1: Interval estimation of a population proportion with population mean.
A method for developing interval estimates of a population proportion. The use of an interval estimate provides a measure of the precision of an estimate. In practice, the sample sizes used for interval estimates of a population proportion are generally large.
Topic 2: Testing the Significance of the Slope and y-Intercept
A simple linear regression model is not likely to be useful unless there is a significant relationship between x and y. In order to judge the significance of the relationship between x and y, we test the null hypothesis: Ho: [h = 0 versus the alternative hypothesis: Ha' 1 / 0.
Topic 3: Analysis of Variance: The F test
A technique whereby the total variation present in a set of data is partitioned into two or more components. Associated with each of these components is a specific source of variation so that in the analysis it is possible to ascertain the magnitude of the contributions of each of these sources to the total variation.
Project
Project Guidelines
During the class time, each student needs to conduct an online presentation. Successful projects will clearly demonstrate:
A. Project Structure:
It is recommended that your project report have the following structure in the order provided here.
1. Title pace
The students' details should be filled in the cover page provided.
2. Abstract / Executive Summarv
The Abstract consists of the project title and about half a page concise summary containing the scope and results of your study.
3. Table of Contents
Table of contents should contain titles and page numbers for the main sections and subsections of your report. The table of contents should also include entries for any appendices in your report.
4. Report Bodv
This is the central and main part of the project which contains the actual work done during the project. The main requirement is that you need to structure the report so that it is clear and structured in a way that makes sense. Grammar and spellings count.
5. Conclusions / Opinions and Recommendations
The project's conclusions should list the things which have been learnt as a result of the work you have done.
6. A Bibliographv / References
You are responsible for appropriately citing material and methods that you use. Give references for the data collected from a text book, a magazine or a website identifying its sources while using the appropriate form. In the references section, references should be in a numbered list, ordered alphabetically by the last name of the first author.
How are men portrayed versus women
: How are men portrayed versus women? What key struggles did the characters undergo which revealed important information about the time period and their culture
|
Discuss the problem of workplace abuse of social media
: Discuss the problem of workplace abuse of social media, e-mail, instant messaging, online shopping, and other Internet browsing.
|
Prepare schedule of cash collections on accounts receivable
: Preparing a Schedule of Cash Collections on Accounts Receivable. Schedule showing the cash expected in payments on accounts receivable in August
|
What is the target conversion and administrative cost
: If company management desires a return equal to 10 percent of the final selling price, what is the target conversion and administrative cost per unit?
|
Interval estimation of a population proportion
: Interval estimation of a population proportion with population mean and Testing the Significance of the Slope and y-Intercept
|
Prepare a production cost report for august
: Prepare a Production Cost Report for August, 2019. The ending work in process was 100% complete with respect to materials and 50%
|
Calculate the operating cash flow for the repair shop
: Calculate the operating cash flow for the repair shop using the three methods given below:
|
Security architecture and design
: System architecture is the descriptive representation of the system's component functions and the communication flows between those components.
|
What is the value of the factory
: You forecast that it will produce cash inflows of $95,000 in year 1, $155,000 in year 2, and $250,000 in year 3. The discount rate is 12%.
|