Interpret different types of construction information

Assignment Help Civil Engineering
Reference no: EM133204653

N5E06 Construction Information (Drawing, Detailing, Specification) - Level 5 Higher National Diploma in Construction and the Built Environment

Construction Information (Drawing, Detailing, Specification)

LO1 Evaluate different types of construction information in the context of diverse project types.

LO2 Develop construction drawings, details, schedules and specifications in support of a given construction project.

LO3 Interpret different types of construction information in order to explain a construction project.

LO4 Assess ways in which construction professionals collaborate in the production of construction information.

P1 Explain the use of construction information in the context of a project.

P2 Describe the different types of construction information and their uses.

P3 Develop a set of general arrangement drawings, selected details and door/window schedules.

P4 Produce an outline bill of quantities.

P5 Relate a set of construction drawings to a specification.

P6 Evaluate construction drawings and details to identify ‘clashes'.

P7 Assess the types of information produced by different participants in a construction project.

P8 Examine the relationship between different bodies of information and how they work in conjunction.

M1 Compare different types of construction information to identify their suitability in specific contexts.

M2 Compose a schedule of works.

M3 Critique a body of construction information, identifying errors and discrepancies.

M4 Compare the roles of CAD and BIM in the collaborative production of construction information.

D1 Justify the use of specific types of construction information in support of a given project.

D2 Propose corrections to construction drawings and specifications using industry standard forms of notation.

Scenario
You have recently been employed as a civil engineering technician. Your employer, a medium-sized general contractor, has been commissioned to design and build a small building in a local industrial park. The design team within the company has prepared a set of outline design drawings, which provide general information about the proposed building, site and form.

You are tasked with the responsibility of preparing the construction information package that will allow the construction team to build the project. The package of information required includes the following:
• Site Location Plan
• Site plan
• Floor plan
• Elevations
• Section/Details
• Door and window schedules
• Outline bill of quantities
• Schedule of works

Accompanying the construction information package, your employer wishes to understand your reasons for the drawings, specification and schedules that you have produced.

The submission is comprised of two parts:
1. Construction Infrmation; to include:
a) Site Location Plan (1:1250)
b) Site plan (1:500 or 1:1000)
c) Floor plan (1:50 or 1:100)
d) Elevations (1:50 or 1:100)
e) Section (1:20)
f) Detail(s) (1:5)
g) Door and window schedules
h) Outline bill of quantities
i) Schedule of works

All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information and be numbered using an industry standard.
Drawings should be produced using an industry standard CAD software package. BIM software may be used but is not required.
2.A written report - this should be a justification of your decisions for producing specific information for the project and compare the choices you have made with other potential information types.

Scenario
One of your colleagues, in a medium-sized general contracting firm, has produced a set of construction information documents for a small industrial building. Before issuing this information to the construction team, your employer has asked that you review the information to ensure that it is fit-for-purpose. In particular, your employer asks you to:

• coordinate the drawings with the schedules, specifications and bill of quantities
• identify any information clashes
• highlight areas where there may be missing, or incorrect information provided.

You are then tasked with making corrections to the construction information, ensuring that copies of the originals and your recommended changes are recorded.

Finally, you are asked to prepare a short report on the construction information package that you have reviewed. You will discuss your findings with the original author of this work, as part of both of your continuing professional development.

The submission is comprised of two parts:

1. Construction Information Review; to include:
a. ‘Redlined' construction drawings (highlighting errors or inaccuracies)
b. ‘Marked-up' specifications and schedules (highlighting errors or inaccuracies)
c. Corrected versions of all documentation, with suitable revisions recorded.

2. Feedback Report - Produce a report explaining the design team roles (such as Architect, Landscape Architect, Quantity Surveyor, Civil Engineer, Building Services Engineer etc), how they work with each other and assessing the types of information produced by each. The report should also highlight and compare the impact of CAD and BIM in the collaborative process of producing construction information.

Attachment:- Construction Information Drawing Detailing.rar

Reference no: EM133204653

Questions Cloud

What stock exchange is the company listed on : Please make sure your written paper includes answers to the following questions: What stock exchange is the company listed on? What is their ticker symbol
Name specific job crafting strategy or intervention : Which specific job crafting strategy or intervention do you think would be most effective at your organization or for your specific job?
What constellation is almost directly opposite the ecliptic : Place the sun on today's date. What constellation is almost directly opposite the ecliptic? What time of night is this constellation at its highest point?
Differentiation strategy and abest-cost strategy : How would you characterize Stihl's competitive strategy? Should it be classified as low-cost provider strategy? A differentiation strategy? Abest-cost strategy?
Interpret different types of construction information : Interpret different types of construction information in order to explain a construction project and Assess ways in which construction professionals collaborate
How would you characterize best buy competitive strategy : How would you characterize Best Buy's competitive strategy? Should it be classified as a low-cost provider strategy? A differentiation strategy?
How is your cell phone call transmitted : AST 131 Dutchess Community College. How is your cell phone call transmitted? List the approximate years that your identified EM waves have been in use.
Personal values and personal model of servant leadership : How could your personal values and personal model of servant leadership influence individual and group behavior?
Write an essay describing social reactions to the discovery : anth 102 The College of Southern Nevada. Write an essay describing social reactions to the discovery of evolution by natural selection.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What are the recorded values of r dot and r double dot

at the bottom of a loop in the vertical plane an airplane has a horizontal velocity of 315 mi/h and is speeding up at a rate of of 10ft/s^2. The radius of curvature of the loop is 1mi. The plane is being tracked by radar at O.

  Four-lane highway for adequate ssd

A horizontal curve was designed for a four-lane highway for adequate SSD. Lane widths are 12 feet, and the superelevation is 0.06 and was set assuming maximum fx.

  What is the retention time in each of the settling tanks

A water treatment plant has 6 settling tanks that operate in parallel (the flow gets split into six equal flow streams), and each tank has a volume of 600 m3.

  What would be amount in moles if the container held nitrogen

A container with volume 0.2 m^3 holds oxygen and has gages showing readings of 70°C and 25 bars. Calculate the amount of oxygen (mass and moles) in the container if the atmospheric pressure is 1 bar.^3

  What is the coefficient of permeability

An aquifer is 45 meters deep and has a well that pumps water at 850 cubic meters per day. One observation well is located 45 meters away and has a water surface that is 44.35 meters above the bottom of the aquifer.

  What average thickness must the engineer build to meet these

An engineer uses a standard technique for measuring the thickness of a clay landfill liner that has a typical standard deviation of 0.7 in. The project specifications require the liner thickness to be 36 inches or more, at least 95 percent of the tim..

  Determine diameter of the shaft at allowable shear stress

The pulley at B is connected to a motor that is driving the system. The other three pulleys are consuming the power delivered by Pb . Pa = 20kW, Pb = 75kW, Pc = 30kW, and Pd = 25kW and the shaft is rotating at 120rpm.

  What is the maximum horizontal angular error introduced

When you sighted the to the opposite end of the base line for the inaccessible point lab exercise, the target you used was 0.04 feet (about ½ inch) from the center of the station sighted.

  What is the level of service of the upgrade segment

On this segment of freeway, the directional peak-hour volume is 3800 vehicles with 2% large trucks and 4% buses (no recreational vehicles), the peak-hour factor is 0.90, and all drivers are regular users.

  Compute the horizontal and vertical components of force

The boom supports two vertical loads. Neglect the size of the collars D and B and the thickness of the boom, and compute the horizontal and vertical components of force at the pin A and the force in the cable CB. Set F1= 800 N and F2= 350 N.

  What is the average annual inflation rate for the machine

You purchased a machine 5 years ago for $100,000 and now the machine costs $135,000. What is the average annual inflation rate for this machine

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd