Reference no: EM133046440
Improving Job-Shop Scheduling Decisions Through RFID: A Simulation-Based Assessment
Please answer the questions at the bottom of this application case.
"A manufacturing services provider of complex optical and electromechanical components seeks to gain efficiency in its job-shop scheduling decision because the current shop-floor operations suffer from a few issues:There is no system to record when the work-in-process (WIP) items actually arrive at or leave operating workstations and how long those WIPs actually stay at each workstation.The current system cannot monitor or keep track of the movement of each WIP in the production line in real time.As a result, the company is facing two main issues at this production line: high backlogs and high costs of overtime to meet the demand. In addition, the upstream cannot respond to unexpected incidents such as changes in demand or material shortages quickly enough and revise schedules in a cost-effective manner. The company is considering implementing RFID on a production line. However, the company does not know if going to this major expense of adding RFID chips on production boxes, installing RFID readers throughout the production line, and of course, the systems to process this information will result in any real gains. So one question is to explore any new production scheduling changes that may result by investing in RFID infrastructure.
Methodology
Because exploring the introduction of any new system in the physical production system can be extremely expensive or even disruptive, a discrete event simulation model was developed to examine how tracking and traceability through RFID can facilitate job-shop production scheduling activities. A visibility-based scheduling (VBS) rule that utilizes the real-time traceability systems to track those WIPs, parts and components, and raw materials in shop-floor operations was proposed. A simulation approach was applied to examine the benefit of the VBS rule against the classical scheduling rules: the first-in-first-out and earliest due date dispatching rules. The simulation model was developed using Simio. Simio is a 3-D simulation modeling software package that employs an object-oriented approach to modeling and has recently been used in many areas such as factories, supply chains, healthcare, airports, and service systems.
Figure 6.13 presents a screenshot of the Simio interface panel of this production line. The parameter estimates used for the initial state in the simulation model include weekly demand and forecast, process flow, number of workstations, number of shop-floor operators, and operating time at each workstation. In addition, parameters of some of the input data such as RFID tagging time, information retrieving time, or system updating time are estimated from a pilot study and from the subject matter experts. Figure 6.14 presents the process view of the simulation model where specific simulation commands are implemented and coded. Figures 6.15 and 6.16 present the standard report view and pivot grid report of the simulation model. The standard report and pivot grid format provide a very quick method to find specific statistical results such as average, percent, total, maximum, or minimum values of variables assigned and captured as an output of the simulation model
Results
The results of the simulation suggest that an RFID-based scheduling rule generates better performance compared to traditional scheduling rules with regard to processing time, production time, resource utilization, backlogs, and productivity. The company can take these productivity gains and perform cost/benefit analyses in making the final investment decisions".
Questions
1. For Discussion In situations such as what this case depicts, what other approaches can one take to analyze investment decisions?
2.How would one save time if an RFID chip can tell the exact location of a product in process?
3.Research to learn about the applications of RFID sensors in other settings. Which one do you find most interesting?
Assess answerdash current go to market approach
: 1. Assess AnswerDash's current go to market approach, including customer selection, pricing, communication, and sales effort.
|
Social innovation philosophical innovation
: Social innovation philosophical innovation and political innovation strategic innovation triangle chart give an example of company and what type of strategy is
|
Compute the break-even sales for the current year
: Portmann Company, operating at full capacity, sold 1,000,000 units at a price of $189 per unit. Compute the break-even sales for the current year
|
Identifying training needs
: You are required to put together a brief plan for an induction - training plan for any new staff that commence their employment at your workplace as office admi
|
Improving job-shop scheduling decisions through rfid
: "A manufacturing services provider of complex optical and electromechanical components seeks to gain efficiency in its job-shop scheduling decision because the
|
What is the amount of interest expense
: Donna capitalized lease on January 1, 2016, in the amount of $119,781. What is the amount of interest expense Donna should report on its 2017 income statement
|
What is its net income
: Company XYZ has sales of $6500, total assets of $2950, and an equity multiplier (leverage) of 0.65. If its return on equity is 10%, what is its net income
|
Assignment on georgia internet research
: Using one of the Internet sources to research a real-world organization's informed consent and consent policy. Bring back specifics, such as the organization's
|
Design an ethernet network to connect a single client
: -Design an Ethernet network to connect a single client P C to a single server. Both the client and the server will connect to their workgroup switches via U T P
|