Improve the current catchment model

Assignment Help Civil Engineering
Reference no: EM133572015 , Length: 20 pages

Your firm is trying to engage a new client. They want to improve their catchment model to better understand the water quality in Homebush Bay. Previously, a stormwater quality model has been developed for the 8 km2 Powells Creek catchment, which drains into Homebush Bay. The basis of this original stormwater quality model is the US EPA SWMM software.

The SWMM model uses a non-linear reservoir model for surface runoff (pond model) with a kinematic model for flows in the channel. Water quality simulation is based on simulation of the EMC (event mean concentration) rather than a pollutograph or loadograph. The focus of the water quality simulation is on the prediction of the total mass of contaminant transported during the storm event. At present only the flow quantity component of the model is being calibrated. The client would like you to demonstrate the ability to create a water quality model and provide an indicated of the future work that might be required.

The water quality component of the model is yet to be developed. The client has been very generous and shared the previous study. Data available for use in the calibration are:

1. Rainfall data
1. 6 pluviometers (i.e. continuous rain gauges) within the catchment;
2. 6 pluviometers adjacent to the catchment;
3. 1 daily read gauge within the catchment and another 6 in close proximity to the catchment; and
4. Radar images of rainfall over the catchment; these images have not been processed, (i.e. converted to rainfall depths) but they are available for the study. The resolution of these radar images is 1 km x 1 km.

2. Catchment data
1. SRTM and LIDAR based models of the topography;
2. Detailed plans of the stormwater system in the catchment (note that the catchment is serviced by separate stormwater and sanitary sewer systems);
3. Detailed maps in GIS format of land use in the catchment (note that the whole catchment is urbanised);
Soil Maps of the catchment derived from the National Soil Survey

Gauged data at one site in the catchment for 49 years. The client indicated that the approving athorities identied concerns about the rating curve at this gauge station for higher flows. This concern arises from the proximity of railway culverts and the potential for the station to be drowned during higher flows. This gauging station is located in the upper reaches of the catchment and monitors only 2.4 km2 of the catchment.

You are required to provide a detailed proposal to the client (maximum of 20 pages, includive of diagrams, drawings, references and appendices).
The file below contains the details of calibration simulations. Data included in the file for each event (there are multiple events in the file) are:

• Rainfall records from the pluviometer located at the catchment outlet;
• Recorded flow for the event; and
• Predicted flows for alternative sets of parameter values.

To prepare you have had a detailed discussion with your manager. The questions that they would like you to addresss are as follows:
Firstly

i) Select and justify a calibration metric suitable for use to assess the calibration of the quantity component of the model;

ii) Apply this metric to the available data in a manner where all events are considered concurrently. You will need to consider how the different events can be combined and to justify this approach;

iii) Select and justify the best parameter set to be used with the water quality component of the model.
Secondly

i) How the different conceptual components of a catchment model would be used in developing this model.

ii) The sources of error in predictions obtained from a catchment model with reference to the current study. How should knowledge of these errors be considered in the current application?

iii) Whether the selected parameter values would change if a kinematic wave model were to be used in lieu of the non-linear reservoir model of surface runoff.
Finally

You have been asked to improve the current catchment model. To achieve that improvement, you have time and resources available. What would you do?

Reference no: EM133572015

Questions Cloud

What is solution to method of food wasting : What are some ways that you, or others that you know, waste food? What is a solution to this method of food wasting?
What information is collected from the client : What information is collected from the client when using this information? How will this instrument compliment primary assessment for substance use disorders?
What marketing strategies can be applied when starting : What marketing strategies can be applied when starting a new business (in a competitive area) of embroidery design, stickers and graphic services
How could total investment in inventories be lowered : Why was Wendy's one of the first to be hit by the meat shortage? What should Wendy's do? How could total investment in inventories be lowered?
Improve the current catchment model : How the different events can be combined and to justify this approach - calibration metric suitable for use to assess the calibration of the quantity component
Explain the value of each gambit to the negotiation process : Explain the value of each gambit to the negotiation process. Provide reasons why each gambit could increase the likelihood of a successful negotiation session.
What fairness might mean to property owners in cook county : consider the impacts of your modeling results as you work through this project, and think about what fairness might mean to property owners in Cook County.
Exclusive part of western knowledge systems : Science has sometimes been considered an exclusive part of Western knowledge systems. Did Indigenous peoples have science?
Discuss in detail one characteristic a paralegal : Based on this week's reading, discuss in detail one characteristic a paralegal must possess to be successful in a law firm that specializes in intellectual

Reviews

Write a Review

Civil Engineering Questions & Answers

  Draw the event tree and for the initiating event

An intelligence data bank center requires power 24 hours a day, 7days a week. If the main power grid fails, a backup power supply isinitiated.

  Supervisors technicians and skiled workers in dangerous work

As a project manager on site where work for 3 km long tunnel has been undertaken the site is remote and takes about 2 days to travel to nearest town supervisors technicians and skiled workers in dangerous work.

  Find the x maximum distance

This is a projectile motion when the initial angle is 30 degrees and initial velocity s 10 m/s. Find the total travel time. Find the x maximum distance.

  Determine the rate of evaporation of water

Water is to be boiledat sea level in a 30 cm diameter stainless steel pan on top of a3-kW electric burner. If60% of the heat generated by the burner is transferred to thewater during boiling, determinethe rate of evaporation of water.

  Determine the average shear stress in each pin

The pins on the frame at B and C each have a diameter of 0.25 in. If these pins are subjected to double shear, determine the average shear stress in each pin.

  What is the step method for drawing raft foundation

A long line of burning agricultural waste emits 0.3 g/m/s of particulate matter on a clear fall afternoon with winds blowing 3 m/s perpendicular to the line. Estimate the ground-level particulate concentration 400 m downwind from the line.

  Determine the normal strain in the two bars at 250 f

At a temperature of 60 F, a .04 in gap exists between the ends of the two bars. Bar 1 is an aluminum alloy [E=10,000ksi, v=.32, alpha=12.5x10^-6/F] bar with a width of 3 in and a thickness of .75 in.

  Determine the speed of the car when time t is given

The 1.2-Mg mine car is being pulled by winch M mounted on the car. If the winch generates a constant power output of 30 kW, and the car starts from rest, determine the speed of the car when t = 5s.

  Travel of particle during time period

Determine the acceleration when t = 4 s, the displacement from t = 0 to t = 10 s, and the distance the particle travels during this time period.

  Degree of correspondence in information-established criteria

Explain what is meant by: ‘degree of correspondence between information and established criteria?’

  Basics of economies of construction

For a metal and wood structure, how would the economies of construction be obtained (pertaining to the mean and standard deviation of a probability of failure graph)?

  Compute the land area required for land disposal

Calculate the surface area required for a stabilization pond to serve a domestic population of 1000. Assume 80 gpcd at 210 mg/l of BOD. Use a design loading of 20 lb of BOD/acre/day.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd