Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. 19 A 300 ft long roller conveyor, which operates at a velocity = 80 ft/min, is used to move pallets between load also unload stations. Each pallet carries 12 parts. Cycle time to load a pallet is 15 sec also one worker at load station is able to load pallets at rate of 4 per min. It takes 12 sec to unload at unload station. Determine (a) center-to-center distance between pallets, (b) number of pallets on conveyor at one time, also (c) hourly flow rate of parts. (d) By elucidate how much conveyor speed must be increased to increase flow rate by 3000 parts/hour.
Q. Illustrates what actors also forces in Levis stress also company micro also macro environment have affected its marketing position.
It is normally distributed also has a criterion deviation of 2 days. Illustrate what is the probability of a stock out during lead time.
Explain why you believe this barrier is challenging for organizations as well as elucidate what you would do to overcome it, if you were faced with change in your organization.
Explain how could Stryker utilize insights gained from the experiences of the Freiburg team to address the ongoing quality problems with the actual orthopaedic implants.
A single pigeon has a 0.7 probability of arriving at the proper destination in a timely fashion. How many pigeons, each carrying an identical set of orders, must Grant send in order for him to have 98% confidence (reliability) that the orders reach G..
Is the liquidated damage amount stated in the contract between Mica Co. and Pack Rat Storage valid, or is it an invalid penalty? How much in damages can Pack Rat Storage recover from Mica Co.?
You have been asked to update your general counsel on 5 major issues and challenges that may affect the contract the legal team needs to write before business can begin. You decide to prepare a presentation that focuses on different areas the team..
Illustrate what order size would minimize total inventory costs. Illustrate what are total costs of inventory. Office manager is presently using an order size of 200 packages.
Storing this paper requires a specialized facility and holding costs are 32%. Assume a lead time of 1 week and that re are 250 working days in a year. Illustrate what order quantity minimizes my total inventory costs.
Apply critical path method and probability analysis to the case study. Identify critical activity and critical path and find the minimum project completion time.
Formulate this problem as a TSP problem also then solve it using the branch also bound approach for TSP to Find out an optimal drilling order.
Illustrate what kind of challenges did the IRS encounter when implementing its CDW. Illustrate what management, organization also technology issues had to be addressed.
Elucidate how well is project doing in terms of priorities. If one of industrial engineers assigned to your project would be available to work on project from Aug 22-27, 2008. Illustrate what would you tell him.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd