Identify the issues involved in securing productivity gains

Assignment Help Civil Engineering
Reference no: EM131772736

Project Management

INTRODUCTION:
The purpose of the manual is to highlight the objectives and deliverables for students doing their course work project in Project Management module.

Learning Outcomes
1. Apply basic principles of management to the use of materials, plant and labour on construction projects.

2. Identify the issues involved in securing productivity gains in construction.

3. Produce programmes for low complexity projects using appropriate manual techniques.

4. Use project planning software to generate master programmes for simple construction or design projects.

TASK:

The following project case is exercise that can be solved individually. In the project, students will have hands-on experience in developing an integrated framework for the planning, scheduling, resource management, and project costs.

Data:

In the following project (Figure 1), a two-level residential house is to be constructed. The objective is to prepare a realistic bid and prepare complete plan. Your resource bank involves crews, material, and subcontractor resources are given in the attached "Coursework Project- Data" Excel sheet. List of project activities, durations, logical relationships, and list of required resources are given in Table 1. On the other hand, crews' data, materials data, and subcontractors' data are given in Table2, Table3, and Table 4 respectively.

1472_House Plan.jpg

Figure 1: House PlanRequirements

The fundamental aim of this assignment is to allow students to apply the sets of skills and knowledge that was accumulated to demonstrate his ability in preparing a reasonable plan for a project through:

1. Suggest and discuss the Work Breakdown Structures (WBS) and present it as an organizational chart.

2. Construct Gantt chart and Activity on Node networks manually and use Microsoft Project to construct both of them (after changing the default format) with detailed discussion.

3. Present and discuss the scheduling output (e.g. project duration, critical path, critical tasks (change the format of the critical tasks), activities times (ES, EF, LS, LF) and floats (TF, FF). Also, increase the duration of two activities (e.g. activity # 5 and activity # 10) by 7 days and inspect what is the new project duration (without printing of Gantt chart).

4. Discuss and draw the resources (crews/manpower, materials, and subcontractors) profiles (histogram) that are needed to accomplish the work (three histograms for each resource).

5. Discuss and estimate project cost (according to given data), print the cash flow report (Visual Report) and draw the project cost curves.

6. Discuss the reasons behind and the effect of lowering of crews' production rate along with the suggested procedure to improve the production rate.

7. Suggest the procedure to reduce the duration of the project by 20% and use Microsoft Project to construct the Gantt chart after reducing project duration.

Report Proposal

Your proposal should include the following:

Step 1 - Executive Summary/Introduction (approximately 1 paragraph)
The Introduction is the most important section of the proposal - it will either get your reader's attention or send them to the next proposal. To be effective, you want to outline the proposal and convince the reader that your proposal should be accepted. Specifically:
A. State the problem/need that you are going to address.
B. Provide a short description of the project, including what you propose, who it will benefit.
D. Strong concluding statement.

Step 2 - Project Description (Maximum one Page)
This section defines the project objectives, describes the method of solution, and defines staffing and administrative requirements. Include the following sections (each of these sections should have a separate section heading and may have more than one paragraph).
1. Objectives - State your objectives as measurable outcomes of the solution. Be specific - make sure your solution is achievable within a specific time frame and measurable.
2. Method - Describe the specific action items (actions that need to be taken in order to meet the objectives). Answer the following questions: How, When, and Why.
3. Management Plan - Present "Time Plan" Only in your project.

Step 3 - Conclusion (Approximately 1 paragraph)
Review your proposal briefly. Restate what you want to do and why it's important.

Verified Expert

The solution file is done in ms project and prepared report in ms word which explained about project management plan for construction on two levels of building. The ms project has work break down structure, resource details, crews details, cost , gantt chart, time line chart ,resource chart , resource allocation etc. All work of the screen shots are attached in solution. The report has abstract of this project , introduction, deliverable which includes wbs, gantt chart, project cost, network diagram etc and manual calculation , conclusion and references. the references are included as per Harvard format.

Reference no: EM131772736

Questions Cloud

Amount of withdrawn funds at beginning : Find the HPR on? Simon's portfolio during the year ended December? 31, 2017. (Measure the amount of withdrawn funds at their? beginning-of-year value.)
Compute gain or loss and record this refunding transaction : Friedman Company had bonds outstanding with a maturity value of $500,000. Ignoring interest, compute the gain or loss and record this refunding transaction
What is the capital structure weight of equity : The semiannual bonds have a coupon rate of 8% and a yield to maturity of 6%. The tax rate is 40%. There is no preferred stock.
How have you learned about this social movement : How have you learned about this social movement (news articles, social media, social commentary, conversation with others, television news)?
Identify the issues involved in securing productivity gains : ENGG 0004 - Apply basic principles of management to the use of materials, plant and labour on construction projects - Identify the issues involved
What is the weighted average cost of capital : If the corporate tax rate is 37%, what is the Weighted Average Cost of Capital (WACC) for this firm?
Define the alternative hypothesis for the disease : Consider medical tests in which the null hypothesis is that the patient does not have the disease and the alternative hypothesis is that he or she does.
How certain words and tone are utilized to direct opinion : In three brief paragraphs, identify any biases or fallacies you detect and any words the author uses to impart a certain message.
Compute the cost of goods destroyed : King Co. requires an estimate of the cost of goods lost by fire on March 9. Compute the cost of goods destroyed

Reviews

inf1772736

6/23/2018 5:26:02 AM

I was privileged to work with this expert who showed his experience in the subject area with a well-structured assignment. This is the only the website who i'm always inviting for my assignments :)

inf1772736

2/7/2018 4:48:22 AM

4.Discuss and draw the resources (crews/manpower, materials, and subcontractors) profiles (histogram) that are needed to accomplish the work (three histograms for each resource). 5. Discuss and estimate project cost (according to given data), print the cash flow report (Visual Report) and draw the project cost curves. 6.Discuss the reasons behind and the effect of lowering of crews’ production rate along with the suggested procedure to improve the production rate. 7.Suggest the procedure to reduce the duration of the project by 20% and use Microsoft Project to construct the Gantt chart after reducing project duration.

inf1772736

2/7/2018 4:48:14 AM

1.Suggest and discuss the Work Breakdown Structures (WBS) and present it as an organizational chart. 2.Construct Gantt chart and Activity on Node networks manually and use Microsoft Project to construct both of them (after changing the default format) with detailed discussion. 3.Present and discuss the scheduling output (e.g. project duration, critical path, critical tasks (change the format of the critical tasks), activities times (ES, EF, LS, LF) and floats (TF, FF). Also, increase the duration of two activities (e.g. activity # 5 and activity # 10) by 7days and inspect what is the new project duration (without printing of Gantt chart).

inf1772736

2/7/2018 4:46:28 AM

I attached an example of my friend. I hope that your work will be more professional and higher quality. This example just to let writer take idea of how the assignment format should be. Note: I am not sure if this work is meet all requirements, please ask the writer to make sure that they meet all requirements. Waiting for your reply within one hour 26690723_1COURES WOEK MANAGMENENT.docx. Add Gant chart. Make the same steps as you can see in example. I sent the example file just to check the General shape and the sequence of answers. Our assignment must be totally different form the example. Working on MS project should be based on My project data, not from example ! 26690725_126690751 1201-512-109-PHOTO-00000087.jpg 26690711_226690743 2201-112-189-PHOTO-00000088.jpg

inf1772736

2/7/2018 4:42:45 AM

I needed to point out regarding this assignment, You will have to use the MCS SOFTWARE which is used for PROJECT MANAGEMENT. You will need to use the pictures given in the assignment paper which is on page 3. Please acknowledge the same. Unfortunately, only MS Project software should be used for this assignment. & the submission I can postpone it to only 22nd, so pls try your best to finish it on that day, I’ll ask my tutor however if he can allow me to have an extra day in case it wasn't finished on time. But I cant promise that he’ll agree. I already spoke to my tutor & he refused to extend it further than 22nd. I have to submit it by 23rd in the morning 12 am Oman time. Yes sorry, here it is 26690751-PHOTO-00000087.jpg 26690743_220-152-19-PHOTO-00000088.jpg Hi, any updates??? The deadline for my submission is in 7 hours.

len1772736

12/19/2017 4:39:05 AM

GUIDELINES: Follow the guidelines mentioned below for your assignment. ? Assignment should have a Title Page. Title Page should contain the following information. ? Assignment Name ? Class ? Student name ? Student ID ? Use page numbers ? Assignment should be typed in your own words and computer typed using Times New Roman font size 12. ? Heading should be with Font Size 14, Bold, Underline ? Use Diagrams and Examples to explain your topic. ? Copy and paste from the Internet sources is strictly not acceptable and will be treated as a plagiarism and will be dealt with as per polices given below. ? Your report should be submitted as soft copy (.doc formats) through the Moodle. On the other hand, a hard copy on A3 paper for the Gantt chart (max 5 marks out of 100) should be handed over to the instructor.

len1772736

12/19/2017 4:38:53 AM

1. Introduction (maximum 2 page) • Summarize the brief history and theory on that topic. • Outline the case and focus on its significance (problem statement). • Introduce the project • How has the work been done? • Give the general plan of the report. 2. Your Deliverables (maximum 15 page) • Assumption (calendars, WBS coding system, etc.) and the constraints if any. • The work breakdown structures. • The required resources (materials, crews, subcontractors.) histograms. • Project scheduling and cost analysis. • The output of the Microsoft Project (Bar chart, Network view, etc.) • Manual calculations • Discussion

len1772736

12/19/2017 4:38:44 AM

Report Format • The size limit: Normally, contain your report in 15-20 pages of written text plus additional pages for Figures (index). • Follow specified spacing. Generally use 1.5 x line spacing unless advised. • Start with the title page (including your name) or student number as requested. • Include your own field photographs. It is generally better to position figures within the text rather than group them at the end of the report. • Give a sequential number to all figures and tables (Fig. 1, Fig. 2, Fig. 3, Table 1, Table 2, etc.) • Add a brief, informative caption to the figures and to the tables as well. Sections of the Report The Report should contain the following sections: • Introduction • Your Deliverables • Conclusions • References

len1772736

12/19/2017 4:38:37 AM

Tips: 1. Proofread! Check spelling and punctuation. 2. Be clear. Be concise. 3. Remember your goals and audience. Managers look for cost-effectiveness. Engineers look at feasibility. Please keep in mind following facts while writing your report: The report is often used to present, analyze and summarize your data. You will find in the following some basic instructions on how to prepare the report.

len1772736

12/19/2017 4:38:28 AM

• These are some examples, students can propose different topic and do project after instructor approval. • The project start date must be 7th. • Customize the project calendar as only Friday and Saturday are non-working days per week, and 8 working hours per day. • Add holidays as follows: o Oman National Day on18. o Al Nahda Day on 23. • Briefly write the procedures for each operation. • Any missing data can be reasonably assumed.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd