Identify the future functionality of the application

Assignment Help Project Management
Reference no: EM131904780

Assignment

For this assignment you must use the attached documents to complete the following assignment. You have to be able to create a Alpha version of the project.

Part 1: SLP Assignment Overview

When the requirements and design are completed for a project, the coding can begin. A good first step in development is to use the design to create a prototype, or proof of concept for the system. The prototype helps ensure the validity of the design and demonstrates that the basic concepts in the design will provide the desired solution. For this SLP assignment you will use your Design Document from the Case Study to guide the creation of a prototype for your integrated system.

Part 1 SLP Assignment Expectations

The Prototype should address the following requirements:

• The prototype should match the overall design created in the Case Study assignment and should provide evidence that the intended design will work.

• A basic visual interface to support navigation of the program and identify the future functionality of the application.

• No subsystem functionality is required but stubs to connectivity points for subsystems should be identified and have the ability to perform basic functionality tests.

• All code should be well-documented with comments.

• The program should run without significant errors.

• Include a document called operation.docxthat describes how to operate the application.

o This document should provide sufficient information to allow the instructor to set up and operate the application.
o Identify any external system requirements
o Key parts of the application should be identified (i.e., tell the instructor where to find the important parts of the application).
o This document should also provide a summary of how the prototype shows proof-of-concept for the project.
o Include a section called STATUS with a summary of the current status of your project including problems encountered and how they will be addressed. Be sure to contact your instructor if you need help addressing any issues.

Part 2: SLP Assignment Overview

For this SLP assignment you will submit the Alpha version of your project. An alpha version of an application will have the major functionality operational but not fully completed. The purpose of the Alpha version is to ensure the major functional components of the application will work as intended. Your alpha version should have connections established to all outside components and internally developed functionality should be operational at a least a fundamental level.

Part 2 SLP Assignment Expectations

The Alpha version should address the following requirements:

• The application should match the design created earlier in the course with the exception of any changes required to address problems or conform to a revised timeline.

• All major functionality should be operational at least at a minimal level.

• Connections to outside components should be functioning at a basic level to prove they will work for the final version of the application.

• The visual interface should provide access to all major functions of the application.

• There should be a demonstrable, functional connection to the required database for the project.

• All code should be well-documented with comments.

• The program should run without significant errors.

• Include a document called operation.docxthat describes how to operate the application.

o This document should provide sufficient information to allow the instructor to set up and operate the application.

o Identify any external system requirements

o Key parts of the application should be identified (i.e., tell the instructor where to find the important parts of the application and changes that have been made since the last submission).

o Include a section called STATUS with a summary of the current status of your project including work performed since the last submission, problems encountered and how they will be addressed. Be sure to contact your instructor if you need help addressing any issues.

Attachment:- Project-Plan.rar

Reference no: EM131904780

Questions Cloud

Calculate the estimated sharpe ratio of the market portfolio : Create a spreadsheet which calculates the alpha, beta, and firm-specific risk for a portfolio with weights w1, w2, and wM = (1 - w1 - w2).
Identify criteria used for creating effective cybersecurity : Identify criteria used for creating effective cybersecurity policy. Learn what effective measures exist for gauging the nature of a cybersecurity threat.
The difference between policy making and administration : What are some of the possible ramifications if these two overlap in a government public safety related program?
Create a high-level network security policy : Create a high-level network security policy that identifies key network security measures. List of network assets and their use(s)
Identify the future functionality of the application : A basic visual interface to support navigation of the program and identify the future functionality of the application.
How parenting and attachment styles affect therapy : Describe how Carolyn and David fit in terms of authoritarian, authoritative, and permissive forms of parenting.
Summarize the given case in your own words : Paraphrasing of content - Demonstrate that you understand the case by summarizing the case in your own words. Direct quotes should be used minimally.
How many times a week you would like to achieve the goal : Decide how many times a week you would like to achieve the goal. For example, 3x/week. Try to follow your goal chart for one week, recording an "X" when.
Formulate intellectually rigorous strategic management plan : Formulate intellectually rigorous strategic management plans to enable organisations to effectively pursue opportunities and mitigate risks

Reviews

Write a Review

Project Management Questions & Answers

  May lisa recover damages from curtis

Because he did not operate Lisa's automatic watering system properly, everything set out by Curtis had died of water rot. May Lisa recover damages from Curtis? May Lisa recover damages from Jay, and, if so, does Jay have an action against Curtis?

  Top-down versus bottom-up budgeting in the newsgroup

Dilemma is that this can turn into a time consuming negotiation between upper management and field management. Can you please let me know your thoughts on this.

  Describe the different organizational structures

Describe the different organizational structures as it relates to project management (i.e., functional, project-based, matrix) - Discuss at least two (two) different roles that project managers can play in organizational leadership.

  Determining the minimal duration of a project

Gantt diagram showing duration estimates for all tasks and their sequencing (including precedence relations) and highlighting any critical path(s) arising from task dependencies ultimately determining the minimal duration of a project

  Changes to projects scope-schedule and cost impact

Describe how changes to a projects Scope, Schedule and Cost impact a project baseline.

  Determine the project completion time

Using the activity table below, construct a CPM/PERT network noting the activity numbers and durations. Identify the critical path through the network.

  Demonstrate about the effect of poor project

What does case demonstrate about the effect of poor project screening methods on a firm's ability to manage projects effectively - How would project portfolio management help to improve the situation at Keflavik?

  Explaining project budget report

A project budget report is showing our project as spending 35,000 against a budgeted amount of 40,000. What does this report tell you about the project?

  Optimal quality of resources

In no less than one hundred words How would you go about remedying a situation where less than optimal quality of (human) resources

  What is the planned value of the entire project

What is the planned value of the entire project - What is the rate of performance (RP) for each task? Using the RPs obtained, calculate the Earned Value (EV), Schedule Variance (SV), Cost Performance Index (CPI), and Schedule Performance Index (SPI..

  Prepare and construct a gantt chart using the information

BUS353e Project Management. Prepare and construct a Gantt Chart using the information and steps outlined above before resolving any resource conflicts. Present the MS Project Gantt Chart View with columns for Information (i), Task Name, Duration, ..

  Prepare a flowchart of this process

Prepare a flowchart of this process and show opportunities for improving the quality of service in this situation

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd