The Factors of Programme Delay in Construction Industry in Hong Kong

Aims

The aims of this dissertation is to investigate the factors contributing to time overrun and application of time management, techniques for contractors in Hong Kong and to make recommendation for improved practice.

Objectives

The objectives of the study are:

i. Literature review of recent research to identify the techniques used in time management by contractors in Hong Kong

ii. To investigate extent and effectiveness of the application of time management; the techniques/systems used by main contractors in Hong Kong

iii. To identify the factors influencing time management; factors cause programme overrun.

iv. To evaluate, analyze and evaluate the factors contributing to time overrun for contractors in Hong Kong

v. To make recommends for improved cost management for main contractors in Hong Kong for techniques and watch out key factors

1. The aims and objectives need to be re-phrased to indicate the scope of study clearly.

2. The scope of study need to be narrowed down (e.g. major civil construction projects, large scale building projects, or small alteration and additional works etc.) as there is limitation in time and capability of student.

3. Citation to most of the literature search is missing.

4. The literature search has NOT been completed as the following aspects planned in the objectives have not been elaborated:

a. techniques used in time management by contractors in Hong Kong

b. the extent and effectiveness on the application of time management

c. factors leading to overrun of construction projects in Hong Kong

d. ways on improvement of time management for main contractors in Hong Kong.

5. Hypothesis or research questions need to be formulated prior to data collection.

Verified Expert

This dissertation is prepared on the critical factors leading to delay in the small scale residential building civil engineering projects in Hong Kong. The dissertation was developed in 5 different chapters that covered and addressed individual requirements. The complete dissertation is developed in the APA format along with the in-text citations. The solution delivered is as per the requirements and all the instructions as well as comments of the tutor and student are addressed.

Reference no: EM131666351

Questions Cloud

Discuss the various states of criminal process : the court continues to wrestle with right to counsel issues as they pertain to adult non-felony criminal prosecutions, the various states of criminal process
Report-project history of your recent trillo apparel company : This report should include a project history of your recent Trillo Apparel Company District 4 Production Warehouse Move experience over the last five weeks
Atlantic ocean off the coast of florida : Suppose you are a particle of water dropped in the Atlantic Ocean off the coast of Florida. Describe the path you may take to get to one of the following.
Is the data highly inconsistent with the claim : From the 28 tires surveyed, the mean lifespan was 46,500 miles with a standard deviation of 9,800 miles.
Identify the factors influencing time management : Investigate the factors contributing to time overrun and application of time management - The Factors of Programme Delay in Construction Industry
Four types of precipitation processes : Please explain and compare the four types of precipitation processes (Rain, Snow, Sleet, etc. are precipitation types, not the types of precipitation processes)
Define a number of specific ethical obligations : prosecutors have a number of specific ethical obligations in addition to the overarching prosecutorial duty to seek true justice
Discuss a swot analysis and provide a detailed explanation : Discuss a SWOT analysis and provide a detailed explanation of what considerations led to the determination of the SWOT components.
Suppose most of the potable freshwater : Where do you suppose most of the potable freshwater is located? Explain and define.

Reviews

inf1666351

1/15/2018 4:23:49 AM

I have been to a tremendously happy with the finished my dissertation they have accomplished for me. The work has been straightforward, clear, and done rapidly. I was most awed by the way that they gave me a sensible quote which mirrored the measure of work that should have been finished. I was cited strangely high costs for a similar basic task by different services and that is the reason I picked Expertsmind. I am happy that I was right. Thanks team.

inf1666351

12/8/2017 4:03:53 AM

Can you help to consolidate his work with what the tutor has worked on this assignment? same topic, just the expert needs to consolidate my friend's work with the existing work please hold on, I am waiting for the data. thanks here is my friend's work, please consolidate with existing work the feedback from tutor: 1. need to limit the scope to middle or small sized civil engineering government work, don't use a big scope 2. compare private to gov sector, such as procedures for monitoring, control etc which cause delay in government work. can work til 6500 words and give to tutor for further reference. pls, provide the 6500-word work on 12 Nov 5327550_1Program Delay in Construction Dissertation in Hong Kong Autosaved.docx

inf1666351

12/8/2017 4:02:31 AM

I am working on the construction-related project asked by the student. However, I wanted to make sure that the following topic needs to be done: The Factors of Programme Delay in Construction Industry in Hong Kong. As there are two pdf attachments so I just wanted to make sure. I am starting the Factors of Programme Delay in Construction Industry in Hong Kong work from the introduction to the other chapters that will be required. all files here https://drive.google.com/drive/folders/0B53aV2GEzS95ZGttZ3owUGdiRUU?usp=sharing uploaded to new link for your easy reference pdf file is proposal, the two jpg file is comment by tutor write paper based on the proposal and tutor comment it is correct to work on the topic "The Factors of Programme Delay in Construction Industry in Hong Kong" please add the references that have been used Also please notice the format of the paper due to some personal issues i have to drop out the course and cancel the assignment. understand the tutor has spent his time to work. OK i have another classmate who needs an assignment.

len1666351

10/2/2017 7:55:12 AM

all files here Literature review of recent research to identify the techniques used in time management by contractors in Hong Kong

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd