A proposed new three-storey sports centre is to be constructed west of the Knowledge Dock building for the University.
The form of construction of the new centre is to be a large steel frame building, approximately 60m x 40m in plan, clad in super insulated steel panels and with precast concrete floors.
A site investigation has been carried out together with an environmental assessment. The findings are summarised as follows:
“The subsoil at the site is a thick layer of soft alluvial river silts and sands, the bearing capacity of the silt has been found to be in the region of 80 kN/m2. There is a high ground water table present. At the western end of the site to a depth of approximately 3m there are patches oil present and traces of metals such as nickel and zinc, this due to recent industrial processes that were previously undertaken on the site. In addition there are isolated clumps of Japanese Knotweed present in the north eastern part of the site.”
You are an assistant project manager for a large design & build Development Company who is responsible for scheming out the groundworks element of the North Building project.
Describe and explain with the aid of clear labelled diagrams and/or photographs how your company could:
a) Improve the bearing capacity of the silt;
b) Identify the contaminants on site and explain their hazards in relation to the proposed design and its construction. Describe the ‘In-situ’ and Ex-situ’ treatments that could be used and their relative merits;
c) Specify and construct the foundations for the new building, including describing the specific function of any plant that is required.
Select the beam dimensions and reinforcement for a balanced
: A rectangular concrete beam has f'c=3000 psi and steel with fy=40ksi. Select the beam dimensions and reinforcement for a balanced section if the beam sustains a moment as a result of dead load of 60 kip-ft and a moment as a result of live load of 90 ..
|
Estimate the discharge rate of the pipeline
: Reservoir A (water surface elevation = 1300 ft) is connected to reservoir B (water surface elevation=250 ft) by 6,000 ft of 14 inch diameter cast iron pipe (e = 0.005 ft. Neglecting all minor losses
|
Include a sketch of each cross-section drawn to scale
: Problem Statement: A singly reinforced rectangular beam is to be designed, with effective depth approximately 1.5 times the width, to carry a service live load of 2000 lb/ft in addition to its own weight, on a 24 ft simple span. The ACI Code load fac..
|
Design the shear reinforcement
: Problem Statement: A rectangular beam having b = 10 in. and d = 17.5 in. spans 15 ft face to face of simple supports. It is reinforced for flexure with three
|
Identify the contaminants on site and explain
: Identify the contaminants on site and explain their hazards in relation to the proposed design and its construction. Describe the ‘In-situ’ and Ex-situ’ treatments that could be used and their relative merits
|
Briefly outline with the use of neat labelled sketches
: It is proposed to make a new pedestrian access running directly south from University Square to Silvertown. The physical barriers that need to be overcome are the Royal Docks and the City Airport runway.
|
Determine the pressure between the sleeve and cylinder when
: Maximum shear stress both in the tube and sleeve is 16000 psi. Calculate the fluid pressure, and determine the pressure between the sleeve and cylinder when the fluid pressure is absent.
|
What is normally consolidated clay
: Compute the nominal shear strength of an M10 x 7.5 of A 572 grade 65 steel
|
Compute the probable settlement of the building
: The construction of a multi storied building started in January 1989 & was completed in June 1990. The total consolidation settlement of the building was estimated to be 8 cm.
|