Identify resource requirements

Assignment Help Software Engineering
Reference no: EM13328242

The purpose of the BIA is to identify and prioritize system components by correlating them to the business process(es) the system supports, and by using this information to characterize the impact on the process(es) if the system were unavailable.

The BIA is composed of the following three steps:

1. Determine business processes and recovery criticality. Business processes supported by the system are identified and the impact of a system disruption to those processes is determined along with outage impacts and estimated downtime. The downtime should reflect the maximum that an organization can tolerate while still maintaining the mission.

2. Identify resource requirements. Realistic recovery efforts require a thorough evaluation of the resources required to resume business processes and related interdependencies as quickly as possible. Examples of resources that should be identified include facilities, personnel, equipment, software, data files, system components, and vital records.

3. Identify recovery priorities for system resources. Based upon the results from the previous activities, system resources can more clearly be linked to critical business processes and functions. Priority levels can be established for sequencing recovery activities and resources.

Reference no: EM13328242

Questions Cloud

What are company xs capital structure weights on a market : Company X has 4 million shares of common stock outstanding. The current share price is $76, and the book value per share is $5. Filer Manufacturing also has two bond issues outstanding.
Determine how much work is done by the horizontal force : A box is pushed a distance d along a ramp at a constant speed by a horizontal force, Fa. how much work is done by the horizontal force
Find the direction of the second part : A rocket of mass 7 kg moves with a constant velocity of 547 m/s eastward. It suddenly explodes and scatters into two pieces. find the direction of the second part
Explain what will the cell potential be when the : The value of E for the following reaction is 0.34 V. What will the cell potential be when the [Cu2+] =10 M and the [Cr3+]=1 M? 2Cr(s) + 3 Cd 2+ (aq) --> 2Cr3+ (aq) + 3Cd(s) a)0.31 b) 0.46 c) 0.4 d) 037 e)0.28
Identify resource requirements : The purpose of the BIA is to identify and prioritize system components by correlating them to the business process(es) the system supports, and by using this information to characterize the impact on the process(es) if the system were unavailable.
Calculate the gravitational acceleration it produces : A roughly spherical volume of rock 2.1 km in radius is 30% denser than the surrounding rock, calculate the gravitational acceleration it produces at Earth's surface
Determine what will happend to the exchange rate : if japan has low inflation and mexico has high inflation, what will happend to the exchange rate between the Japanese Yen and Mexican Peso.
Explain varying mixtures of dioxane and water as solvent : Optically pure 2-octyl sulfonate, a compound with a leaving group comparable to the tosylate and mesylate groups discussed in this chapter, was treated with varying mixtures of dioxane and water as solvent
What is the ball clea the net : Player serves a tennis ball 2.2 m above the ground. The ball leaves his racquet with a speed of 56 m/s at an angle 10 degree below the horizontal. what's the ball clea the net

Reviews

Write a Review

Software Engineering Questions & Answers

  Explain changes needed to implement the new functionalities

Analysing and designing the changes needed to implement the new functionalities in the sample solution. Before we can start the implementation we need to analyse the project and describe the changes we will be implementing

  What is the pattern in the optimal allocation

What are the optimal production quantities for the company? What is the pattern in the optimal allocation?

  Identify the challenges regarding information flow

Identify the challenges Lexmark faced regarding information flow. How were the information flows provided before and after implementation of the system? Identify the decisions supported by the new system.

  Role of systems analyst in system development life cycle

What are the primary responsibilities of a system analyst? What skills do system analysts need? Discuss the role the systems analyst plays in the system development lifecycle.

  Question about programming languages

Various contemporary languages permit two kinds of comments, one in which delimiters are used on both ends, and one in which delimiter marks only the starting of the comment, Discuss the advantages and disadvantages of each.

  Explaining software engineering in detail

Select a topic related to some aspect of Software Engineering. Draft a 2500+ word (minimum) paper on that topic - single spaced 12 pt times or times new roman font.

  Analyze error propagation

Analyze an architecture to determine whether the schedule is likely to be met and analyze error propagation

  Erp project implementation

Based upon the preliminary information developed by CCC (Toledo Pizza Company - ERP Implementation (A)) and further analysis using benchmarking information, the following information became available:

  Draw an entity-relationship for jcbc

Each team plays two games (home and visitor) against each of the other teams during the season and the score needs to be captured. Draw an entity-relationship for JCBC (in 3NF).

  Create a project transition plan

When a project is ready to be deployed, a transition plan can help the transfer of ownership from the project team to the customer or organization that requested the project.

  Recognize possible use cases-actors to make use case diagram

Recognize possible use cases and actors, and create use case diagram for Personal Trainer information system. Choose one of the use cases and create a class digram.

  Identify the data type for variable

Assume you manage a dog walking service, in which you interact with both clients and dog walkers. Your task is to schedule dog-walking appointments based on the customers requested dates and times and the availability of the dog walkers.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd