Identify potential opponents of the project in the authors

Assignment Help Basic Computer Science
Reference no: EM13680447

Consultants' review of an information and communications technology infrastructure and information system plan (Group Project)

The group project that you have been developing during the previous four weeks is approaching its end. Now, a group of external consultants is going to read it and advise you with potential improvements. At the same time, your group will serve as consultants to another project inside your class.

Notice that the consultants are here to help in the project's successful implementation. Your approach to this role should be positive and proactive; you are here to offer your advice to all of its aspects for the project's overall improvement. It is the privilege of the authors to refuse your recommendation(s), but the reasons should be explained. It also means that your group should discuss the proposals of your consultants and express your position to them. If you are not willing to accept the proposals, you should explain why. Your consultants may then clarify their arguments.

The discussions between authors and consultants will be done in a special thread in the Discussion Forum. There will be a shared thread per project.

These are the consultants' duties:

1. Critically read your assigned project as soon as it appears in ST. If you do not understand any issue or argument ation, do not hesitate to ask its authors for their explanation. Post your question in ST.

2. Formulate your individual evaluation and post it inside your GF before Sunday of Week 7. It should specify: 1.Does the partner group project serve as a good starting point to their planned change?

2. Identify its weaknesses and strengths and explain why you identify them as such. Whenever possible, propose suggestions for improvements.

3. Identify potential opponents of the project in the authors' organisation. Propose a strategy to minimise their concerns. 

3. Coordinate your position with the rest of your group. Read their evaluations no later than on Monday of Week 7. Organise your group chat.

4. Your group has to prepare its coordinated review document: 1.Express your opinion on the assigned project's quality, strengths and weakness.

2. Propose a series of recommendations to increase its quality. Among all issues raised by the members of your group, select three or four as the most important. At least one of them must address resistance to change (i.e. Item 2c in your individual evaluations). 

5. Post your group's collective review into ST before the end of Week 7. Submit only one review per group.

6. During Week 8, wait for the authors' reactions to your review. Discuss the reactions with them, focusing on what you think are the most important reactions. Be aware that the authors may or may not accept your proposals. In the latter case, be prepared to explain your reasons and their advantages. 

These are the authors' duties:

1. Your consultants' questions can appear at any point after posting. Be ready to respond to them in ST throughout Week 7.

2. Your consultants have to prepare their written review and post it to ST before the end of Wee k 7.

3. Read the review as soon as possible. Prepare your individual standpoint-a list of possible reactions to the reviewers' items-and post it in your GF no later than on Friday of Week 8.

4. Coordinate your reactions to the review with the rest of your group. Read their lists. No later than Saturday of Week 8, organise your group chat-a brainstorming session.

5. Your group should incorporate (at least some of) the reviewers' comments. During brainstorming, discuss your positions. Decide which suggestions to accept, which to reject and which to modify to fit better to your particular conditions.

6. Based on your brainstorming outcomes, modify your project in order to meet your consultants' proposals. 1.Distribute the modifications among the group members.

7. Do not hesitate to ask the consultants to clarify any issue in their review that may help you in meeting their expectations.

8. Explain to your consultants your reasons for not accepting thos e of their suggestions in the section you are responsible for.

8. Your final document with the changes must be posted to ST before the end of Week 8. 

Note: All project threads are open to everyone. For your inspiration and comparison, you are welcome to read other projects, too.

Reference no: EM13680447

Questions Cloud

Transparent tape becomes charged when pulled from dispenser : Common transparent tape becomes charged when pulled from a dispenser. If one piece is placed above another, the repulsive force can be great enough to support the top piece\'s weight. Assuming equal point charges (only an approximation), compute the ..
Atomic models held that the orbital velocity of an electron : Some of the earliest atomic models held that the orbital velocity of an electron in an atom could be correlated with the radius of the atom. If the radius of the hydrogen atom is 5.29*10 -11 m and the electrostatic force is responsible for the circul..
What is the current density in the wire : The starter motor of a car engine draws an electric current of 26.0 A from the battery. The copper wire to the motor is 4.60 mm in diameter and 1.34 m long. The starter motor runs for 0.85 s before the car engine starts up. How much electric charge p..
What were the initial charges on the spheres : Two identical conducting spheres, fixed in place, attract each other with an electrostatic force of -0.4545 N when separated by 50 cm, center-to-center. The spheres are then connected with a thin conducting wire. When the wire is removed, the spheres..
Identify potential opponents of the project in the authors : Critically read your assigned project as soon as it appears in ST. If you do not understand any issue or argument ation, do not hesitate to ask its authors for their explanation. Post your question in ST.
Hung from spring balance attached to ceiling of elevator : Object is hung from a spring balance attached to the ceiling of an elevator. The balance reads 56 n when the elevator is standing still. What is the reading when the elevator is moving downward with a constant speed of 6.4 m/s?
What is the pressure at the bottom of the tank : A large tank of water is full and has a depth of 10.0 m. What is the pressure at the bottom of the tank? What would the velocity of the water be if the tank was opened at the bottom? A Two balloons of identical volume (radius 11.5 m) are filled with ..
Discover the speed of electron when it strikes second plate : A uniform electric field exists in the region among two oppositely charged plane parallel plates. An electron is released from strikes the surface of the opposite plate and rest at the surface of the negatively charged plate, 3.70cm distant from the ..
Decide magnitude of electric field at point inside sphere : A solid, insulating sphere of radius a = 2 cm has a total charge Q = 10 nC which is uniformly distributed. Using Gauss's Law decide the magnitude of the electric field at a point inside sphere which is 1 cm from its center.

Reviews

Write a Review

Basic Computer Science Questions & Answers

  What properties can be added in referential integrity

What properties can be added in referential integrity

  Transport layer

Transport layer

  You can add require to any of the input types. true or false

You can add require to any of the input types. True or false

  Why ratings for high quality pages must all get same rating

Ratings for high quality pages should all get the same rating. For example, a high quality page for a common interpretation of the query should get the same rating as a high quality page for a minor interpretation of the query.

  Kinds of system-building methods used by dorfman

Recognize the kinds of system-building methods used by Dorfman to create its wireless warehouse system. Explain the methodologies you would recommend

  Describe findings after conducting internet search for cde

The network administrator mentions that other ".cde" files have been sent through an FTP server to another site. Describe your findings after conducting an Internet search for ".cde" files.

  Why information technology is a business pressure

Explain in detail why Information Technology (IT) is a business pressure and also an enabler of response activities.

  Following class definition

Given the following class definition, describe the type of variables used by the arguments and return values of the following member functions (values, pointers, or references):

  Demonstrate skills in drawing tools

To begin to combine and demonstrate skills in drawing tools, tweens, working with text, and telling a story

  Can someone help me with chapter exercise number

Can someone help me with Chapter 1 exercise number 5

  Explain worst possible reports from system

Imagine worst possible reports from a system. What is wrong with them? Write as many problems as you can. What are the consequences of such reports?

  Three major information security threats

Write a 1,000- to 1,500-word essay on at least three major information security threats that a specific organization you choose faces today.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd