Identify possible network infrastructure vulnerabilities

Assignment Help Project Management
Reference no: EM132805186

Network Infrastructure and Security

Overview

This assignment consists of two sections: an infrastructure document and a revised project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and/or assume all necessary assumptions needed for the completion of this assignment.

With the parameters set forth at the onset of the project, present the infrastructure and security policy that will support the expected development and growth of the organization. The network solution that is chosen should support the conceived information system and allow for scalability. The network infrastructure will support organizational operations; therefore, a pictorial view of workstations, servers, routers, bridges, gateways, and access points should be used. Since the company will be merging with a multinational company, virtualization and cloud technology should be taken into consideration. In addition, access paths for Internet access should be depicted. A narrative should be included to explain all the nodes of the network and the rationale for the design. Lastly, using the Confidentiality, Integrity and Availability (CIA) Triangle, define the organizational security policy.

Instructions

Section 1: Infrastructure Document

Write a 5-10 page infrastructure document in which you:

1. Identify possible network infrastructure vulnerabilities. Address network vulnerabilities with the appropriate security measures. Ensure that consideration is given to virtualization and cloud technology.

2. Design a logical and physical topographical layout of the planned network through the use of graphical tools in Microsoft Word or Visio, or an open source alternative such as Dia. Explain the rationale for the logical and physical topographical layout of the planned network. Note: The graphically depicted solution is not included in the required page length.

3. Illustrate the possible placement of servers, including access paths to the Internet and firewalls. Note: facility limitations, workstations, printers, routers, switches, bridges, and access points should be considered in the illustration.

4. Create and describe a comprehensive security policy for the company that will:

1. Protect the company infrastructure and assets by applying the principals of CIA. Note: CIA is a widely used benchmark for evaluation of information systems security, focusing on the three core goals of confidentiality, integrity, and availability of information.
2. Address ethical aspects related to employee behavior, contractors, password usage, and access to networked resources and information.

Section 2: Revised Project Plan

Use Microsoft Project to:
1. Update the project plan (summary and detail) template, from Project Deliverable 4: Cloud Technology and Virtualization, with 3-5 new project tasks each consisting of 5-10 subtasks.

Attachment:- Project Deliverable.rar

Verified Expert

This project includes the development of a project plan for network infrastructure and security. Here we have analysed the given case study and identified the major tasks involved in the network infrastructure project. Then we have developed the revised project plan based on the current scenario using MS project software tools. The revised project plan includes the revised schedule, revised resource allocation and revised project costs etc.

Reference no: EM132805186

Questions Cloud

What are the primary capabilities of each of the basic modes : What are the primary capabilities, advantages, of each of the basic modes. The primary capability of the road transportation as the carriers
Discuss morbidity and comorbidity of the disease : Develop a questionnaire by utilizing your knowledge of health and illness, with the aim of acquiring all information you need from patients to prepare a plan.
What are the primary capabilities of direct distribution : What are the primary capabilities, advantages, and disadvantages of direct distribution, DCs, and cross-docks? Bypass distribution facilities to fulfill retail
What is its return on stockholders equity : Network Communications has total assets of $1,760,000 and current assets of $642,000. What is its return on stockholders equity
Identify possible network infrastructure vulnerabilities : Identify possible network infrastructure vulnerabilities. Address network vulnerabilities with the appropriate security measures. Ensure that consideration
Describe the major challenges faced by distribution managers : Describe the major challenges faced by distribution managers in the current environment. Speaking of personnel, recruiting and maintaining qualified
What would be some of the the difficulties will face : There are a lot of individuals that have addictions, whether they are drinking alcohol, eating chocolate, gambling on blackjack, buying plaid sport coats.
Discuss the primary tradeoffs : Discuss the primary tradeoffs that must be made between distribution and logistics activities. Determining the number of facilities needed for a supply chain
Describe adornos views on standardization : Describe Adorno's views on standardization and pseudo-individualization. Share a unique example from pop culture (movies, songs, books, etc.) that follows.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd