Identify and specify the steel framing system

Assignment Help Civil Engineering
Reference no: EM133678934

Prepare detailed design of civil steel structures

Assessment Task 

In this activity, you must discuss with the site supervisor to obtain the structure design and report on the work requirements.

Role of the participants

Site Supervisor
Your classmates will act as the site supervisor with whom you will have a meeting to obtain the site designs and steel structure designs. The person will also provide information about the work requirements and tasks that must be performed. The person will also clarify the work activities and provide confirmation as well.

Design Manager
You will act as the design manager who will obtain the site design and steel structure design from the site supervisor. You will also access documents such as organisational policies, procedures, and standards associated with civil construction.

You will access and interpret the documents gathered and seek clarification from the supervisor where required. While reading the documents, you must also prepare a design plan to meet the resources and design requirements.

You will use Autodesk to prepare the steel structure's design plan after interpreting and clarifying the doubts from the documents gathered from the supervisor.

For this activity, you are required to complete the following:
• Gather documents from the supervisor
• Seek clarification about the documents
• Gather information about the work activities
• Obtain confirmation about work activities and if it is compliant
• Prepare design plan as per requirements
Resources required
Your trainer will provide you with the following documents and software:
• Autodesk
• Plans
• Drawings
• Specifications
• Design briefs
• Engineering surveys
• Geotechnical information
• Hydrological, meteorological, cultural and heritage data
• Test results of construction materials for civil steel structures
• Data for selecting options for civil steel structures
You will be required to complete and/or attach.
You will be required to complete the meeting with the site supervisor and prepare the design plan using Autodesk.

Template 1: Design plan

TASK Instructions
Your task is to prepare the following documentation drawings and specifications. Please refer to the sketch below as a guideline.

Obtain information and data for the civil steel structure design, analyse and interpret the information, and sketch some design options before discussing your options with the Supervisor. Your Supervisor will make a recommendation and assist you with the final design so you can then commence the Required drawings and specifications.

Once the final sketch design is approved, complete the drawing below. Once the drawings have been completed, they will be reviewed with the relevant stakeholders (i.e. Supervisor (Trainer), council authority (student colleagues)), and feedback will be given.

Once you have contributed to the design verification and all stakeholders are satisfied with your final design, confirmation will be given.
Your stakeholders (i.e. colleagues) will complete a performance review on completion and approval of your design.

The sketch design of the factory that has been provided is to be amended following the instructions in the information below and as instructed. Note that this information will also be required to prepare the engineering detail drawing and the architectural drawings of the factory that comprise the remainder of the documentation exercises in this subject.

Reference no: EM133678934

Questions Cloud

What are eligibility requirements to take the cbcs exam : What are the eligibility requirements to take the CBCS exam? Feel free to include any advice or tips to encourage classmates to prepare for and take NHA exam
What are some of the key advantages of free markets : What are some of the key advantages of free markets in fostering economic development and the advancement of society?
Completing either diversity project or customer project : Six employees are completing either a diversity project or a customer project. Each of the six employees- Beatrice, Thomas, Richard, Charlene,
What will you do to ensure that your organization maintains : How might trust be lost and reputation damaged? What will you do to ensure that your organization maintains a positive reputation in the community?
Identify and specify the steel framing system : RIICWD534E Prepare detailed design of civil steel structures - Identify and document the facilities and room heights of the commercial building in accordance
How will the concepts enable you to contribute : How will these concepts enable you to contribute to the greater social good in your industry and within the community?
Specialize in ready-to-assemble modernist pieces : Fictional company AEKI owns forest land, lumber mills, and furniture outlet stores that specialize in ready-to-assemble modernist pieces.
Compare conventional fuel system : Explain difference between diesel, petrol and alternative fuel systems. Compare a conventional fuel system with that of an alternative fuel/power source
What is the profile and what are its uses : Methods for evaluating possible capital projects, in terms of their possible benefits to the firm? What is the profile and what are its uses?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the specific work and heat transfer

Water at 1000 kPa, 250?C is brought to saturated vapor in a piston/cylinder with an isothermal process. Find the specific work and heat transfer. Estimate the specific work from the area in the P-v diagram and compare it to the correct value.

  At what temperature does the liquid solidify

What is the composition of this last remaining liquid phase?

  Calculate the max tension and min tension of cable

The Golden Gate Bridge has a main span of 4200 ft, a sag of 470 ft, and a total static loading of 21,300 lb/linear foot. Calculate the max tension, min tension, and the total length of cable.

  Determine the inlet volumetric flow rate for the ammonia

The magitude of the power input to the compressor is 7,5kW and there is heat tranfser from the compressor to the surroundings at a rate of 0.15kW. Kinetic and potential energy are negligible.

  Environmental impact of construction projects

Analyse the main forms of civil engineering contracts and procedures and apply them to a given task - Critically assess the environmental impact of construction

  Determine the upward velocity v of the load m

For the pulley system shown, each of the cables at A and B is given a velocity of 2 m/s in the direction of the arrow. Determine the upward velocity v of the load m.

  What is the hydraulic conductivity of the aquifer

An experiment was conducted to determine the hydraulic conductivity of an artesian aquifer. The piezometric heads at two points 150m apart were found to be 55 m and 48.5 m above a datum.

  Estimate critical pressure of mixture of methane nd n-hexane

Estimate the critical pressure of a mixture of methane and n-hexane if the critical temperature of the mixture is known to be 200 F. Compare your answer with the critical pressures of pure methane and pure n-hexane.

  Determine the maximum distortion energy theory of failure

At a certain location on the surface of an engineering component, the material is in a state of plane stress with principal stresses of fmax = 150 MPa and fmin = 50 MPa (both tensile). If the yield strength of the material is Y = 350 MPa

  What is the maximum tensile stress

A 20-foot long W8X67 is suspended from one end. If the modulus of elasticity is 29,000ksi, determine the following.

  Determine the discharge per unit width of the aquifer

From two observation wells 200 m apart, theobserved water table elevations are 11 and 7 m measured form the bottom of the stratum. Determine the discharge per unit width of the aquifer.

  Stainless endplate connection under tension

Endplate connection is commonly used in steel structures. Replacing the conventional carbon steel endplate by stainless steel endplate can greatly increase

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd