Reference no: EM131223291
Create Preventative Controls for SunGrafix, a video game design company. In some cases, the outage impacts identified in the BIA may be mitigated or eliminated through preventive measures that deter, detect, and/or reduce impacts to the system. Where feasible and cost effective, preventive methods are preferable to actions that may be necessary to recover the system after a disruption. Preventative controls include the identification of effective contingency planning preventive controls and maintaining these controls on an ongoing basis.
Identify and incorporate a variety of preventive controls into your BCP. Some of the listed controls are the following:
Appropriately sized uninterruptible power supplies (UPS) to provide short-term backup power to all system components (including environmental and safety controls);
Gasoline- or diesel-powered generators to provide long-term backup power;
Air-conditioning systems with adequate excess capacity to prevent failure of certain components, such as a compressor;
Fire suppression systems;
Fire and smoke detectors;
Water sensors in the computer room ceiling and floor;
Heat-resistant and waterproof containers for backup media and vital non electronic records;
Emergency master system shutdown switch;
Offsite storage of backup media, non-electronic records, and system documentation;
Technical security controls, such as cryptographic key management; and
Frequent scheduled backups including where the backups are stored (onsite or offsite) and how often they are recirculated and moved to storage.
Identify current and emerging factors which drive customer
: The PEST scan can be used by vendors (sellers) in an industry to identify current and emerging factors which drive customer demands and requirements for technologies, products, and services. Once the relevant market factors are identified, vendors..
|
Restore the original long run equilibrium of the economy
: Explain why monetary policymakers cannot restore the original long-run equilibrium of the economy if, in the short run.
|
What are the deliverables at analysis phase
: System analysis and design. 1. What are the deliverables at analysis phase? 2. What is the difference between the close-end and open-end question?
|
Define the term stabilization policy
: Define the term stabilization policy and describe how it can be used to reduce the volatility of economic growth and inflation.
|
Identify and incorporate a variety of preventive controls
: Identify and incorporate a variety of preventive controls into your BCP. Some of the listed controls are the following: Appropriately sized uninterruptible power supplies (UPS) to provide short-term backup power to all system components (including ..
|
Source for new it equipment
: Consider a case where you have a new company and you need to source for new IT equipment and use it to build a proper IT infrastructure. Explain HOW each of the first four drivers will become a reality in your company.
|
How stable will the collector voltages
: Assume Vcc = 15 and Vee = -15 volts. How stable will the collector voltages be for changes of transistor (all 2N3904), and for temperatures from 0°C to 75°C? Is this a stable biasing scheme and are the resistor values suitable
|
Discuss the levels of the cmmi process
: 1. Name and Describe two (2) U.S. based compliance laws that exist. 2. Discuss the levels of the CMMI process improvement approach.
|
Describe the use of input and output devices connected
: Describe the use of input and output devices connected to these processor platforms. Include handheld IO devices, document scanners, bar code readers, etc.
|