CPCCBC4007A Plan building or construction work
Assessment Task 1 Part 1 - Knowledge Questions
1. When reviewing the contract prior to commencing the project list two (2) unusual aspects for each of the following:
a. Construction
b. Use of materials
c. Penalties
2. List five (5) aspects you need to address to organise operational requirements of the project prior to commencement of buildings:
3. Describe how you would control and record site deliveries.
4. List four (4) organisational procedures you must implement prior to commencement of building work:
5. Sequence the best strategy for construction operations, include all the steps from reviewing the contract to updating the schedules.
6. List two (2) methods for producing a project schedule.
7. Identify a type of hazardous building waste and how do you remove it in accordance with EPA requirements?
8. Explain what the term ‘critical path' means in relation to a building project.
9. List a minimum of four (4) resources that need to be organised prior to commencement of building work:
10. Explain how you would manage building works in multiple projects/sites.
11. List any two (2) factors that can cause project delays and how do you account for these delays?
12. Explain what condition reports are used for and who gets a copy of the report?
13. List two (2) temporary services that are needed on-site?
14. Research and list any one (1) building and construction industry standard, code or regulation and its key points.
15. List and explain two (2) types of contracts that are used in building and construction industry.