Hypothetical velocity distribution in a horizontal channel

Assignment Help Civil Engineering
Reference no: EM1385200

The hypothetical velocity distribution in a horizontal, rectangular open channel is V=0.3y (m/s), where V is the velocity at a distance y (m) from the bottom of the channel. If the vertical depth of flow is 2 m and the width of the channel is 4 m, what are the maximum velocity, discharge, and mean velocity?

Reference no: EM1385200

Questions Cloud

Calculate the expected exchange rate : Use a properly labelled IS-LM graph to analyze and illustrate the effect and calculate the expected exchange rate for the end of the year.
Ron does not make a payment on his car loan for few months : Ron does not make a payment on his car loan for several months. The dealer, Star Auto, repossesses the car by towing it from a public parking lot. Ron sues Star for breach of the peace. Ron will probably
Question on workplace issues : Express your views on value your input to execute change is within your organization. Discuss how you handle work conflict with fellow co-workers when it arises? Discuss the morale of the workplace 10 years ago.
Calculate the takt time for the scenario in a system : Calculate the takt time for the scenario in a system where the total time per shift is 460 minutes, there is two shift, and workers are given one 15-minute break and 30 minutes for lunch
Hypothetical velocity distribution in a horizontal channel : The hypothetical velocity distribution in a horizontal, rectangular open channel is V=0.3y (m/s), where V is the velocity at a distance y (m) from the bottom of the channel. If the vertical depth of flow is 2 m and the width of the channel is 4 m,..
What is the potential energy of the sphere : Compared to an object that does not roll, other than instead slides without friction, should a rolling object be released from same, a greater, or a lesser height in order just barely to complete the loop the loop.
Support desktop computers in small company : Static IP address of server is 192.168.45.200. Employees will open their Web browser and enter personnel.mycompany.com in URL address box to browse Web site.
Obtain what you are seeking from negotiations : Is it ever justified from an ethical standpoint to deceive someone in explained how you utilize tactics in order to obtain what you are seeking from negotiations?
Compute the takt time for a service that intended to perform : Compute the takt time for a service that intended to perform a standardized service. The system will have a total work time of 480 minutes per day

Reviews

Write a Review

Civil Engineering Questions & Answers

  Resultant force from all fluids

A tank is filled with oil (specific gravity 0.8) and water to a depth of 10 meter and 6 meter respectively. Find the resultant force from all fluids acting on the gate of 1.8 meter by 9 meter.

  Smallest standard commercial pipe

For satisfactory operation, the static pressure at the pump inlet must not be lower than -6 m of water gage. Determine the smallest standard commercial pipe that will give the required performance.

  Evaluate the pressure head at point

Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay

  Runoff rate into the inlet grate

If the detention storage on the paved section is increasing at the rate of 60 m3/hr, what is the runoff rate into the inlet grate?

  Magnitude of the acceleration of the train

The train passes point A with a speed of 30 m/s and begins to decrease its speed at a constant rate of at = - 0.25 m/s2. Determine the magnitude of the acceleration of the train when it reaches point B, where sAB = 412 m.

  Equal-tangent crest vertical curve

An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?

  Measure the distance pa, pb, pc

Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.

  Aggregate in the wheelbarrow weight

You fill a 2-cubic foot wheelbarrow to the top with aggregate. if the specific gravity of the aggregate is 2.548 and 18% of the aggregate is void spaces, how much does the aggregate in the wheelbarrow weight?

  Determine the stress state at points a & b

CE 3303 – Solids – MWF – Spring 2014 - Homework Set 23, – The pipe shaft of the auger, rotating at a constant angular velocity, is subject to the axial force and torque shown. Determine the stress state at points A & B and show on a stress element.

  Operational changes to prevent river from contamination

assuming that the contaminant travels mainly by advection, propose any operational changes to the given layout to prevent the river from being contaminated.

  Four-lane undivided multilane highway

A four- lane undivided multilane highway ( two lanes in each direction) has 11- ft lanes and 5- ft shoulders. At one point along the highway there is a 4% upgrade that is 0.62 mi long.

  Determining the pumping rate

Determine the required pumping rate. the aquifer has T= 1600 m 2 /day and the wells each have radius of influence of 600m.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd