Hydrograph for a watershed having a drainagearea

Assignment Help Civil Engineering
Reference no: EM1382284

For the data given below, derive the 2-hr unit hydrograph for a watershed having a drainagearea of 216 km^2, assuming a constant baseflow of 20 m^3/s. 

Calculate and plot the S-curve and unit hydrographs for 4-hr and 8-hr.

Calculate and plot the direct runoff and streamflow if the following excess precipitation was found: 2 cm at 2 hr; 3.0 at 4 hr; and 1.0 cm at 6 hr.

Reference no: EM1382284

Questions Cloud

What would be the cars stopping distance for a dry pavement : A gas increases in pressure from 2.0 atm to 6.0 atm at a constant volume of 1.0 m3 and then expands at constant pressure to a volume of 3.0 m3 before returning to its initial state. How much work is completed in one cycle.
Describe the company''s innovation process : Describe the company's innovation process, including all stages and gates. If the company doesn't have an innovation process, provide a recommendation for one that includes all stages and gates.
How far does it stretch the spring : A child on a freely rotating merry-go-round moves from near the center to the edge. Will the rotational velocity of the merry-go-round increase, decrease, or not change at all? Explain.
Why is it important for managers to reduce the resistance : Why is it important for managers to reduce the resistance to change openly displayed or covertly practiced by employees?
Hydrograph for a watershed having a drainagearea : For the data given below, derive the 2-hr unit hydrograph for a watershed having a drainagearea of 216 km^2, assuming a constant baseflow of 20 m^3/s.
What is the normal force exerted by the snow on skier : Answers for an elevator are moving down with an acceleration of 3.360 m/s. what would be the apparent weight of a 64.20 kg man in the elevator.
Full-duplex trunk between end office-intermediate switch : In a simple telephone network comprising of two end offices and one intermediate switch with 1-MHZ full-duplex trunk between each end office and intermediate switch.
Densepack company produces disk drives for mainframe : Densepack company produces disk drives for mainframe computers. The following information is given for optimizing their workforce level
What is the tension in the net : An astronaut weighs 7*10^2 N on the surface of the earth (M earth=5.98*10^24 kg). What is her weight 7.70*10^6 m above the earth.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Calculate the rotation at point a and b using virtual work

Draw the FBD and the shear and bending moment diagrams. Label all minimums, maximums and zero crossing points as well as the slopes as constant, linear or parabolic.

  Resulting center of gravity

The section of the plywood in the 3rd quadrant is sawed off and the resulting piece is then glued squarely over the 4th quadrant portion of the plywood with glue of negligible weight.What are the x- and y-coordinates of the resulting center of gra..

  A sewage treatment works stw

A sewage treatment works (STW) with 4 single-stage trickling filters has become organically overloaded due to the discharge of a biodegradable industrial effluent to the STW. This is causing effluent to pond on the surface of the filters.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Total energy per unit weight of fluid

A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..

  Writing case study about bridge collapse

Writing case study about bridge collapse

  Design a three story office building

Design a three story office building

  Measure the distance pa, pb, pc

Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.

  Evaluate the pressure head at point

Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay

  Water system design

Determine the corresponding error in the computed discharge

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd