HUSKY AIR ASSIGNMENT-PILOT ANGELS

Defining the Project Infrastructure

Husky Air's management has decided that building a custom information system will provide the most value to its organization. Your team has been asked to continue with the project and develop this system.

The first step before planning the details of the project's schedule and budget requires that you define an infrastructure for your project. The infrastructure is the foundation for the project charter. Knowing what resources you need or are available and their associated cost will directly influence your schedule and budget esti¬mates. This will entail defining the stakeholders of the project and the resources that will be required.

This would also be a good chance for you and your team to do another learning cycle. Read through this assignment first and then meet as a team to develop a Project Team Record and an Action Plan. This will help to improve team learning and to assign responsibilities to complete the assignment.

Please provide a professional-looking document that includes the following:

1. The project name, project team name, and the names of the members of your project team.

2. A brief project description.

3. The project's MOV. (This should be revised or refined if necessary.)

4. A list of the resources needed to complete the project-

This should include:

a. People (and their roles)-Your team is responsible for planning the project. However, the project may need additional individuals with both technical and nontechnical expertise to develop the system.

b. Technology-In the previous assignment, you estimated the hardware, network, and software needs for a system to support your client. You will also need various hardware, network, software, and telecommunication resources to support the project team.

c. Facilities-Husky Air has limited space. The project team will have to do most of its project simteje. and development work at a different

d. Other-For example, travel, training, and so on.

5. An estimate for the cost of each resource-Use the Internet, trade journals, or any other sources. For example, if you need to hire a programmer, then you could use job postings or salary surveys as a basis for an annual base salary or hourly wage. The people who work on the project (including you and your team) will be paid a base salary or hourly wage plus benefits. Therefore, the cost of any people on your team will be a base salary (the person's gross income) plus an addition 25 percent paid out in benefits. Be sure to include a reference for all the sources you use.

6. Since you will be paid for your work with Husky Air, decide which contract makes the most sense for you and your client. Be sure to support your recommendation.

a. Fixed price or lump sum
b. Cost-reimbursable
    i. Cost-plus-fee or cost-plus-percentage-of-cost
   ii.Cost-plus-fixed-fee
  iii. Cost-plus-incentive-fee
c. Time and materials

7. This would also be a good opportunity to revisit the team charter you created in your first assignment. As a team, decide if anything has changed or needs to be updated.

Verified Expert

It is a 600 words task that wanted to develop a short Project Plan and possibly other supporting documents that demonstrate a sensible and convincing approach to NHMRC in its replacement of the RGMS. NHMRC manages grant application rounds using an ageing software system called the Research Grants Management System (RGMS). In 2016, with the help of Apis, NHMRC approached the market with a Request for Expressions of Interest (REOI) for replacement of its RGMS.

Reference no: EM131620756

Questions Cloud

Discuss cause and effect on the behavior of choppa : Choppa Chanelle is a Husky Dog that has been with her owner since she was 6 weeks. Since the first time the family got her
Strongest pieces of evidence : In studies so far regarding the life of Jesus, what do you believe are the strongest pieces of evidence found in the Gospels supporting the claims regarding Him
Mississippi black codes : From the information included in the 'Mississippi Black Codes'. During the reconstruction, Black Codes were enacted in several former states in the Confederacy.
Find the total number of feet in all the boards : Rob Farinelli is building a gazebo and plans to use for the floor two boards that are 10(3/4) feet, four boards that are 12(5/8) feet.
Husky air assignment-pilot angels : Improve team learning and to assign responsibilities - HUSKY AIR ASSIGNMENT-PILOT ANGELS - building a custom information system
Did jefferson betray his political principles : Did Jefferson betray his political principles? Explain thoroughly. Why was Marburry v. Madison such an important court case?
Exploiting the lower classes : During the Victorian Age the upper class became very wealthy in part by exploiting the lower classes.
What is the smallest sheet of brass required to cut plates : Tenisha Gist cuts brass plates for an engraving job. From a sheet of brass, three pieces inches wide and two pieces 7(3/8) inches wide are cut.
How did the economic transformations of the period : How did the economic transformations of the period 1800-1850 alter American society and everyday life? In what ways was life unique for Americans living.

Reviews

inf1620756

10/13/2017 5:17:04 AM

This is a great budget assignment and l really appreciates all of your efforts to get this assignment done on time. Thanks....

inf1620756

9/7/2017 6:27:41 AM

please use hardward reference if you use reference in it this is project outline which you may need, thank you 24832954_1Project Outline .docx Hi, i just need the Resource part, it should be similar structure to Resource part which is provided in project charter 1. Just only Resource part, we don't need other parts (such as scope, governance). this is some explanation of Resource, it may be helpful. https://en.m.wikipedia.org/wiki/Resource_(project_management) Hi, I need solution to be well explained and in detail to Resource part in Research Grant Management System Project? project description and scope& governance parts can be cut short or deleted. thanks a lot.

len1620756

8/31/2017 3:25:47 AM

only write Project resource Part for RGMS Project. it could be similar to project charter which be provided. attachment A is RGMS requriements. other files are example. This would also be a good opportunity to revisit the team charter you created in your first assignment. As a team, decide if anything has changed or needs to be updated.

Write a Review

Project Management Questions & Answers

  Key terms intergeneational mobility

In three full paragraphs, integrate the key terms intergeneational mobility, structural mobility, and exchange mobility from the 20/20 on chris garners story.

  Describe importance of developing a global team perspective

Describe the importance of developing a global team perspective.- Highly functioning teams consider situations from a global perspective.

  What is the nash equilibrium of the second stage game

What is the Nash equilibrium of the second stage game if the entrant enters? Solve the game for each type of incumbent.

  What is the optimal order size in bags

What is the optimal order size, in bags? -  Given your answer in (a), how many times a year does PBK place orders?

  Present the nursing practice problem with the picot question

Will decreasing the amount of patient to nurse ratio reduce the risks of patient adverse events in the hospital setting?

  What is the process capability ratio cp

The difference between the upper specification and the lower specification for a process is 0.6". The standard deviation is 0.1". What is the process capability ratio, Cp?

  What are leads and lags

What are Leads and Lags? How do they relate to schedule compression methods? Which methods would you consider better first-choice methods by most project sponsors?

  How you would respond to each of the given situation

Discuss how you would you respond to each of the given situations: - Adam uses the blog to share personal information instead of communicating information about the team project.

  Explaining benefits of risk management

What are the different types of risk that organizations face? What are the benefits of risk management?

  What is the speed of sound in the substance

A 599 Hz sound wave travels through a substance. The wavelength of the sound wave is measured to be 233 centimeters. What is the speed of sound in the substance in m/s?

  How to put a campaign into practice

There are a number of practical issues when considering how to put a campaign into practice. Discuss these in relation to the case.

  When should the project manager form a project team

Show the Project teams are an essential part of most projects and depending on the project scope and work scope team membership is likely to change.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd