Reference no: EM131977990
A survey of 25 randomly selected customers found the ages shown? (in years). The mean is 32.68 years and the standard deviation is 10.04 years.
18 33 49 31 22
49 30 27 27 12
33 36 31 44 39
42 37 26 23 25
45 39 48 21 30?
a) Construct a 80?% confidence interval for the mean age of all? customers, assuming that the assumptions and conditions for the confidence interval have been met.
?b) How large is the margin of? error?
?c) How would the confidence interval change if you had assumed that the standard deviation was known to be 11.0 years?
a) What is the confidence? interval? (Round to two decimal places as? needed.)
b) What is the margin of? error? (Round to two decimal places as? needed.)
c) What is the confidence interval using the given population standard? deviation? Select the correct choice below and fill in the answer boxes within your choice.
?(Round to two decimal places as? needed.)
A. The new confidence interval is ? is wider than the interval from part a.
B. The new confidence interval is ? is narrower than the interval from part a.
What is the standard deviation of ashley portfolio
: The stock and bond funds have a correlation of -0.2. What is the standard deviation of Ashley's portfolio?
|
Confidence interval for true average
: Calculate and interpret a 95% (two-sided) confidence interval for true average CO2 level in the population of all homes from which the sample was selected.
|
Calculate the overhead cost applied during the year
: Calculate the predetermined overhead allocation rate. (Show calculation.) Determine the amount of over- or underapplied overhead. (Show calculation.)
|
What is your portfolio beta
: You form a $54,000 portfolio consisting of Microsoft, Target, and Sempra. What is your portfolio beta?
|
How would the confidence interval change
: How would the confidence interval change if you had assumed that the standard deviation was known to be 11.0 years?
|
The required rate of return on projects of risk
: Suppose your firm is considering investing in a project with the cash flows shown below, that the required rate of return on projects of this risk class is 7%
|
Should the company purchase the new trucks
: FIN700–Financial Management - Calculate the net present value (NPV), that is, the net benefit or net loss in present value terms of the proposed purchase
|
Prepare the federal income tax return for filing
: Based on the following data for Bronco, Inc., prepare the 2013 federal income tax return for filing. Bronco, Inc
|
Cumulative standardized normal distribution table
: Given a normal distribution with µ=100 and s=25?, and given you select a sample of n = 25 complete parts? (a) through? (d).
|