Reference no: EM133018688
CPCCBC4012B Read and interpret plans and specifications
Assessment Task - Knowledge Questions
1. How is the classification of a building or part of a building is determined?
2. What are deemed-to-satisfy provisions?
3. Refer to the handout ‘Garage Plan Assessment" drawing for a Double GARAGE project. Relate this drawing to the BCA, Volume 2, specifically, hierarchy of performance levels 3 and 4 (i.e., Performance Requirements and Building Solutions).
List the relevant "deemed-to-satisfy" provisions of the BCA associated with this project in regards to concrete.
4. The BCA classifies buildings or parts of buildings into classes. Using the table below:
a) Write a description of the buildings or structures for each of the class.
b) Write the class or classes appropriate for each of the following buildings or structures
5. When does a multiple classification apply to a building or construction?
6. Where can you find the performance requirements and criteria to ensure compliance?
7. How to identify performance-based solutions?
8. Explain how the goals of the BCA are achieved through performance hierarchy?
9. List and briefly describe in your own words, methods that can be applied to alternative solutions that will provide evidence of compliance with performance requirements?
10. List the documents that you can submit for BCA assessment to determine performance-based solutions.
11. What are passive fire control elements and provide three (3) examples?
12. What are active fire control elements and provide three (3) examples?
13. How do you determine FRL of a build?
14. What factors you have to consider while determining fire resistance requirements for a low-rise building?
Attachment:- Read and interpret plans.rar