How to draw up longitudinal sections for drainage lines

Assignment Help Civil Engineering
Reference no: EM13838939

Assignment

Aim: To design the stormwater drainage system for a retail building and car park.

Design Brief:

The accompanying diagram shows the plan details of a proposed retail building and an adjoining paved car park to be located in Ferntree Gully (37.89°S, 145.30°E) and a profile drawing of the metal roof showing seven box gutters. Each gutter is laid on a slope of 1 in 360 and terminates in a rainwater head with a downpipe that discharges the roof runoff directly to three junction pits. The junction pits convey the roof runoff, via interconnecting pipes, to a SEP labeled Pit 4. The two SEPs labeled 4 and 5 collect surface runoff from the 6.0m wide concrete walkway and paved car park, which is completely surrounded by a concrete kerb and channel. The resulting total runoff from the site is then discharged to an existing junction pit labeled Pit 6 on an existing DN600 RC municipal council stormwater drain. Assume the time of concentration to Pit 1 is 5 minutes.

Determine:

1. The design flow for each box gutter and downpipe based on an ARI of 100 years.

2. Suitable pipe sizes and grades for the car park drainage system based on an ARI of 20 years. Adopt FRC pipes (C=120) with a minimum DN of 225mm and at least 300mm cover. Aim for pipe slopes that minimise excavation where possible but ensure a minimum flow velocity of 0.8 m/s is achievable when running full on the slope adopted. Ensure a minimum pipe cover of 450mm in the road reserve and allow for 75mm obvert drops at each pit. Draw up the longitudinal sections to scale for both pipe runs as the design proceeds. Use the standard pipe sizing tabulation provided and make clear all assumptions made.

Report:

At least the following is to be included in your group report:- Assignment Cover Sheet (signed and dated), title page, brief executive summary, table of contents with sections and page numbers, the project brief, a typical diagram or sketch showing the details of the box gutter-rainwater head-downpipe assembly, all design computations and the drawings of the work including longitudinal sections along the drainage lines from Pit 1 to Pit 6 and Pit 5 to Pit 4. Drawings should be made to scale on A4 or A3 pages and must include a title, a clear border, and have the scale(s) stated. All work is to be performed to a professional standard.

Students to work in groups of three, share the tasks equally, thoroughly check each other's work, and take joint responsibility for all the work submitted.

Example of how to draw up longitudinal sections for drainage lines.

Reference no: EM13838939

Questions Cloud

Discuss whether fred is a resident of australia for taxation : Discuss whether Fred is a resident of Australia for taxation purposes. Explain why the receipts in Egerton-Warburton & Ors v DFC of T (1934) 51 CLR 568 were assessable, but the receipts in IRC v Ramsay (1935) 1 All ER 847 were treated as capital amou..
Explain discovered about the laws of abortion : explains what you discovered about the laws of abortion in your state (Louisiana) or country and why this information might be shared with clients. Further, explain your personal stance on abortion and how your ethical entanglements might impact y..
Write a memo to george readymix outlining : Write a memo to George Readymix outlining - You have summarised the direct labour costs and some of the key hardware and software costs in question - What additional costs are associated with this project? Be as specific as possible in your answer.
Financial fact sheet for scarlett company : Before you start: Study the Financial Fact Sheet for Scarlett Company and Gable Company.
How to draw up longitudinal sections for drainage lines : How to draw up longitudinal sections for drainage lines. The design flow for each box gutter and downpipe based on an ARI of 100 years.
Where you see yourself within these social constructs : Individuals seldom use these terms to describe themselves or others. However, oppression and privilege impact every aspect of people's lives. As you consider your own place in society, consider your emotional attachment to where you see yourself w..
Statements into the balance sheet : The balance sheet pulls pieces of the other financial statements into its layout. What are those pieces and do they pull the focus from the other statements into the balance sheet? Anyone else have thoughts on this--how do the statements interact ..
Compare the arguments of should we license parents : What issue is the author discussing in this article. What argument(s) does the author make
Do you think interracial marriage can help eliminate racism : Do you think interracial marriage can help eliminate racism? Agree or disagree. MLA format. Make sure thesis has clear and defined points

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd